Planning and Infrastructure Bill Debate
Full Debate: Read Full DebateBaroness Neville-Rolfe
Main Page: Baroness Neville-Rolfe (Conservative - Life peer)Department Debates - View all Baroness Neville-Rolfe's debates with the Ministry of Housing, Communities and Local Government
(1 day, 21 hours ago)
Lords ChamberMy Lords, I remind the Committee of my recorded register of interests: I am a non-executive director and a board member of the Water Retail Company. I will speak to my Amendment 79 and respond to the amendments on connections reform.
Amendment 79 calls on the Government to insert a new clause into the Planning and Infrastructure Bill under the heading of “increasing grid capacity” and proposes that, within three months of the Bill becoming law, the Secretary of State should publish a plan to achieve two simple yet crucial objectives: to reduce the cost and the time taken for new connections to the electrical transmission or distribution system; and to permit the development of local energy grids. The need for this amendment should be beyond reasonable doubt. I am concerned that, if these reforms are not made, we will not be capable of meeting the Government’s stated objective, which we share, to achieve clean power by 2030—a key step on our overall climate change and energy targets.
To decarbonise, we must electrify. Electricity demand is set to rise by at least 11% before 2030 and at least double by 2050. How we heat our homes, how we travel and how we power our industry must all be by electricity, which demands wiring everything up and ensuring that both low-voltage and high-voltage networks are fit for purpose. I would argue that this is one of the biggest societal energy changes since the Industrial Revolution and is only some five years away, which is merely the blink of an eye in planning terms. At present, the delay in getting grid connections is one of the greatest obstacles to decarbonisation, to developing new housing and industry, and to increasing our economic output as a country. Our businesses and communities are waiting seven to 10 years—even longer in some cases—before they can secure the right to feed clean energy into the system or to make power connections. Developers in grid hotspots—or “not spots”, potentially—are reporting connection waits of several years as being typical.
We need to be prepared and to get this stuff done. My amendment is designed to help do that. If we are going to be a leader in renewable energy and to get all the renewable energy in place, the grid connection system needs to be reformed. I very much recognise the Government’s recent reforms to try to update the grid connection system. In April 2025, working alongside Ofgem and the National Energy System Operator—NESO—the Government announced reforms to prioritise clean energy and infrastructure for grid access, aiming to eliminate so-called zombie or speculative projects and to fast-track the shovel-ready schemes that are set to go. The new target model option, TMO4+, introduces stricter queue management, milestone targets and progressive penalties for lagging projects, as well as prioritising the projects that are crucial for clean power and our overall economic growth.
These reforms are intended to help deliver that 2030 clean power plan, unlocking up to £15 billion in investment and supporting a more responsive and modern grid system. These are all steps in the right direction, and we definitely welcome how the Government have made progress since they came to power, but I feel that more needs to be done, hence the amendment that I put forward here. I worry that, if we do not do more, we will simply not be ready and will not hit these targets.
The second element of my amendment touches on local energy grids. Local energy grids are still in their infancy, but my party very much supports them. They empower our local communities and help them to benefit from the clean power revolution that is coming. Their efforts are quiet, modest and determined, and I want this Government to do more to support them. I believe they are essential in galvanising public support and helping the Government to take communities with them on this journey. Alongside many others across both Houses of Parliament, I fought to get community energy into the Great British Energy Act and I am delighted to have done that.
However, more help is needed to get this stuff over the line. Local energy grids are important and will benefit the country. They help to make the grid more secure and resilient. They reduce the need for transmission and the loss of transmission time, and they reduce the need to invest in the high-voltage grid overall. They take our communities with us and bring support. We all need that: this Government need that and we need that. Our communities should benefit from the revolution that is taking place. My amendment is designed to help and to support the Government. My hope is that the Government can support this amendment, or it would be appreciated if they brought forward an amendment on Report.
I turn briefly to the other amendments in this group. I recognise that the Minister has put forward a drafting amendment and we are fine with that. On Amendments 73 to 76 in the name of the noble Lord, Lord Lansley, we recognise what they are about and welcome the questions that the noble Lord raises. These are important issues, which we should discuss in Committee, about the replication of policy and policy statements, and how those systems are set up and will work in practice.
