(3 years, 1 month ago)
Public Bill CommitteesThe hon. Member makes an important point, at least part of which we will discuss when we come to the procedures under which a potentially failed project might be rescued or transferred to other undertakings so that it can be delivered and completed, or if already operating, can continue to operate.
In what circumstances is it conceivable that a nuclear project would be deemed not to have a realistic prospect of completion but at the same time to be value for money?
It is quite possible that the Secretary of State could deem the first two criteria on the basis of work that the company had done to approach designation. However, unless the Secretary of State has in mind the whole picture at the point of designation—in the previous group of amendments, we touched on some of the things concerning the whole picture—it would be possible for him to conclude that, yes, on the basis of the work done so far, the particular mechanisms looked like they might produce, say, value-for-money electricity at a rate per kilowatt-hour that was compatible with market levels of electricity at that point or in the future or with value for money as far as other electricity production is concerned, but he might still not have a handle on whether the undertaking that the nuclear company was about to engage in was sound in the overall, as far as completion was concerned.
The hon. Member for Kilmarnock and Loudoun touched on an important lesson in that respect, which ought to be put before the Committee. He mentioned a case in California—it was not quite in California; it was a little way a way, although it began with the same letter. I am talking about the experience of a nuclear power plant in South Carolina in the United States. When I say the experience of a nuclear power plant in South Carolina, I do not mean that—because there is no nuclear plant in South Carolina; there are a bunch of a concrete foundings, walls and various other things that look like a nuclear power station, but it does not operate, it has never produced a single kilowatt of electricity and it remains abandoned.
More significantly, that project not only was abandoned but was commissioned precisely on the sort of criteria that are contained in the Bill. All those things were gone through by the South Carolina legislature, which put in place something remarkably similar to a RAB. Indeed, the bill payers of South Carolina were required to stump up money for the project as it progressed, and I am sure hon. Members will be interested to know just how much money went from the bill payers of South Carolina to that project and how much they got out of it as a result of introducing a RAB model in South Carolina. The answer is nothing. Some £9 billion of customers’ money went into the project, and they will continue to pay for that lump of concrete for the next 20 years in their bills because of the way in which the thing was constructed, all on the basis of agreements that looked pretty similar to what is in the Bill.
What South Carolina did not do was ask serious questions about the resilience of the various partners and companies involved in the project in the light of changing circumstances in terms of the construction of the project and the health of the companies involved. Among other things, costs went through the roof, the timescale increased substantially and one of the companies that was in charge of the project effectively went bust—it called for chapter 11 protection and was therefore unable to continue with the project. All those things could have been foreseen by the South Carolina legislature, but were not. The project went ahead, with the customers footing the bill, as various reviews subsequent to the collapse of the nuclear programme said, on the basis of something that was extremely unlikely to ever come to fruition as a nuclear power plant, not only because of the dodgy nature of the financing of the project but because it had completely unrealistic timescales—those involved expected to produce electricity within six years from the start of production and so on, none of which was properly overseen.
(3 years, 1 month ago)
Public Bill CommitteesI concede that I may not have fully understood all the various tests that are undertaken to usual industry standards, but nowhere in this clause does it say that those tests include the production of power. That is my central point. It is a bit like going into a car showroom and being shown a really nice vehicle. It has all the bells and whistles on it, and all the guarantees; it looks greats and the paint is really good. But when one asks to go for a test drive, the person in showrooms says, “I’m sorry, you can’t do that, Sir; it hasn’t got an engine in it.” Surely it must be about producing power. That ought to be explicitly in the Bill. That is my only point. If the Minister thinks that, concealed in all these various tests is the production of power, which does not seem to be the case to me, then maybe that is not needed on the face of the Bill. I think it would be rather good if it were on the face of the Bill.
Does the hon. Gentleman agree that we are in a very sorry place indeed if all the usual industry standards and practices for nuclear energy production do not actually include the production of energy?
We would be in a sorry place, but that is effectively what the clause appears to state. It is all about the fact that it could produce energy, not that it does produce energy. Those are two potentially different things. The hon. Gentleman is right about the industry standards that set it all up to make sure that energy can be produced. I merely think it might be a good idea if we found out if it did produce that energy.