All 3 Debates between Andrea Leadsom and Andrew Gwynne

Oral Answers to Questions

Debate between Andrea Leadsom and Andrew Gwynne
Thursday 11th February 2016

(8 years, 10 months ago)

Commons Chamber
Read Full debate Read Hansard Text
Andrea Leadsom Portrait Andrea Leadsom
- Hansard - -

As the hon. Lady will know, we have frequent conversations with Ministers in the devolved Parliaments and we try to ensure that they are included in all the discussions, as they certainly have been with those on onshore wind. As she will know, planning at all levels is being devolved to local planning authorities, and it will then be for the Scottish Parliament to decide exactly what the appropriate planning process should be for onshore wind in Scotland.

Andrew Gwynne Portrait Andrew Gwynne (Denton and Reddish) (Lab)
- Hansard - - - Excerpts

Can we have some consistency from the Minister? Why does she support the imposition of fracking on communities against their will? Why can she not extend the same courtesy to those communities that she has extended to those affected by wind farms?

High-speed Rail

Debate between Andrea Leadsom and Andrew Gwynne
Wednesday 13th July 2011

(13 years, 5 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Andrew Gwynne Portrait Andrew Gwynne (Denton and Reddish) (Lab)
- Hansard - - - Excerpts

It is a pleasure to serve under your chairmanship, Mr Gray. I congratulate my hon. Friend the Member for Clwyd South (Susan Elan Jones) on securing the debate and on putting her case. She added a distinctively Welsh dimension to the debate on high-speed rail. As someone who studied at college in north-east Wales, and who travelled weekly from the Shotton and Wrexham stations to Manchester for a good three years, I fully understand the issues she raised about connectivity, particularly with north-west England.

Across the world, our major competitors are investing in high-speed rail, and it is important that Britain is not left behind in the race for faster connectivity. As my hon. Friend said, the prospect of bringing our major cities closer together brings with it the potential to boost investment and economic growth in the regions of England—and particularly in the north of England—Scotland and Wales.

During its period in government, the Labour party began the process of moving Britain into the high-speed age. Through electrification, more advanced trains and investment in new technology, we cut journey times on our major inter-city routes. Where there was a need for a new line, we delivered it, constructing the first major new railway for more than 100 years, between London and the channel tunnel.

Before we left office, we began to plan the next stages of the process of moving our rail network into its high-speed future. We prepared for the next phase of electrification and the procurement of the new generation of more advanced inter-city trains. We began to work with Network Rail to identify the next priorities for investment to increase capacity and reduce journey times, such as the northern hub proposal.

We therefore welcome the Government’s decision to take forward much of the electrification that we planned, although we are disappointed at the decision not to stick to our commitment to electrify the final part of the great western main line between Cardiff and Swansea. A commitment should also have been made to ensuring that the midland main line is the next important priority for electrification. We also welcome the decision to proceed with the inter-city express programme following the further review carried out by the Secretary of State, although we still have to hear an adequate explanation of why the number of new trains has been scaled back so considerably.

Of course, Labour Members also welcome the Government’s decision to continue to plan for the new high-speed line that is proposed to address the capacity issues on the west coast main line, which will get worse in later years, as we have heard from the hon. Members for Northampton South (Mr Binley), for Lancaster and Fleetwood (Eric Ollerenshaw), for Pudsey (Stuart Andrew) and for Weaver Vale (Graham Evans). Within the next 20 years, the average long-distance west coast main line train is projected to be 80% full and routinely to have very severe overcrowding for much of the time. The new line will also bring reductions in journey times.

We welcome the Government’s decision to drop their pre-election insistence that passengers should have to go via Manchester to get to Leeds, which the hon. Member for Pudsey mentioned. We also welcome the alterations that have been made to the route to do more to mitigate the scheme’s impact on local communities and the environment, although there is still concern about the impact of the new line, and that needs to be addressed.