However, as we go into this rapid period of change, my worry is that, if his amendments are passed, we could end up with a system that is centralised more in Westminster, is less responsive to the changes that need to happen at pace and at scale and is not as well connected to the communities and those on the ground facing change. Those would be my general concerns with those amendments, if agreed, but I look forward to the Minister’s response and I think it is important that those amendments were raised. I look forward to further debate on this group.
My Lords, connections reform is very important if we are to give the grid capacity. The noble Earl, Lord Russell, is right in wanting to speed things up and to ensure that these connections are not too costly. That matters whether you want more renewable energy in the mix or would prefer—as I would—to continue with a mixed supply, including better and continued use of North Sea oil and gas.
However, the fact is that the grid is not resilient and everything is too slow. We have too many layers of decision-making, too much strategising, too many bureaucratic rules and, therefore, not enough speed and determination. I know that that is behind the Government’s planning reforms. I fear that my noble friend Lord Lansley’s amendments could also slow things down, but he may be able to reassure me on that. I look forward to the Minister’s response on how we can ensure that these changes will speed things up and get us the reforms that we need, if the economy and the energy economy are to work well in the months and years ahead.
My Lords, I agree with my noble friend Lord Lansley’s approach of being specific about what it is that developers and investors should be looking at instead of what the latest designated strategy might be. This approach also makes sure that we do not end up with more reasons for judicial review, when it is left to judges to determine what is the strategy or where there is nuance and so on. My noble friend made points about making that direct link to understanding a moment in time and that the measure has been through the parliamentary aspect of the process, initiated by the Government of course. That simplicity will in fact help the Government in achieving a lot of the aims which they seek.
My Lords, with the solar energy that is reaching me at the moment, it is actually quite hard to see whether there is anybody out there, but I will take it for granted that there is and that they are all listening with rapt attention.
I apologise that I was unable to participate in earlier debates on the Bill, but I have been following it closely. I should declare that my family farm has some of what the noble Baroness, Lady Coffey, referred to as “hideous”—or was it “horrendous”?—pylons and poles coming across it. My grandfather actually welcomed these as signs of the inevitable march of progress, but, even then, and certainly now, not everybody is quite as enthusiastic as he was.
While I see and support the logic of Amendment 77, it makes no provision overtly for wayleaves or compensation for those whose homes and businesses are affected by any additional poles et cetera. I hope that any amendment along these lines would accommodate such arrangements, as is the case with current power lines. Will the Minister, or perhaps the noble Earl himself, confirm that that is the intention?
My Lords, to pick up the point of the noble Lord, I remember my uncle getting pylons next to his house and how the compensation saved the day for his small business.
My own view is that it is good to have permitted development rights for minor changes, particularly if energy providers are calling for them. It makes sense to use this Bill to allow permitted development. My noble friend Lord Lucas said that it was hugely important, and I think it is hugely important to speed things up. As we have already heard, it is a surprise that some of these things require planning permission, and there is a lot of potluck as to whether you can get planning permission quickly in any particular area.
I just believe that we need to get things moving so I am not sure why the changes need to be in a regulation, as proposed in Amendment 77 from the noble Earl, Lord Russell. Can the Government not work out what can be easily excluded from planning control and put it in the Bill? That is how we used to do things in the Bills I remember presiding over in the 20th century when I was a civil servant. Is there anything that we can do to get rid of these things, rather than wait for further regulations and consultations, if it is straightforward?
I agree with my noble friend Lady Coffey that we should be careful not to allow multiple wind turbines through a back door. Clearly, the detail of this needs to be looked at; it has to be genuinely smallish things. I am less sure about permitted development rights for floating solar simply because I know so little about it; if we were to proceed with that, it should be in regulations. I am always asking the Minister how we can speed this process up. Permitted development rights here, and perhaps elsewhere in the Bill, can play a part.
My Lords, Amendment 77 in the name of the noble Earl, Lord Russell, seeks to require the Secretary of State to designate certain electricity network upgrade works as permitted developments within 12 months of the passing of this Act. I refer the Committee to my register of interests, including as a developer of solar and wind energy generation infrastructure.
