Air Traffic Management (Amendment etc.) (EU Exit) Regulations 2020 Debate
Full Debate: Read Full DebateLord Naseby
Main Page: Lord Naseby (Conservative - Life peer)Department Debates - View all Lord Naseby's debates with the Department for Transport
(4 years, 6 months ago)
Lords ChamberThe Minister may know that I am a former RAF pilot and a civil pilot. I have also been an adviser to an airline.
On the surface, this seems a pretty straightforward SI, which arises out of Brexit, and it is important that it is laid. Inevitably, though, it raises certain questions to which I do not necessarily expect the Minister to respond immediately this afternoon. If she is not able to respond to them now, I would be grateful if she could drop me a line after the debate.
I think it is easiest to go paragraph by paragraph through the Explanatory Memorandum. Paragraph 2.4 on page 1 says:
“This will ensure the continuity of a functioning regulatory framework for the UK’s Air Traffic Management”.
Are we saying here that the EU agrees with this in toto? That seems absolutely fundamental. I assume that it does, but I would like to have that in writing.
Turning to paragraph 2.5, will we still be involved in the SES ATM Research programme? We have clearly played a major role in the past. In paragraph 2.6, for the reference period 2020-24, how do the costs compare for users in comparison with the previous period?
Paragraph 2.16 refers to “efficient and safe ANS”. Have all the interested parties—the CAA, the users and so on—been consulted all the way and, most importantly, are they now comfortable with what has been agreed?
Further on, paragraph 6.4 talks about interoperation with the rest of Europe. Is the UK aviation industry 100% comfortable with that? Paragraph 7.2 refers to EU targets. Clearly, we are leaving the EU, so those targets are no longer necessarily what we want, but are our UK targets already established and are they comparable?
Paragraph 10.1 deals with consultation, which is a very important area. Are there currently any issues arising from this SI where there are ongoing discussions or concerns within the industry, or is it all now virtually signed and sealed once we pass this SI?
Turning to paragraph 11.2, is the UK already compliant or working towards compliance? What is the estimate for when the UK will be 100% compliant?
Paragraph 14 states that
“no review clause is required.”
I spent 12 years of my life on the Public Accounts Committee, and one great issue over the years was that all sorts of SIs went through which alleged that no review was necessary. Lo and behold, before very long, people wondered why there was no review date. I cannot think of anything more dramatic or large than leaving the EU—which I am in favour of. We ought to look at this and put down a date for review. I am open-minded on how far away it should be, but I would have thought it wrong to say that no review provision is required.
Lastly, the Minister may not know it, but I have always taken a passionate interest in drones. The development, flying and control of drones have all been a challenge. Are there any issues on the drones front that are affected by this SI, or that somehow escaped the notice of the Department for Transport?
As I said, I do not expect a detailed answer this afternoon, but I have been through this quite carefully and I would be most grateful if the Minister could ask the department to provide an answer to the points that I have raised.
My Lords, I gently remind all noble Lords that this is a time-limited debate. We would be grateful if noble Lords could stick to the four-minute speaking limit.