Winter Floods 2013-14

Barry Gardiner Excerpts
Thursday 8th January 2015

(9 years, 4 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

David Heath Portrait Mr David Heath (Somerton and Frome) (LD)
- Hansard - - - Excerpts

It is a pleasure to serve under your chairmanship, Sir Edward.

I will not say that it is delightful to come back to the subject of flooding, because I feel that I have spoken about it at rather frequent intervals over the past year, but it is extremely good to be having a reasoned and, I hope, informed debate. I am grateful to the Chair of the Select Committee, the hon. Member for Thirsk and Malton (Miss McIntosh), for introducing it and for the work that her Committee did on the report.

I welcome the report, which was done when we were under the greatest pressure in Somerset, but it might be instructive for a future Committee to look back on the consequences in areas such as Somerset—what was done later, what worked and did not work—to look, with the benefit of perhaps a year’s experience or so, at whether what was done was effective in reducing flooding, and to take evidence from local people. I know that there was not the opportunity to do that at the time.

In the main Chamber earlier, in business questions, the shadow Leader of the House, the hon. Member for Wallasey (Ms Eagle), said that the Government were unaware for a long time of what was happening in Somerset. I have to say that that was absolutely, categorically not the case. Looking back at the record, I first raised the issue in the House on 6 January, which I think was the first sitting day of last year. Furthermore, the issues on the Somerset levels have been known for many years. Again, without claiming any clairvoyance on my part, but simply because I speak for my constituents, I have repeatedly drawn attention to the need to do more to protect the levels, including in a clear statement in 2009 on what dredging was needed.

It is reasonable to say that nothing would have removed completely the hazard last winter, when we had unprecedented levels of rainfall, but things could have been done that would have mitigated the effects, got the water away more quickly and reduced the impact on local communities. There were three basic reasons why those things were not done.

The first is the basic neglect of an artificial landscape. To me it is obvious that we need to maintain the structures that drain the Somerset levels if we want to retain the current form of its unique landscape, but that was not obvious to those who thought it was somehow possible to reduce maintenance while still preserving that unique environment.

The second reason is the malign effects of cost-benefit analysis and Treasury rules. We understand why they are in place, but they do not help when a small, dispersed population faces a massive problem. They are designed to protect cities and urban areas, and do not protect rural areas. I am glad that the hon. Member for Thirsk and Malton drew attention to the need to look at the importance of not only agricultural land but rural communities in flood protection zones.

Barry Gardiner Portrait Barry Gardiner (Brent North) (Lab)
- Hansard - -

The hon. Gentleman is absolutely right to highlight the importance of maintaining the landscape. Does he agree that certain changes in land management practice have been a real contributory factor to the problems in Somerset? In particular, there is the pursuit of maize as a crop, which leaves soil bare over winter, allowing it to flow into rivers and be washed away, and the increased subsidy for removing vegetation from the uplands. Changes to the landscape as a result of that changed land management practice have had a really important impact.

David Heath Portrait Mr Heath
- Hansard - - - Excerpts

It is undoubtedly true that changes in land management have an effect. Land compaction and the growing of different crops on more upland areas affect the rate of flow into what is effectively a large sponge. I have lived in Somerset all my life, and the landscape is still pretty recognisable as what it was when I was a boy. We could not really say that there has been a revolution in agronomy in the area; it is still principally a livestock area, and crops are grown there as forage rather than as commercial crops. Although the hon. Gentleman makes an important point, which I will come back to later, it is possible to overstate land management as part of the cause and effect.

The third reason for the lack of action I mentioned was in my view an environmental heresy, namely the decision, for some reason, that the watercourses in Somerset were the centre of ecological interest, rather than the land in between them. That is, I am afraid, nonsense. The watercourses are artificial drainage channels. It was ridiculous to “save” the flora and fauna of the drainage channels but lose the irreplaceable flora and fauna living on the land in between them; that has been the effect.

I will deal quickly with what has happened since. The Government have done an awful lot of the things we asked them to, and I am grateful to Ministers for that. We were lucky: we had the attention of the national and, indeed, the world media for a short period of time. If the Thames valley had flooded before the Somerset levels, we might not have attracted the same attention. We secured visits from very senior members of the Government: the Prime Minister made a number of visits, as did the Deputy Prime Minister and more than one Secretary of State, as well as the Minister with responsibility for floods. We were very grateful that they came to see for themselves what needed to be done.

--- Later in debate ---
Barry Gardiner Portrait Barry Gardiner (Brent North) (Lab)
- Hansard - -

I begin by welcoming you to the Chair, Mr Walker, and thanking you for your guidance in the remainder of the debate. I congratulate the hon. Member for Thirsk and Malton (Miss McIntosh), the Chair of the Select Committee, on an interesting report. I echo the tribute that several hon. Members have paid to the volunteers who helped others during the floods, and to those who worked around the clock to save life and property.

The risk of flooding has increased and is increasing. The Government abandoned our focus on reducing flood risk, and they abandoned the commitment they made before the 2010 election to deliver on the findings of the Pitt review, which would have reduced the cost of flooding to well-being and the economy. In that, the Government failed the country last winter. In addition to gradual changes in patterns of rainfall and a rise in sea level, climate change is likely to result in an increase in the frequency and severity of extreme weather events such as the floods and storms of last winter. The risk of catastrophic flooding happening in England within the next two decades, causing in excess of £10 billion in damage, now stands at one in 10—a 10% risk. That is the risk of a flood 10 times more damaging than the 2013-14 floods and three to four times more damaging than the widespread flooding of 2007. The Minister will know better than anyone that we are completely unprepared for such a flood, which would be four times greater than the largest civil emergency since the end of the second world war.

