Access to Broadband Services

Ben Lake Excerpts
Wednesday 6th September 2023

(1 year, 2 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Ben Lake Portrait Ben Lake (Ceredigion) (PC)
- Hansard - -

It is a pleasure to serve under your chairmanship, Sir Christopher. I congratulate the hon. Member for Stirling (Alyn Smith) on securing the debate and making such an impressive introductory speech. Indeed, I agree with all his points, so I will try to keep my remarks brief.

As with other Members—especially those who represent rural areas—the need for better broadband is something that fills my inbox almost weekly. As the hon. Member put it, broadband and digital connectivity have become the fourth utility, so it is no surprise that in my constituency, where 14% of premises can receive speeds of only up to 10 megabits per second, a lot of people are concerned about improving their digital connectivity, given the demands of education, businesses and leisure. Sadly, in Ceredigion the percentage of premises that cannot receive what Ofcom describes as decent broadband is 2.2%, compared with the UK figure of 0.2%.

As others have, I place on record my belief that there has been great progress in recent years in improving broadband infrastructure, in Ceredigion as well as in other parts of the United Kingdom, but there is more that we should do. As others have mentioned, the Government could make changes to the gigabit voucher scheme and Project Gigabit to accelerate progress. One concern among my constituents in communities that do not have decent broadband—certainly not gigabit broadband—is that they will have to wait several more years before any progress is made with their communities.

Liz Saville Roberts Portrait Liz Saville Roberts (Dwyfor Meirionnydd) (PC)
- Hansard - - - Excerpts

Knowing my hon. Friend’s constituency, I am sure he will recognise the problem faced by the small community in Nantmor and Beddgelert in my constituency, where there is no mobile signal—an EE Home Office mast is in place, but it is not turned on—and a history of electricity outages, not over hours but over days. Analogue copper lines were switched off earlier this year, and the community is now awaiting a decision on whether the exchange will be eligible for a fibre community partnership. This is a real challenge—a real crisis—for many of our communities, and they have nowhere else to turn.

Ben Lake Portrait Ben Lake
- Hansard - -

I thank my right hon. Friend for that important point. In the 21st century, it is rather strange to stand here and talk about communities in the United Kingdom that are completely cut off from the outside world, especially during severe weather events. She mentioned a community around Beddgelert. I also have communities, such as Cwmystwyth, that have been told that, as soon as the copper landline network is switched off, they will have to depend on a broadband connection. Sadly, Cwmystwyth does not have one, and it does not have mobile signal, so it is left without any form of communication in the event of a storm.

As has been pointed out already, adequate and improved broadband infrastructure in rural areas can make a significant contribution to the community in not just a social but an economic sense. This afternoon, I received an email from a constituent who explained that she works for a company—a charity, as it happens—that is based and does work across the UK. She very much wants to stay in Ceredigion to continue that work, but she depends on a decent broadband connection. Sadly, where she lives is unlikely to receive an upgrade any time soon.

The last census showed that the population of Ceredigion constituency had dropped by 5.9%. We will not get into the technical detail of why that happened, but we know from covid in particular that a number of people who were doing hybrid working decided to relocate to Ceredigion. So rolling out good connectivity across the county would make a massive demographic contribution. It is probably worth emphasising that it would also make a contribution to the delivery of public services, getting staff into our schools, care homes and other important public services, which is something we already struggle with.

One thing I would like to emphasise is the good work that the Government have done to date on the gigabit voucher scheme. Ceredigion is very fortunate in being one of the pilot areas. I have tried to gauge the demand from communities to sign up to the vouchers, and I am pleased to say that communities in Ceredigion responded very positively—I believe it is one of the best areas in terms of the number of declarations of interest. Since then, community co-ordinators have gone to considerable effort to ensure that communities are aware of the different options and that they register their interest and their vouchers, and some communities have succeeded. Some communities in Ceredigion have had their broadband connections improved considerably, and it has made a fantastic difference.

However, as the hon. Member for Westmorland and Lonsdale (Tim Farron) mentioned, others have found themselves caught in a bit of a limbo in recent months, because the voucher funding does not seem to be forthcoming from BDUK. It is possible that that has to do with work the Government are doing with Project Gigabit in mapping out the intervention areas, and I would be grateful if the Minister could clarify that.

Nevertheless, some of the community co-ordinators and those participating in the schemes are growing restless. In Wales, they have seen the best part of a decade of promises of improved connectivity that have come to nothing, so it is inevitable that people start to question whether the schemes will actually work for them. I fear that a lot of the demand and interest will dissipate the longer we go without any real progress. Will the Minister clarify whether the Government intend to accelerate some of the voucher schemes in the interim as we wait for the Project Gigabit areas to take off? It strikes me that, where community areas have engaged with each other, organised and registered an interest, we might as well get on with connecting them. Even if that means that it is only a couple of hundred or 1,000 premises in Ceredigion, it is better than nothing.

That brings me to Project Gigabit and the intervention areas. Although I very much welcome the fact that the Government are investing so much money in that endeavour, I have a concern about part of Ceredigion—sadly, we have been split in two in this process; the north is in a type C procurement contract, and it remains to be seen what the south-west Wales lot will look like. The point I want to raise with the Minister and seek his assurances on is that we will not drag our feet in making a decision, as opposed to the south-west Wales lot. I have already heard rumours that a decision might not be made until summer 2024. I am told by industry officials that, once contracts have been awarded, there will be a good six months of scoping, surveys and all the preparatory work and that, depending on where people are, it could then be two or three years before the connection is sorted. That concerns me because many of these communities will be in rural areas that do not have a mobile signal. They have no alternative methods of connectivity, and that is holding them back.

As my right hon. Friend the Member for Dwyfor Meirionnydd (Liz Saville Roberts) mentioned, many of the hardest-to-reach properties lack any other form of communication. There needs to be greater co-ordination and prioritisation of the effort to connect the hardest-to-reach areas. By co-ordination I mean that we should think about the areas that lack a mobile signal, full fibre or broadband of any description and ensure that the digital switchover of landlines is paused. I know that that will entail work with BT and Ofcom, but that co-ordination is essential if we are to ensure that communities are not cut off.

In terms of prioritisation, I can foresee a situation with the Project Gigabit and intervention area approach whereby residents who currently enjoy superfast broadband download speeds of 17 megabits per second will be connected to full gigabit, which is great—fantastic. At the same time, constituents who currently lack any broadband whatever will still be left waiting. Will the Minister assure me that there will be some prioritisation and that premises that currently receive decent broadband are perhaps second in line to those that lack anything at all?