High Speed 2

Christopher Pincher Excerpts
Thursday 13th October 2011

(12 years, 6 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Christopher Pincher Portrait Christopher Pincher (Tamworth) (Con)
- Hansard - -

Will my hon. Friend give way?

Stephen Hammond Portrait Stephen Hammond
- Hansard - - - Excerpts

No, I am sorry; I have only a minute and a half left.

There is a myth that local services will suffer as a result of High Speed 2. That is not true: local services are already at capacity. We need to do other things, but high-speed rail is not part of that argument. That is a diversionary tactic. There is also a myth, which has been brought up time after time today, that there is a £30 billion cost. Yes, of course the scheme will cost £30 billion, but Crossrail is currently costing us £2 billion a year. Crossrail will have a huge impact on London and create huge benefits for the commuting area of London and the south-east. If we look at the cost of Crossrail against the annual cost of High Speed 2, we see that they are actually a substitution for one another. It is quite clear that we can invest the £2 billion a year in rail infrastructure that the Government have costed for without affecting other investment.

The case is a good one and there are overwhelming reasons for it. The network is at capacity, the economy will benefit, the scheme will be at least carbon-neutral and, given that it does not start until after 2017, High Speed 2 is affordable.

--- Later in debate ---
Theresa Villiers Portrait Mrs Villiers
- Hansard - - - Excerpts

I will not just yet, because my time is short.

HS1 is an example of how high-speed rail can be designed in a way that mitigates and minimises the impact on local communities. Equal care will be needed in phase 2 with the link to Heathrow. Again, we will be careful to listen to the concerns of the hon. Member for Hayes and Harlington (John McDonnell) and his constituents.

My hon. Friend the Member for South Northamptonshire (Andrea Leadsom) spoke about the predictions of passenger growth for HS2. The consultation document forecasts that passenger demand will roughly double for long-distance services on the west coast main line, as was said by my hon. Friend the Member for Pudsey (Stuart Andrew). That projection is over 30 years and is based on modest growth rates of about 2% a year. If anything, those numbers are cautious when one takes into account the fact that demand between London and Manchester rose by almost 60% over the four years to 2008 and that overall long-distance demand has grown every year since 1997 at an average of 5% a year. There is a wide-ranging consensus, which has been echoed by many Members today, that the southern end of the west coast route will be completely full within 10 to 15 years, or possibly sooner as was pointed out by my hon. Friend the Member for Wimbledon (Stephen Hammond).

Christopher Pincher Portrait Christopher Pincher
- Hansard - -

Will the Minister say why she persists in using version 4.1 of the “Passenger Demand Forecasting Handbook”, which Sir Rod Eddington says offers wildly inaccurate demand predictions? Why does she not use version 5.0, which is waiting on her desk for her to sign off? It offers much more reasonable demand projections and would allow her to pursue options other than HS2.

Theresa Villiers Portrait Mrs Villiers
- Hansard - - - Excerpts

We believe that version 4.1 gives a more robust analysis of passenger demand forecasts. I am confident that whichever methodology one uses to predict passenger demand, we face a capacity time bomb on the west coast main line. Even our efforts in undertaking the biggest programme of rail capacity improvement for 100 years will not be enough to meet our long-term capacity needs.

We desperately need additional inter-city transport capacity, as was pointed out by my hon. Friend the Member for Cambridge (Dr Huppert). No responsible Government can afford to sit back and ignore this problem. High-speed rail provides the best way to meet that pressing economic need. Contrary to the allegations of its detractors, HS2 is not and has never been a project designed to shave a few minutes off the journey time to Birmingham; it is about delivering the inter-city transport links that are crucial for the future success of our economy in this country, in both the north and the south.