Dan Rogerson Portrait Dan Rogerson
- Hansard - - - Excerpts

I am keen to hear the hon. Gentleman develop his argument on the way forward, looking at the Select Committee’s report and the Government’s response. He seems to be suggesting, however, that actions taken or not taken by this Government over our period of office led to the flooding of properties during the winter floods of 2013-14. I should be grateful if he let me know specifically which of those properties flooded as a result of a change in policy. We heard from my hon. Friend the Member for Somerton and Frome (Mr Heath) about some policies that had been changed over a number of years, and there are schemes that have been in development in other parts of the country, which may have a problem. I am concerned to clarify whether the hon. Gentleman was alleging that there were properties that were flooded through the fault of the Government, rather than as a result of the extreme weather. The future is a different matter, and we can debate that at some length, but I am specifically concerned about the winter of 2013-14.

Barry Gardiner Portrait Barry Gardiner
- Hansard - -

It is quite clear that the Government abandoned the focus on reducing flood risk. They took it out of the Department’s priorities. That was one of the first things done in 2010. They abandoned that focus and reduced the budget dramatically, and as a result the Environment Agency was much less well prepared, financed and resourced to cope with the floods. The Minister knows perfectly well that hundreds of posts were taken out of the Environment Agency, not only back-room posts but front-line ones.

Dan Rogerson Portrait Dan Rogerson
- Hansard - - - Excerpts

It is absolutely true that we delivered efficiencies right the way across Government. The hon. Gentleman knows the financial position that the Government were left when we came into office. The point that I sought to make was not about the available resources and so on, but about the results. I am sure he would agree that it is possible to be more efficient and still have guaranteed outcomes. There have been problems, and it is devastating for anybody to experience flooding. I will have the opportunity to talk about that and to respond to some other points later on—

--- Later in debate ---
Barry Gardiner Portrait Barry Gardiner
- Hansard - -

I am grateful for your guidance, Mr Walker. I am happy to engage with the Minister— we have engaged in many debates on such issues—but he has to acknowledge that, after coming into office in 2010, his Government specifically removed flooding from the Department’s priorities. He can only accept that that meant that the country was less well prepared for last year’s floods and is now critically less well prepared for the future. I am interested to see whether the Minister will pick this up in his remarks, but we now have a 10% risk of a flood that is 10 times greater than the flooding of 2013-14 and four times more damaging than the widespread flooding of 2007. The Minister knows that that issue must be addressed, and unfortunately the Government have not even begun to address it. Last year’s floods have passed, and the broken promises to flooded communities have been forgotten. The Government think they have got away with it.

I will briefly address the Government’s responsibility for the impact of the 2013 floods, but my comments will focus on how policy should have changed since the floods and how policy has not changed. Among the Government’s blunders, the 2013-14 floods stand out as an example of the real pain that incompetent Governments can cause to communities and businesses—I acknowledge that the Minister touched on that. For the communities and businesses affected, the floods were not simply a natural disaster. The Government slashed investment in flood protection when they entered office, and with that they broke the promise they made before the election to deliver on the findings of the Pitt review of the 2007 floods.

Baroness McIntosh of Pickering Portrait Miss McIntosh
- Hansard - - - Excerpts

The Committee obviously greatly misses the hon. Gentleman. From the evidence we have heard I am having great difficulty reaching the same conclusion of a 10% increase in the risk of flooding. On what is he basing that conclusion?

Barry Gardiner Portrait Barry Gardiner
- Hansard - -

I am happy to advise the hon. Lady that I am basing my conclusion on the reports and work of the adaptation sub-committee and the Committee on Climate Change. If she is interested, I will happily send her the references.

The Government not only cut the budget for new defences; they decided to stop maintaining existing defences properly, and they cut the budget by 20%. Why? Because they cannot cut a ribbon on an essential maintenance project—they need new projects for that. The decision to remove flooding from the Department’s list of priorities was never just about the previous Secretary of State’s illiterate theories on climate change; the larger issue is the Government’s rejection of the responsibility to protect people from risks that are beyond their control. It was interesting to hear comments earlier in the debate about the need for the Government to step in and about Flood Re, which I echo. Both coalition parties supported the Pitt review strategy that the previous Labour Government were delivering before 2010, but both parties abandoned it straight after the election because they felt they could get away with it. They crossed their fingers and hoped that no one would notice the unbuilt defences, the collapsing sea walls, the eroded riverbanks and the clogged up culverts. Forty-six of the Pitt review’s 92 recommendations have not been implemented.

David Heath Portrait Mr Heath
- Hansard - - - Excerpts

Before the hon. Gentleman gets too carried away with the idea that, somehow, the flooding in Somerset was all the result of the current Government’s misguided decisions, I remind him that the rivers in Somerset, the Parrett and the Tone, have not been dredged not for four years but for 25 years. We drew attention to that throughout the period of the Labour Government. In 2009 I told the House:

“I am convinced that if we had proper dredging of some of our rivers and proper clearing of debris and strengthening of banks on some of the smaller tributary streams, it would make a substantial difference to the way in which we deal with these matters.”—[Official Report, 12 March 2009; Vol. 489, c. 553.]

