Road Restructuring: Oxfordshire Debate
Full Debate: Read Full DebateAlex Chalk
Main Page: Alex Chalk (Conservative - Cheltenham)Department Debates - View all Alex Chalk's debates with the Department for Transport
(6 years, 4 months ago)
Commons ChamberI am grateful to the hon. Gentleman for making that excellent point and for joining me on that trip to RAF Brize Norton, which I like to speak about in the House as often as I can. This matter is important for tourism, absolutely, because it forms part of the offer and image that we project of our local area, but it is equally important for businesses, which are moving goods around and will wear the costs of vehicle repairs, and for private individuals.
The scale of the issue and of people’s concerns should not be underestimated. The issue is not specific to Oxfordshire, but it is more keenly felt because of the many miles of rural roads, which make maintenance a real challenge. The road network in Oxfordshire is 2,994 miles long—15% is A roads, 10% is B roads and 75% are C or unclassified roads, which are the small rural lanes to which the hon. Member for Strangford (Jim Shannon) referred. A high proportion of C or U roads are often not built to the modern standards that we would expect were the roads to be built now. They are essentially old cart tracks through the rural county which have had tarmac added to them over the decades, and rural locations are hard for maintenance teams to reach to make repairs. That is a particular problem when temperatures drop so low during the winter months.
Does my hon. Friend agree that what frustrates people across the country, and certainly in Cheltenham, is that contractors are often getting away with poor-quality repairs? If they just did the job properly in the first place, the repair would have a chance of holding and would not leak at the first sign of frost.
My hon. Friend makes a superb point. I have mentioned the concerns raised when I knock on people’s doors, and people express that frustration that potholes come back a few months after being repaired. They just wish it was done properly so that did not happen. The problem is particularly acute around street works, metalwork and so on. The Government are consulting on moves to try to remove metalwork from the roads and to put it on verges and footpaths, where it is safe to do so, as a way of making sure that the phenomenon my hon. Friend rightly mentions is ameliorated. We have to find a way to ensure that repairs remain sound not for a few weeks or months but for years to come.
My hon. Friend makes an excellent point, and the Government have certainly been giving more money to local authorities, which are responsible for repairing the roads—I am sure the Minister will refer to that. I have provided some details of the scale of the problem, which perhaps has a great deal to do with it. We have a very rural area, and it is very adversely affected by weather.
One point that I have not yet covered, which relates to that raised by my hon. Friend the Member for Cheltenham (Alex Chalk), is the impact of development and of very heavy lorries. When a housing estate is built, heavy materials such as breeze blocks, girders, bricks and wood have to be brought in on small, narrow roads. There is a lot of development going on in Oxfordshire, which is a growing and economically busy area. That really adds to the scale of the challenge. The bigger the roads, the bigger the trucks and the greater the damage.
I briefly mentioned the challenge caused by the winter. The snow in December 2017 and further freezes in January and March 2018 have damaged an already fragile network, and it is worth noting that Oxfordshire has a lower proportion of roads assessed as good than the national average, but it also has a lower than average proportion of roads assessed as poor. Although Oxfordshire has a higher than average proportion of roads assessed as fair, fair means five to 15 years of life remaining. That is not a catastrophic state of affairs, but clearly it is an issue that requires a long-term solution.
I am grateful to my hon. Friend the Member for Henley (John Howell) for mentioning the work of Oxfordshire County Council. Of course we would like the council to do more, but I would also like us to recognise the work it has been doing, particularly in recent weeks and months, while drawing the House’s attention to the requirement for further works.
Oxfordshire County Council has 18 crews working on roads in the county, and I understand that is the largest number of crews it has ever used. In the summer it usually has only six crews, so the council is very much aware of the scale of the problem and is working hard to make changes
As my hon. Friend rightly said, Oxfordshire owns two dragon patching machines and shares a third with the highway authority. The machines, which are somewhat dramatically named, use hot tarmac to melt and mend potholes. Rather than just filling the potholes, which means the filler often comes out again, the dragon patchers melt and rework the surface, which is more efficient and lasts longer. Of course, it is much cheaper, too—costing about £22 per defect, compared with £80 per defect using the normal cut-and-fill method. That will help, but it only really helps in rural areas because the surrounding tarmac is melted in the process. That rural area is assisted by dragon patchers. Small crews are able to travel across the county to fix holes more quickly and cheaply and to handle traffic management at the same time. All these steps mean that the council has fixed more than 28,000 defects, of which about 23,000 were potholes, since January 2018. We are talking about potholes, drains and damaged signs.
