(10 years, 1 month ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
I congratulate the hon. Gentleman on securing this debate. May I be clear about what he is saying about this project? When he originally mooted it, I thought it was directly tied to the tunnel being built for power lines under the bay. Is he now saying that this is an entirely separate venture? I ask that because, of course, National Grid says that if this tunnel scheme was to be part of the work to put power lines under the bay, that would be delayed by at least a decade, and probably more.
I can clarify that this project would have nothing to do with the power cabling. Originally, when the tunnelling experts and I talked, it was suggested that the transport tunnel would have been an escape route for the power lines tunnel, but now the transport tunnel would not be the same tunnel at all. The transport tunnel is a completely separate project from that proposed by National Grid, which already has investment for the power lines tunnel. However, if National Grid would like to come on board with this project, I am absolutely certain that bodies can talk together and reach agreement.
I understand that this transport tunnel is a big idea and will require considerable investment, but I have a can do attitude. I firmly believe that, having secured funding for the M6 link project after it had been planned for 60 years, there is no scheme too big to be delivered. I look for guidance from my hon. Friend the Minister about how best to go about the scheme, and how to make it a reality that would economically boost both my constituency of Morecambe and Lunesdale, and the Barrow peninsula, as phase two of my infrastructure plan.