It was not done by his Government, so let us stop the nonsense of pretending that the 2013 floods were the result of this Government’s actions. They were the result of long-term neglect.

Barry Gardiner Portrait Barry Gardiner
- Hansard - -

I am sorry that the hon. Gentleman is getting so exercised. He was the responsible Minister in the Department at the time, and I understand that he wishes to protect his record but, equally, he must accept—I am sure he knows this—that after the 2007 floods the previous Government made huge efforts both to ramp up the funding—[Interruption.] He does not disagree with that.

David Heath Portrait Mr Heath
- Hansard - - - Excerpts

I am telling the hon. Gentleman that not a penny was spent on dredging in Somerset, which is where the floods were. Does he remember?

Barry Gardiner Portrait Barry Gardiner
- Hansard - -

The hon. Gentleman has a very selective memory, because the floods were not only in Somerset. In fact, more houses were flooded on the Thames estuary than in Somerset, so he must be selective in his memory. My point is that, after 2007, the previous Government undertook a huge programme and established the Pitt review. Both the hon. Gentleman’s party and the Conservative party said they would continue to implement the review, but neither did so when they got into government. He cannot say other than that because it is the truth, as he knows. I would be happy to give way to him once again if he wants to deny it on the record, but it is the truth, and I am afraid he really has to accept that.

Flooding not only destroys property, it makes homes unliveable for months and sometimes years. Flooding ruins businesses and destroys crops and livestock. We learned from the 2007 floods that those affected by flooding display between a twofold and a fivefold increase in stress and depression. The effect of flooding on people’s lives is enormous and long lasting, which is why prevention is so important, but the Government chose to cancel new flood defences, slash maintenance and sack front-line flooding staff.

The Government like to talk about competence, but we all remember the chaotic infighting between the previous Secretary of State for Environment, Food and Rural Affairs and the Secretary of State for Communities and Local Government when so much of the country was under water. We all remember the failure to recognise the emergency until it hit the south-east. The Chair of the Select Committee alluded to the argument over the size of the pump and the capital expenditure and revenue dispute, which delayed action at the time. I agree with her call to consider this in terms of total expenditure, and I hope that change will eventually come. Her Committee makes an important point on that in its report.

We all remember the Prime Minister’s cruelly disingenuous promise that money is no object, and it is difficult to decide whether the original statement or the retraction of it in November marked a lower point. Will the Minister confirm how much of the flood support package for home owners and businesses has been received by those affected? Thankfully, many people were protected because, as the Committee on Climate Change has pointed out, the previous Government implemented 46 of the Pitt review’s key findings to increase our resilience to flood emergencies. We established the flood forecasting centre in 2008 as a joint venture between the Environment Agency and the Met Office. As the December 2013 tidal surge hit, the Environment Agency issued 160,000 flood warnings, and an estimated 18,000 people were evacuated from homes in coastal areas. At one stage during the surge, 64 areas had the highest warning level in place, reflecting a danger to life.

What lessons were learned? What has changed since the floods of last year? Many thousands of people were forced to leave their homes last winter. Transport was disrupted for weeks, in some cases months. Businesses were wrecked, and many closed and never reopened. After the flood, the Government promised that they had reviewed their approach to flooding and that the autumn statement would contain a proper long-term flood risk strategy. Well, the National Audit Office and the Committee on Climate Change reviewed that investment programme and found that nothing has changed. Three quarters of flood defences in England have not been maintained according to their identified needs in 2014-15. The Government’s investment plans will see the number of properties at significant risk rise by 80,000 every five years.

The budget for the ongoing maintenance of flood defences was cut by 20% in the 2010 spending review and has not been restored. The failure to maintain flood defences to the required standard has increased the risk of high-consequence flood defences, such as sea walls, failing. The failure of such defences would put lives as well as livelihoods at risk. I need to impress on the Minister that that is not simply my view but that of the National Audit Office and the Committee on Climate Change, and he really needs to take notice of it.

The failure to maintain flood defences to the required standard has led to a huge increase in flood risk. The Government have put the headline first. Of the

“over 1,400 schemes going ahead across the country”

announced by the Chancellor, only 310 are fully funded, and only 97 of those 310 are new. Some 1,119 of the 1,400 schemes may never receive full funding, because they are eligible for only 20% grant in aid funding—the rest has to be made up by partnership funding. The black hole in the Government’s funding announcements could be as large as £830 million.

The Government say their plans will reduce flood risk by 5%—true, but disingenuous, and the Minister knows that very well. The Government have put a cheap headline ahead of reducing risk for the most vulnerable. Instead of focusing on reducing risk for high and medium-risk households, they have focused on moving households at low risk into the lowest risk category. That is completely irresponsible. Limited capital investment should be protecting homes at high risk, which is a one in 30 risk, or at medium risk, which is a one in 75 to a one in 100 risk, rather than being used to provide additional protection to those at low risk, which is a risk of one in 1,000 or more. That is how the Minister gets his 5%, but it is meaningless—it is wrong.

This decision will put more homes, lives and livelihoods at significant risk. In a sign of just how far the Government are willing to go to get their headline, they chose to exclude consideration of risk to life from their analysis. If the Minister wants to deny that, let him challenge me now, but the evidence is there in the impact assessment: the Government have left out of it any assessment of risk to life. How could a Minister ask their civil servants to prepare such an assessment for them?