Does my hon. Friend agree that what is so infuriating for residents is seeing one defect repaired but surrounding defects left or areas that we all know are going to crumble in the next frost left unattended? Do we not have to find a more efficient way of fixing holes and the defects around them?
I am grateful to my hon. Friend for that. I was wondering whether he was going to make that point in his earlier intervention, because this is linked to that. He rightly says that people find it frustrating is when one pothole is done but another a foot away is left because it does not meet the intervention level. We all understand that there has to be an intervention level at which county councils start to undertake work; otherwise, we will be trying to have a bowling green surface and, clearly, it is unreasonable to expect any county council to provide that.
There is a solution, which I will come to shortly. It is why I have entitled this debate “Road Restructuring: Oxfordshire”, as that is what we need to be looking at. Let me give the last of my statistics. In March alone, 5,146 potholes in Oxfordshire were fixed. A lot of work is being done; this is a major task, but a lot is happening as we speak.
I also thank the Minister and the Government for what they have done, as we must not forget that. They have acknowledged the extent of this issue—I have raised it before, and Oxfordshire received an extra £2.9 million in funding from the Department for Transport to repair roads damaged last winter. That included a £1.5 million pothole grant and £1.3 million from the flood resilience fund. I am delighted that, with extraordinary timing—I am grateful to those at the Table Office for having pulled this debate out of the hat when they did—the county council’s cabinet approved just yesterday an extra £10 million for road repairs across Oxfordshire. That will pay for a further 46 miles of surface improvements and 52,000 square metres of patching; this is on top of the £8.5 million already spent on carriageways and footway repairs.
Much as I thank the county council for that, and much as I thank the Government for the money they have given, more needs to be done, and residents of all our constituencies, and certainly those in West Oxfordshire, will be expecting me to push for more. The council has agreed in principle to invest a further £120 million over the next 10 years. That is funded by borrowing, so it will have to manage its finances correctly, although I know and trust that it will be able to do that. I would, however, like to register my concern that that is something the county council is having to look at doing, because, as my hon. Friend the Member for Cheltenham has rightly alluded to, what is happening not just in West Oxfordshire, but across the whole UK, is that the roads fundamentally need restructuring.
We are dealing with the fact that tarmac has been added to roads, which over the years have been patched and repaired. What really needs to happen is the removal of that whole surface layer, and kerbs need to be put in, along with sound, watertight, weight-proof surfaces. I accept that that is easier said than done. I understand that to bring the whole of Oxfordshire’s road network up to an acceptable standard would cost about £250 million, with a further £21 million required to keep that going through resurfacing and £5 million a year needed for regular maintenance work, such as gully cleaning.
We can use modern technology, such as the FixMyStreet app, whereby people can take a photograph of the defect and send it to the county council, which will come to carry out the repair, and people can see the log of the complaint. That is brilliant and I encourage all hon. Members to speak to their constituents to encourage them to use it. However, it does mean that councils’ workloads are dramatically increasing, because each time a defect is reported, someone has to go to look at it. Although this is very efficient, it means a lot more work is required.
I know that others want to get in on this debate, but I just wish to say something about solutions. I would like to reassure the Minister that I am not demanding that he give me a £250 million cheque for Oxfordshire this evening, although if he has got one, I will gladly receive it—I can see that he is checking his pockets as I speak. The road network in Oxfordshire is going to undergo a dramatic transformation in the near future. We have the Oxford to Milton Keynes and Cambridge expressway. We are looking at A40 improvements, which are necessary; the housing infrastructure fund bid has gone in; and the major road network fund is involved in respect of work on the A40 and A420 in the Wantage constituency. All of this, if successful, will bring much needed improvements to the road network and ease congestion. The Minister will know how often I raise the issue of the A40, and it would not be right if I did not mention it again today.