Thanks to the decision to take only the powers needed for the route from London to Birmingham, there is considerable scepticism about the Government’s commitment to take a new line further north. Labour’s plan was always to have one hybrid Bill for the entire new Y-shaped line. Of course, that would have meant that the Bill was delayed—perhaps by a year—but it would have saved considerable parliamentary time across the project. I therefore urge the Minister, as I did in a previous contribution, to think again about that.

The Minister cannot be surprised at the scepticism that exists, when even her own MPs are giving the game away about the true reason for the Government’s conversion to high speed. Only yesterday, writing on ConservativeHome, the hon. Member for Cities of London and Westminster (Mr Field), who was here for the debate earlier, said:

“Indeed, the genesis of the project was a response to relentless business criticism of the Party’s decision to oppose a third runway at Heathrow. HS2 allowed the Conservatives in Opposition to cloak itself in a visionary, environmentally friendly, long-term transport policy.”

That suggests that, for the Government, the policy is not necessarily about narrowing the north-south divide, but a fig leaf for their lack of an aviation policy and, I might even add, a growth policy.

In contrast, the Labour party’s support for increasing speed and capacity is something we delivered on in government and is rooted in our genuine commitment to the rail network. It is vital that we think it terms of a single high-speed rail network across Britain, and that we achieve reduced journey times and increased capacity through a programme of electrification, new advanced trains and new lines, where that is the best way to address capacity issues.

In the policy review we are carrying out, we are looking at what the future strategy should be for rail in Britain as a whole. It makes no sense to look at proposed new lines in isolation or to preclude them from our review. A number of issues are being raised with us as part of our review, and the same is no doubt true of the Government’s consultation. I would therefore welcome the Minister’s response to a number of those issues.

First, there is considerable concern that any new lines should be fully integrated into the existing rail network. We must ensure that we can maximise the benefits of the proposed new lines, with rail all over the country and with major London projects such as Crossrail and Thameslink.

There is a view that the precise alignment of the route the Government have chosen is driven very much by the very high top speeds proposed for the new line. That speed is considerably above that on high-speed lines in use across the world, and some countries—notably China—are even slowing down their high-speed trains to address cost, energy use, safety and environmental concerns. Some believe that the need for the route to go through a sensitive part of the Chilterns is entirely down to the speed calculations that have been made. It would be helpful if we had some clarity on that.

Andrea Leadsom Portrait Andrea Leadsom
- Hansard - -

Do the Opposition intend to respond to the consultation by 29 July?

Andrew Gwynne Portrait Andrew Gwynne
- Hansard - - - Excerpts

The Opposition will take full part in all these debates, I assure the hon. Lady of that.

There is widespread incredulity at the fact that the cost of actually using the new lines does not feature at all in the current consultation, when, surely, that is a critical factor. If the whole point is that passengers will make the switch from the existing lines to reduce overcrowding on them, how can any assessment have been made of the likelihood of that happening without any knowledge of the likely difference in ticket price between the two lines? We know that it costs more to travel on High Speed 1 than on other services along that route, and there is no reason to believe that the proposed new line will be any different. Speaking of HS1, the Secretary of State for Transport announced in an interview in the Financial Times a few days ago that, just as with HS1, he proposes to sell the new line even before it has been built—something I would have hoped he might announce to Parliament.

A further issue that comes up frequently in our policy review is the decision not to join up the new line to Heathrow from the start, as my hon. Friend the Member for Hayes and Harlington (John McDonnell) suggested. That is of course our only major hub airport. In opposition the Minister said that

“failing to take HSR through Heathrow would be a big mistake”.

Instead, what is proposed is an expensive further spur to be built at a later date.

Not surprisingly, the cost of the scheme continues to cause concern. It has previously been acknowledged that the construction costs for major projects in the UK are significantly higher than for comparable projects elsewhere in Europe. It is vital that the Government work with Infrastructure UK to find ways to ensure that the cost to the taxpayer of the scheme is kept under control.

Finally, I repeat the concern already raised that the proposed hybrid Bill includes only part of the new line. Surely one hybrid Bill on high speed is enough.