Does the Minister agree with the Committee on Climate Change and the National Audit Office that the number of properties at risk of flooding is increasing? If not, will he give us his figure for the predicted net change in the number of properties at high and medium risk over the next five to 10 years? Will he confirm that although his 5% net reduction figure is true, it is also true that the number of properties at high and medium risk has increased? Will he have the good grace at least to blush when he acknowledges that?

Will the Minister confirm that the long-term investment strategy assumes, against the evidence, that development on the floodplain will stop after 2014-15? The Committee on Climate Change says that 20,000 new properties are built on the floodplain each year, including 4,000 a year in areas of significant flood risk. Does the Minister disagree?

The Government’s strategy says:

“We have tested our findings against a range of possible climate change projections using the latest scenarios.”

However, if we read further, we find that the strategy assumes minimal climate change. The assumptions section on page 18—I challenge the Minister to read it—states:

“The main assumptions in this ‘baseline’ result are that the climate will change in line with the medium rate of change in UKCP09”—

UK Climate Projections 2009—

“and that no allowance is made for development in the flood plain.”

Baroness McIntosh of Pickering Portrait Miss McIntosh
- Hansard - - - Excerpts

I am following the hon. Gentleman’s argument carefully, although it is for the Minister to respond from the Government’s point of view—good luck! However, what would the Labour party do were it to form a Government? That is the missing link.

Barry Gardiner Portrait Barry Gardiner
- Hansard - -

The hon. Lady and I have worked in partnership for many years, but I did not expect her to be my straight man in quite that wonderful fashion—I was just coming to that point, so I thank her very much.

The point I want to press is that, instead of planning for the worst, the Government are ignoring the inconvenient truth: they are ignoring the risks and abandoning the most vulnerable.

The Chair of the Select Committee asks what the Labour alternative is. The Government scrapped our approach to flooding and climate change, which was based on the findings of the Pitt review into the 2007 floods. They abandoned our focus on reducing flood risk. They abandoned our commitment to invest to protect the most vulnerable and to reduce the cost of flooding to well-being and the economy. We will deliver on the findings of the Pitt review—the other 46 recommendations, which have still not been implemented. However, a Labour Government will go further. We will introduce a new national adaptation plan based on the Committee on Climate Change’s recommendations, because that is the only way to ensure that all sectors of the economy and all communities are prepared for climate change. We will end the confusion and chaos in flood investment by establishing a national infrastructure commission to identify our long-term infrastructure needs and get cross-party support to meet them.

I conclude as I began: the risk of flooding has increased, and the risk of a catastrophic flood is increasing. The Government failed the country last winter. Now, they have tied themselves to a plan that risks catastrophic failure in the future. The Prime Minister was tested in last year’s floods, and he failed that test. Shortly, the electors of our country will have the opportunity to ensure that, when the next floods come, he is no longer in charge and in a position to fail again.

Dan Rogerson Portrait The Parliamentary Under-Secretary of State for Environment, Food and Rural Affairs (Dan Rogerson)
- Hansard - - - Excerpts

It is a pleasure to serve under your chairmanship, Mr Walker. I apologise if I tested your patience a little with my interventions. I now have the opportunity to respond to and probe the arguments of my hon. Friend of sorts—the hon. Member for Brent North (Barry Gardiner). Your predecessor in the Chair, Sir Edward, was so keen to hear the remaining speeches that he hoped we would conclude before he left. As it turns out, however, we have now had the benefit of your chairmanship, for which I am grateful, as well as that of Sir Edward, who presided in such great style earlier.

I thank the Chairman of the Select Committee, the hon. Member for Thirsk and Malton (Miss McIntosh), for all the work she and the Committee have done. I might be seen as a little biased, having served on the Committee in the past. So, too, has the hon. Member for Brent North, and other members of the Committee are also present. The Committee has done the House and the country great service on many topics, and its contribution to this debate is very helpful. It is always a matter of great excitement for Ministers to be called before it, and I enjoy that as much as I am sure my predecessors did. I congratulate the Chairman on securing time for the debate through the Liaison Committee.

I want to start by setting some of the issues in context. As my hon. Friend the Member for Cleethorpes (Martin Vickers) said, we have had a number of these debates—some have covered issues relating to his constituency—and my hon. Friend the Member for Somerton and Frome said the same. None the less, it is important that we remind ourselves of the extreme levels of rainfall and the impact of the weather during the winter of 2013-14. There were record levels of rainfall, and it was the stormiest period for at least 20 years. There were record river flows, sea levels, wave heights and groundwater levels in many locations, and that led to the flooding of more than 8,300 homes, and caused damage or disruption to businesses, infrastructure, transport and utilities. Like other hon. Members, I have seen the damage caused by last winter’s flooding, and its devastating impact on people’s day-to-day lives. My sympathies go out to all those affected, especially those who still cannot go home.

There has been a major Government recovery effort to help people to get back on their feet, which included committing more than £560 million in recovery support funding. Many organisations were involved in responding to the exceptional weather, including the Government and their agencies, the emergency services and the military, and many voluntary organisations, as well as transport and utility companies. As the hon. Member for Vale of Clwyd (Chris Ruane), who is no longer in his place, said, individuals stepped forward to help neighbours and vulnerable people as part of the response effort. Also, people elsewhere who had seen what was happening wanted to help in some way and send assistance, which was gratefully received in areas such as the Somerset levels.