The amendment is detailed and specific, covering a range of necessary and often routine upgrades to our distribution network. These upgrades are not exceptional; rather, they are part and parcel of the essential modernisation of our grid. As demand for electricity grows, driven by electric vehicles, heat pumps, an increasing shift to electrified systems and the construction of new data centres, so, too, does the need for a distribution network that can meet that demand safely and efficiently.
The concerns raised by the noble Earl in bringing forward this amendment have merit. Local electricity distribution is hampered by regulatory delays, planning burdens and procedural hurdles, which can slow down or increase the cost of what are in many cases necessary infrastructure improvements. We understand the motivation to streamline these processes and provide industry with greater certainty. However, there are important questions around local engagement, visual impact and environmental considerations, which would need to be worked through. Permitted development rights by their very nature bypass certain planning safeguards, and we must take care not to undermine public confidence in the system by extending them too broadly or too quickly. I ask the Minister whether there are other ways of simplifying the decision-making on such upgrades.
Amendment 94E in the name of my noble friend Lady Coffey would require the Secretary of State to make regulations to extend permitted development rights to include the installation of floating solar panels on reservoirs. At a time when we are seeking every opportunity to expand renewable energy without placing additional pressure on land, utilising existing bodies of water in this way may present a pragmatic and low-impact solution. My noble friend makes an important and timely point about the potential of underused spaces to contribute to our energy goals. I hope that the Government will look closely at how permitted development rights can help facilitate the responsible deployment of floating solar technology.
In a similar vein, Amendment 185B in the name of my noble friend Lord Lucas seeks to expand permitted development rights for small-scale onshore wind turbines up to a height of 30 metres. This, too, is a proposal worthy of consideration. Enabling more local generation of renewable energy, particularly where there is community support, can play a valuable role in decarbonising the grid and improving energy security.
I look to the Minister to provide clarity on the Government’s current thinking in this area and to address the important questions raised by the noble Earl, Lord Russell, and my noble friends Lady Coffey and Lord Lucas. Specifically, I hope that he can reassure the Committee that the Government recognise the need for timely electricity network upgrades and are actively considering how the planning framework can support that aim while balancing the interests of local communities and the environment.
My Lords, the rules that determine whether a turbine can be classed as permitted development and not require a full planning application have not been updated for over a decade. With advances in technology and increased demand for small-scale generation, there may be opportunities to update these rules. Therefore, I hope the noble Lord will be pleased to hear that the Government committed in the onshore wind strategy to publish a consultation this year on whether existing permitted development rights are fit for purpose and could support other forms of small-scale onshore wind deployment. I believe it is only right that we conduct a full consultation to gather views, insights and evidence on potential proposals, and ensure that we have considered the breadth of the benefits and impacts.
I hope the noble Lord is content with this response. Before I ask him to withdraw his amendment, I will respond to the very important point alluded to by the noble Lord, Lord Teverson. The Government recognise the urgency of reform and have already taken action. We have published the 8 July consultation; we will gather views on proposals and we are committed to bold and effective reform, but it is essential that we understand the full impact of these changes on all those involved. We will move at pace to bring forward any necessary legislation once the consultation analysis is complete. I kindly ask the noble Lord to withdraw his amendment.
Coming back to Amendment 77, I mention one word: growth. We are trying, with cross-party effort, to reform the planning system and speed it up. I hear some good ideas from the noble Earl, Lord Russell, my noble friend Lord Lucas and others, yet we are having another consultation and another quango—doing something “in due course”, at some time, somewhere else. This is the flagship planning Bill, and I want the Minister to consider whether there is more we can do in it to set a better tone on speed and growth, and to get local authorities to move forward on the things which, as many agree, are bureaucratic and unnecessary.
Following on from the noble Baroness, Lady Neville-Rolfe, can the Minister give us some idea of a timetable for this, given that there is total unanimity that we are not in a sensible position and we need growth and to move this whole proposition forward? The consultation is about to end. Will we get this fixed by the end of the year, for instance? Could we be revolutionary and have something ready for Report? I am interested to hear from the Minister.