Rail is thriving in Britain. More people are travelling than at any time since the 1920s. There are 1.3 billion journeys by train every year, and predictions of a doubling of that figure in 30 years. Increased capacity and continuing reductions in journey times are essential to the continuation of such success. That is why we made great strides towards high-speed rail in government, and why the debate about how any new lines that are needed are delivered is so important.

High Speed 2

Debate between Andrea Leadsom and Andrew Gwynne
Tuesday 23rd November 2010

(14 years ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Andrew Gwynne Portrait Andrew Gwynne
- Hansard - - - Excerpts

I am grateful to the hon. Gentleman for clarifying that point.

If, in time, an extension of the network to Scotland was to proceed, there would be a benefit of nearly £20 billion to its economy. HS 2 believes that the benefits of high-speed rail far outweigh the estimated costs, with the project yielding more than £2 of benefit for every £1 of cost.

There are clearly several arguments in favour of high-speed rail. It is a possible solution to the expected increase in passenger numbers, it will undoubtedly slash journey times and it could allow a much better integration of existing rail services regionally, nationally and internationally. However, we have to take on board the fact that not everyone is in favour of high-speed rail. I accept that, as the hon. Members for Wycombe and for North Warwickshire (Dan Byles) said, some communities will be impacted through the construction and operation of high-speed rail. The Labour Government were mindful of the fact that, in making proposals for a route, there has to be an attempt to minimise local impacts while achieving the wider objectives.

Andrea Leadsom Portrait Andrea Leadsom (South Northamptonshire) (Con)
- Hansard - -

Does the hon. Gentleman agree that there would be merit in considering ways to give benefits to those communities impacted by the track—for example, by having spurs off the new tracks that offered interim stops on occasion?

Andrew Gwynne Portrait Andrew Gwynne
- Hansard - - - Excerpts

That might be one solution to such concerns.

We need to ensure that people are fully consulted on changes that could affect their areas, and not only on the Chilterns or Buckinghamshire but, as my right hon. Friend the Member for Holborn and St Pancras (Frank Dobson) said, on Euston and Primrose Hill. Indeed, my right hon. Friend made some powerful points.

The coalition Government must have meaningful, extensive and detailed consultation, particularly with the local communities affected, and they must be keen to listen and to balance the concerns of those communities, many of which we have heard about today in this debate. No route in a project of this significance will be without controversy, which is why there absolutely must be adequate consultation of the affected communities, together with consultation on the exceptional hardship scheme for those whose properties may be affected by proximity to the preferred route.

May I ask the Minister how detailed the consultation process about the plan for the new route will be? Will it give us a detailed account of the streets, properties and landholdings that will be directly affected by the planning process? Significant time will be needed to ensure that consultation is properly conducted and considered. I welcome the proposed exceptional hardship scheme for those whose properties may be directly affected. What time scales do the Government have to introduce provisions for owners of properties nearby the planned route that may not necessarily be directly affected by the construction? Finally, can the Minister tell me how many applications have been received so far for the exceptional hardship scheme?

The Labour Government proposed the high-speed rail that would link London to Birmingham and eventually to Manchester, Leeds and beyond, which is the widely backed “Y”-shaped network. I welcome the fact that the coalition Government, after a few wobbles, have come out and supported that network instead of their unworkable “S”- shape. That was perhaps not so much a U-turn as a “Y-turn”, although my right hon. Friend the Member for Holborn and St Pancras has now thrown an “H”-shape into the mix.

I turn now to some specific issues. What consideration will be given to ensuring that the high-speed rail network is available to rail freight, which is an increasingly important part of the railway jigsaw? Does the Minister plan to have further talks with the Scottish Executive about possible network extension to Scotland in due course? Will she outline the time scale that the Government envisage for commencing construction of the first part of the network? Has her Department begun work on preparing the hybrid Bill that would have to be presented to Parliament to make the new network a reality in this Parliament?

The high-speed rail project could be of national strategic significance to this country, and I hope that we will be able to work across the House to secure a rail link that is worthy of a great country in the 21st century.