We have reviewed what happened and made improvements, which mean that we are now better prepared for flooding. In England alone, 844 flood defence assets were damaged last winter, including those managed by the Environment Agency, local authorities and internal drainage boards. In response to the exceptional weather, DEFRA made an extra £270 million available to repair, restore and maintain the most critical flood defences. Repair work at many of those sites started as soon as weather conditions allowed and, thanks to the tremendous effort by all involved, all areas will have at least the same standard of protection as they did before that winter. In discussions earlier with Environment Agency colleagues, I heard that their counterparts in the Netherlands, who watched the efforts here with interest and offered some input as to what they do in their jurisdiction, were incredibly impressed with the speed with which the repairs were done. It is good to hear praise for the excellent work done by the Environment Agency, its contractors and the local authorities it works with; they put tremendous effort into restoring the defences, given the investment.

Permanent defences were restored to more than 200,000 properties on schedule, by the end of October, and, for a small number of sites where repairs are continuing, contingency measures such as mobile pumps and temporary flood defences have been put in place to ensure that communities are protected until completion. More than 99% of permanent repairs should be completed by March, assuming that there is no further damage over the next few months—something that we need to keep a close eye on. For the remaining three sites, permanent repairs are not expected to be completed until March 2016. Interim contingencies are in place for all three sites. We are investing £3.2 billion in flood management in the current Parliament. That is a real-terms increase, and £500 million more than was spent in the previous Parliament. It includes both capital and resource funding. We are also making a record £2.3 billion capital commitment to improving defences, which is a further 9% real-terms average increase.

On 2 December we published a flood defence improvement project pipeline. We will be investing in more than 1,400 projects across the country over the next six years. That investment will protect more than 300,000 properties, in addition to the 230,000 households already protected so far this Parliament, keeping families safe from the misery that flooding can cause. It will also protect more than 420,000 acres of agricultural land, 205 miles of railway and 340 miles of roads. That investment is not just about protecting people’s lives and property now and in future. Throughout the country, businesses, infrastructure and farmland will also benefit. We estimate that our record investment will help to prevent about £30 billion of economic damage, including giving a £1.5 billion boost to the farming sector. That is an average of at least £8 in benefit for every £1 invested. There was some discussion earlier of the impact on the Somerset levels. Although quite a low number of properties suffered inundation, the economic impact lasted a long time. Rural and some urban communities had additional transport needs, and daily life was interrupted, and we must take account of that wider effect in what we do.

Tackling the risk of flooding can also help economic development and growth, unlocking opportunities for inward investment and helping to create and sustain jobs. We estimate that the benefits to the local economy are worth an additional £4 to £9 per £1 invested. Local enterprise partnerships, along with local authorities and other private sector partners, have increasingly been taking account of such issues in local growth bids when deciding where to invest for communities. That gives us confidence that the partnership model is the best approach. We can attract extra investment alongside Government investment through grant in aid.

What I have outlined demonstrates the Government’s commitment to reducing flood risk. However, that is not a task for the Government alone. Our partnership funding approach, which was introduced in 2011, has already exceeded our expectations in enabling others to contribute. We expect that the investment programme that we announced last month will attract more than £600 million pounds in local contributions, to expand on the work that could be done by Government alone. The Government will legislate to ensure that businesses’ contributions to flood and coastal erosion risk management schemes are tax deductible, as a way of incentivising their investment.

Barry Gardiner Portrait Barry Gardiner
- Hansard - -

What percentage of the previous target for partnership funding has been realised?

Dan Rogerson Portrait Dan Rogerson
- Hansard - - - Excerpts

I think we are on course to achieve about £140 million—I will confirm that in writing—during the present financial period to invest in those schemes. That compares with about £13 million under the previous Government, so it is a big step forward.

Barry Gardiner Portrait Barry Gardiner
- Hansard - -

As a percentage of the target.

Dan Rogerson Portrait Dan Rogerson
- Hansard - - - Excerpts

The hon. Gentleman was keen to point out that many of the schemes in the pipeline will require partnership funding. We have never sought to hide that fact: it is out there. It means that record investment can go even further. We also want to continue to secure efficiencies in delivery. The hon. Gentleman has talked about the resources available and the number of staff in the Environment Agency, but it is outputs that are important.

I pay tribute to the Environment Agency for the way in which it, like many other public sector organisations, has had to adjust to the reality of the deficit that we were left, and the need to tackle it. The shadow Chancellor has been keen to get out and persuade everyone that he gets it now, and understands the importance of dealing with it; and we have all had to tackle it. The Environment Agency has done particularly well in generating efficiencies—for example, taking out the regional tier, which is difficult in any organisation. It did it, and has been able to spend the resources made available by the Government more efficiently than ever, so that we can proceed with the investments. Because of the Government’s £3.2 billion investment in flood risk management during the current Parliament and the record levels of investment announced in the autumn statement, we will over the next six years reduce by 5% the risk that flooding poses to communities and businesses across the country.

There were several discussions during the debate about the effectiveness of dredging. Dredging and contour planting are tools that can help to reduce flood risk. Each catchment is different. It would in many cases be wrong to dredge where there is a fast-responding catchment. I am not an expert, but it seems to make sense that speeding the water to the next pinch point will cause problems further along the catchment. In landscapes such as those I saw in Somerset where the rate of flow is not the swiftest in the world—landscapes that, as my hon. Friend the Member for Somerton and Frome pointed out, are man-made—what is needed when there is a huge volume of water is to try to help it to get out to sea.

