Lord Rosser Portrait Lord Rosser (Lab)
- Hansard - -

My Lords, like the Minister, we would like to express our sincere condolences to the family and friends of the soldier from 32 Engineer Regiment who died yesterday while on duty with our Armed Forces.

I thank the Minister for repeating the Statement made earlier today in the other place by the Secretary of State. I wish to make a few points and ask one or two questions as well. The purpose of the prototype reactor at Dounreay is to identify at an early stage any age-related or use-related issues that may arise at a later stage in the lives of the operational reactor cores. To the extent that that is what appears to have happened means that the prototype reactor has served the purpose for which it has been running at a higher intensity and for much longer periods than those similar cores in our submarines. I note that the Statement says that the low levels of radioactivity detected are at the levels that would be expected, but that the issue is that they would not normally enter the cooling water which is within the sealed reactor circuit and there has been no detectable radiation leak from that sealed circuit.

The Statement also indicated that the independent Defence Nuclear Safety Regulator and the Scottish Environment Protection Agency were kept informed and that with the agreement of the relevant regulator following trials and investigations the reactor was restarted. I take it that means that both the regulator and the Scottish Environmental Protection Agency are satisfied that there are no safety issues at stake, but would be obliged if the Minister could confirm that that is the position. I note that the Statement says that we constantly monitor our submarine reactors and that we have never detected a similar occurrence to that now found in the prototype reactor.

The Statement indicates that the low level of radioactivity was detected in January 2012. It would appear that a decision was made not to advise Parliament of this at or near that time. Perhaps the Minister could say why the Government came to that conclusion, since it would have been perfectly easy to make such a Statement to Parliament then. Will the Minister say whether the Scottish Government were advised of the situation either directly or by the Scottish Environment Protection Agency? On the issue of timing, will the Minister also say why it has been decided to tell Parliament about the situation today rather than at any other particular time?

The Statement spelt out the implications for the availability of the Vanguard and Astute-class submarines, and thus the maintenance of our continuous at-sea deterrent, the decisions the Government have made to ensure the continuance of our deterrent and the additional costs that will be incurred. Will the Minister indicate whether there will be any implications beyond the submarines in question, and whether there will be any implications for the Astute construction programme?

The Statement indicates that the test reactor is scheduled to be decommissioned in 2015, but that the date may be brought forward. Will the Minister give an assurance that Parliament will be advised if that decision is made? If the test reactor is to be decommissioned shortly, then presumably the same facility will no longer be available to identify early any age or use-related issues that may arise in future operational reactor cores. How, then, will that safeguard be provided in future?

Finally, in the light of the Statement today about the prototype reactor giving advance warning of a possible issue with the operational reactors, do the Government intend to give further consideration to the effectiveness of whatever those intended safeguards may be for future operational reactor cores?