Dan Rogerson Portrait Dan Rogerson
- Hansard - - - Excerpts

I have heard other Members of this House seek to debate that fact with my hon. Friend, so I am convinced of his expert knowledge of the area in which he grew up, and which he now represents so effectively.

We had many visits from right hon. and hon. Friends to the area in Somerset. As my hon. Friend knows, I was appointed in October, and the first east coast surge came a few weeks later, in early December. I went with him to Somerset early in the new year to see the impacts for myself, and came back with him and other hon. Friends to make the case for dredging work, which I am pleased to say has now taken place, as he pointed out. We hope that it will make a difference—not, as he said, by making the Somerset moors and levels bone-dry for the foreseeable future, but by helping with the management of that important landscape.

The effectiveness of dredging in managing flood risk varies from place to place. In some areas, dredging is the most cost-effective approach; in others, it would divert resources away from other flood risk management activities that are far more beneficial to local communities, such as maintaining pumps, sluice gates and raised embankments. It is right, therefore, that the Environment Agency should assess its value carefully, taking account of the other options available on a location-by-location basis, while working in very close consultation with local communities and organisations, a point made repeatedly and rightly by my hon. Friend the Member for Cleethorpes.

Approximately £10 million of the extra £70 million allocated by DEFRA to maintenance this financial year and the next is being invested in dredging. That is in addition to the dredging recently completed in Somerset. Maintenance and other flood risk management work is not just about what the Government can do; we want to enable others to undertake maintenance, including in partnership with the agency. The Government recognise and support the important work undertaken by internal drainage boards to manage water levels, reduce flood risk, support local growth and protect critical infrastructure.

There are excellent examples of partnership working between the Environment Agency and IDBs; my hon. Friend the Member for Thirsk and Malton was keen to make that point, and she was absolutely right. That includes sharing work programmes and agreeing to work together, for example by completing work on one another’s behalf through public sector co-operation agreements. There are now 28 public sector co-operation agreements in place and a further 30 agreed in principle, and the Environment Agency has already undertaken some work on behalf of IDBs. Such agreements can create efficiencies, and we want many more agreed over the next year. Recent work by IDBs on main rivers has included grass cutting, weed control, tree work, dredging, obstruction removal, operation of sluices and incident response.

During the summer of 2014, the Environment Agency held meetings across the country to explain the agency’s maintenance plans and give local stakeholders an opportunity to contribute to them and influence the maintenance programme for the year ahead. Maintenance plans for 2015-16 will be shared with IDBs and other risk management authorities early this year. We are grateful to IDBs for their help in the exercise to identify potential areas for dredging, as it is helping to build our evidence base on where dredging can be beneficial in managing flood risk. The evidence gathered is being assessed by the Environment Agency. Alongside evidence on other flood management options, it will help to ensure that the available funding is prioritised as effectively as possible.

The issue of agricultural land has been raised. As stated in the Government’s response to the report, we very much agree with the Committee on the importance of agriculture to the rural economy. The Environment Agency prioritises flood risk management asset maintenance according to the highest benefit, helping protect approximately 50% of the agricultural land at flood risk in England, including the majority of the most productive grade 1 and 2 land. As I have explained, we will spend more than £3.2 billion over the course of this Parliament on flood and erosion risk management, and much of the 1.3 million hectares of agricultural land at flood risk will benefit from that investment.

Capital investment also helps. Projects in the last three years have provided an improved standard of flood protection to more than 235,000 hectares of farmland. We made changes in 2011 to introduce financial contributions for worthwhile schemes to increase flood risk management work through the partnership funding we discussed earlier. Rural areas are benefiting from that approach; about 25% more schemes are proceeding with DEFRA grant in aid than would have been possible under the old rules.

Flood insurance was mentioned by a number of hon. Friends, and by the hon. Member for Vale of Clwyd, who is no longer in his place. I am grateful to my hon. Friend the Member for Somerton and Frome, given his experience in the Department prior to mine, for setting out the huge amount of work going on to deliver the Flood Re scheme. It is a very detailed form of negotiation, and we must ensure that it works effectively and does the job that it is designed to do.

I was a little disappointed that the hon. Gentleman opposite—I am not pointing at the shadow Minister, but over his shoulder to where the hon. Member for Vale of Clwyd was sitting, although he has, sadly, been called to business elsewhere—felt that the scheme was failing in some way. Actually, although it is an involved negotiation, we are delivering on it, and I pay tribute to all those across Government who have been involved in ensuring that we get it right, as well as to colleagues in the Association of British Insurers. We have been negotiating, which sometimes leads one organisation to face another across a table, but there is a spirit of co-operation on delivering Flood Re, which I think will make a difference.

I say to colleagues whose constituents have had problems obtaining insurance that I understand those frustrations. As my hon. Friend the Member for Somerton and Frome said, I recently attended a meeting in Somerset with constituents and representatives of others about some of those problems. Flood Re will help, which is why it is important that we move forward on delivery. I look forward to the opportunity to do something similar in his constituency, so that we can talk about some of the problems.

Barry Gardiner Portrait Barry Gardiner
- Hansard - -

I am grateful for the Minister’s clarification of the remarks made on Flood Re. Can he expand on how he envisages Flood Re will work, over the next 25 years, to move the consumer towards risk-reflective pricing, as it is supposed to? Although Flood Re certainly postpones that question, it is not clear how the transition to risk-reflective pricing will be made.

Dan Rogerson Portrait Dan Rogerson
- Hansard - - - Excerpts

Clearly, the Government’s responsibility across that period—the hon. Gentleman has alluded to the importance of considering the issue, modelling based on our changing climate and so on—is to continue investing in defences, but also to be clear in planning. My hon. Friend the Member for Somerton and Frome pointed out that earlier in the last century, perhaps it was not quite as clear that development should take place in areas that will not add to problems for the future. That is not to say that there should never be development in areas that are technically floodplains; as a London MP, the hon. Member for Brent North will know that a great deal of this wonderful city is in that situation, which is why we have the Thames barrier and other schemes moving forward. We want that economic development and investment. There are other towns, cities and villages in the same situation, but we must take account of the risk and deal with it as part of any development.

Barry Gardiner Portrait Barry Gardiner
- Hansard - -

That raises a point of contention that I put to the Minister. He has acknowledged, and I accept—indeed, I made this point—that there still is, and will continue to be, development on the floodplain, so why, in the main assumptions in the baseline result, is that precisely excluded from the Government’s own projections when they assess risk?

Dan Rogerson Portrait Dan Rogerson
- Hansard - - - Excerpts

We are clear that we should not develop on floodplains in a way that will leave the new properties at risk. We are talking about areas that are currently protected, or that will be protected as part of development. There are ongoing local growth scheme investment programmes aimed at economic regeneration that involve flood protection as part of development. That money comes from a different source from flood defence grant in aid, allowing those communities to continue to grow and enabling us to see that investment. However, we want to ensure that we continue to invest in flood defences in order to keep people and communities safe. By using partnership funding, we can make that money go even further.

The hon. Gentleman sought to set out particular groups, saying that he felt that some might benefit more than others in the categories that he mentioned. I hear on a daily and weekly basis from hon. Members throughout the House on their concerns about areas in their constituencies. The pipeline of projects announced in December sets out for hon. Members a great deal of ambition on how we can protect their communities and keep them safer. It has been welcomed by local authorities and those communities, and they can now seek to put those funding packages together.

I was involved in a debate—not a debate, but a reflective piece—on a local radio station this week, looking back to the period we are considering today, considering what has changed since then and talking about how the partnership funding is coming together from the different local authorities in the area and the private sector to deliver a project. In that local community, they do not expect the Government to fund the whole project through grant aid. They understand the principle of partnership funding and they are participating in delivering that solution.

Barry Gardiner Portrait Barry Gardiner
- Hansard - -

The point I am making is a good deal simpler than that, and it does not involve partnership funding. It is simply that the Committee on Climate Change says that 20,000 new properties are being built on flood plains each year, 4,000 of which are being built in areas of significant flood risk, and yet the long-term investment strategy that the Government have in place assumes that there will be no further building on flood plains. Why?

Dan Rogerson Portrait Dan Rogerson
- Hansard - - - Excerpts

As always, I welcome the work of the Committee on Climate Change, but the basis upon which it has made its calculations is a 2009 report by the Environment Agency, which will be updated this year. We look forward to seeing what the Committee makes of the updated calculations, which reflect the position now. Our mapping and understanding of flood risk is improving and growing all the time.

I want to turn to the issue of response.

Dan Rogerson Portrait Dan Rogerson
- Hansard - - - Excerpts

When one is dealing with a market such as insurance, there is a complicated picture. There are brokers that can help with those discussions, helping to find the right policy in those locations and working with those companies that are prepared to take account of mitigating factors. I hope that my hon. Friend agrees that that is an incentive for those companies; they will get that business. Also, Flood Re, by giving some confidence to insurers that the flood element of the policy can be supported and underwritten, will mean that those insurers can compete on the other aspects of the policy as well, and that will help a great deal in this situation. I very much welcome the support that we have had from across the House in moving towards the introduction of that policy.

I turn now to the issue of response. Following the events of last winter, action has been taken at all levels of Government to improve the country’s resilience and response capability. The floods highlighted the valuable contribution that our armed forces can make to the response to domestic emergencies. New arrangements have been put in place to strengthen military involvement in local emergency planning and preparedness, and to make it easier for responders to access support from the armed forces in an emergency if they need it. Perhaps the issue that my hon. Friend the Member for Somerton and Frome was pointing to in discussing local experience was about when the armed forces are called. Certainly, we made it absolutely clear from the centre that that resource was available. Perhaps the problem was about perception, not reality, and what the impact might be on a local situation if that support was called on. Ultimately, the armed forces were deployed and they made a real contribution, so we are just making it clear that as they are involved in the planning process, all those relationships are much clearer, and local communities can have confidence that if there is any need to draw down that support at an early stage, it is available.

Last winter also saw disruption to our transport, energy and water supply networks. Extensive work has taken place to make sure that we are better placed to deal with any similar events in future, with action being led by both the Government and service providers. I have already mentioned the work undertaken by the Environment Agency to improve engagement with local communities, but we have also been encouraging local authorities to plan for flood risk. Bringing all their activity together in a local flood risk management strategy is an important way for local authorities to communicate with and reassure local people that they are well prepared to respond to flooding, and we will continue to encourage action at the local level. We have resourced local authorities to bring together their local strategies, and I have taken the opportunity on a number of occasions to remind in writing those local authorities that perhaps have not quite gone through that process yet that it is important that they do so as soon as is possible.

Recovery from the flooding of last year has gone well and is continuing. The Government have committed more than £560 million in flood recovery support funding. We are currently reviewing the position with regards to recovery funding, identifying lessons learned from 2013-14 and considering how Government can be better prepared to provide support during a long-term recovery programme. My officials are working across Whitehall to consider new arrangements that will ensure that future recovery schemes will be part of a clear, co-ordinated, flexible package of support, which will be easily and readily accessible by people, businesses and places.

As lead Department for recovery, the Department for Communities and Local Government is also undertaking a review of the Bellwin scheme, which allows local authorities to reclaim emergency response costs incurred to protect lives and properties. A number of changes to the scheme have been considered in light of last winter’s experiences, and DCLG consulted on those late last year. That consultation closed on 1 January and DCLG will be announcing the next steps in due course.

As far as the Department for Environment, Food and Rural Affairs recovery schemes are concerned, so far around 4,200 applications have been received by local authorities for the repair and renew grant. Local authorities have approved RRG applications to the value of £8.7 million; that was one of the points that the hon. Member for Brent North was keen to have an update on.

We are aware that a number of local authorities have expressed concerns about meeting the 31 March 2015 deadline for RRG claims, and we are doing everything we can to resolve the situation and to provide some flexibility for them. As we speak, discussions are still ongoing about extending this deadline, and we expect to notify local authorities imminently. We are keen that as many eligible people as possible benefit from that grant. All applications for the farming recovery fund were processed last year, with a total value of £5.14 million.

I hope I have reassured hon. Members about the implementation of Flood Re and the question of flood insurance. I understand the aspiration across the House to explore how to make best use of revenue and capital funding to deliver better outcomes for communities, people and their property, and those discussions will continue. As the Chairman of the Select Committee pointed out, some of those questions will have to remain for the next spending review period, but as she rightly said, the Committee has put down a marker and I am certainly keen to explore ways in which we can respond. Important principles exist to ensure that we have capital invested in infrastructure and that we maintain those necessary fiscal controls on revenue spending; nevertheless, I understand the point the Committee made.

Reference was made to the importance of agricultural schemes. My hon. Friend the Member for Cleethorpes talked about support for partners coming together. That is a process to be led at local level—as he said, those partnerships are emerging—but I am happy to explore with him the support we might be able to offer and what the best approach might be.

Despite the exceptional weather experienced last winter, the impacts were significantly less than previous events of similar magnitude. For example, our existing flood defences protected some 1.4 million properties and more than 2,500 sq km of farmland from flooding. That reinforces the importance of continuing our investment in flood defence schemes and forecasting capability.

The hon. Member for Brent North talked about the Pitt review. Some of its recommendations are for Government, but others are for agencies and bodies such as local authorities. Some are ongoing—they are not the sort of thing we can just deliver on and then tick off; they have to be constantly examined and updated. However, the Government have moved forward on those recommendations. Had we been debating this subject at this point last year, the hon. Gentleman could rightly have raised the question of sustainable drainage systems, but we have now moved forward on SUDS, as he is aware, and we are working with our colleagues at DCLG on a regime to implement that scheme. That was therefore an important recommendation.

Some of the hon. Gentleman’s colleagues have raised in previous debates the question of the statutory responsibility for fire and rescue services, an issue of particular concern to them. The advice of the chief adviser at DCLG, which we have taken, is that the suggested approach is not appropriate. However, the Pitt review recommended that we consider that suggestion in detail, and we did.

Barry Gardiner Portrait Barry Gardiner
- Hansard - -

It is good that there has been progress on some of the other 46 recommendations of the review that had not been addressed before. Will the Minister agree to report back on that progress? One problem with knowing what has been going on is that in 2012, the Government announced that they would not provide further updates on progress with the Pitt review. It would help if that progress report was updated.

Before he closes, will the Minister simply answer my question about the increase in the number of properties at significant and high risk? Does he think that the reduction of 5%, which the Government have talked about, in respect of the lowest-risk properties is a proper use of capital expenditure?

Dan Rogerson Portrait Dan Rogerson
- Hansard - - - Excerpts

As I have sought to set out, our pipeline of projects, which is informed by calculations of the sort the hon. Gentleman mentions, will go a long way to helping communities, people and businesses around the country, and to meeting the demands and appropriate needs of local authorities, Members and individuals in their areas. I am happy, as always, to look at and review both the projects and the underlying assumptions.

We have also said that the pipeline gives an indication of which projects have met the test for funding so far. Some projects may change during the six-year period as other information emerges or local circumstances change, and as other sources of partnership funding come forward that people might want to integrate into such a scheme. Other projects that have not yet provided the level of detail needed to be in a scheme may move into that six-year programme. In setting out that programme, we have done more than any previous Government to give people confidence that we are serious about investing to keep them safe for the future.

Alongside that, we have one of the best forecasting and warning systems in the world and we are investing more in such computing power. Although we cannot control the weather and cannot stop flooding altogether, we are determined to reduce the risk further and to provide better protection for people’s homes and for farms and businesses across the country. We have acted on the lessons learned from last winter and have put in place numerous measures to improve response capability at all levels. With local partners at the helm of flood preparedness, coupled with the Government’s record level of investment in flood defences, we will be better equipped to deal with the risk of flooding this winter and beyond.