High Speed Rail (London – West Midlands) Bill

Debate between Lord McLoughlin and Frank Dobson
Monday 28th April 2014

(10 years, 7 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Lord McLoughlin Portrait Mr McLoughlin
- Hansard - -

I want to talk about the compensation package a little later and indeed about the fact that I announced a new compensation package before the House rose for Easter, but that matter is out for consultation.

Before I took those interventions, I was talking about the improvements in the great western main line. We will also see improvement in east-west links, with faster electric trains between Liverpool, Manchester, Leeds and Newcastle and a reopened railway between Oxford and Bedford. In London, we will see the Crossrail and Thameslink upgrades, which between them will cost £21 billion—about the same amount that is being spent on the first phase of High Speed 2. It is the scale of spending on London that has brought about amazing transformations at places such as St Pancras and King’s Cross stations. In the 20 years that I have been using those stations, they have become places that people wish to visit, destinations in their own right and places of which we can be proud. However, that necessary investment in London should not come at the expense of the rest of the country. Demand for travel is growing everywhere.

Twice as many people travel by train every day as they did 20 years ago. More people drive and fly, too, and that is because our horizons broaden in a better-connected world. Digital links do not replace travel; they fuel it. Smartphones and broadband are not an alternative to things such as HS2; they are part of the same growing links between people and businesses, and that pressure is felt acutely on our north-south rail corridors.

Frank Dobson Portrait Frank Dobson (Holborn and St Pancras) (Lab)
- Hansard - - - Excerpts

I very much welcome the Secretary of State’s praise for the two brilliant stations in my constituency, one of which was started and finished under the Labour Government and the other of which was started under the Labour Government. Will he confirm that according to the documents of HS2 and his Department, Euston will be able to provide extra capacity only if there is investment in Crossrail 2, at a cost of an extra £15 billion to £20 billion?

Lord McLoughlin Portrait Mr McLoughlin
- Hansard - -

The documents about Crossrail 2 have been put out by the Mayor of London. We shall see the completion of Crossrail 1 in 2018, which will make a massive difference to London overall. I know that the right hon. Gentleman feels very strongly about this matter and is proud of the stations in his constituency, but the truth is that when I first came to this House, we regarded Euston as the best station of the three. It is now way behind the other two stations. HS2 gives us a once in a lifetime opportunity to make a transformational change to Euston station, which will bring it into line with the other two stations.

--- Later in debate ---
Lord McLoughlin Portrait Mr McLoughlin
- Hansard - -

I am slightly concerned about the amount of time I am taking, but I will give way to the right hon. Member for Holborn and St Pancras (Frank Dobson).

Frank Dobson Portrait Frank Dobson
- Hansard - - - Excerpts

King’s Cross and St Pancras are both in my constituency. They had the support of the local council, the support of the local MP and the overwhelming support of local people, even those directly affected. That is not the case with the proposals for Euston.

Lord McLoughlin Portrait Mr McLoughlin
- Hansard - -

I am not sure what point the right hon. Gentleman is trying to make. If we only built infrastructure projects when we had the support of everyone concerned, we would be building very little infrastructure in this country.

High-speed Rail

Debate between Lord McLoughlin and Frank Dobson
Monday 24th March 2014

(10 years, 8 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Lord McLoughlin Portrait Mr McLoughlin
- Hansard - -

I hope very soon to be able to make announcements about the Government’s proposals for compensation. I would just say to my right hon. Friend that on the one hand I am attacked for listening to people, and then on the other hand I am attacked for not listening to people. I suppose that is just one of the problems of dealing with big infrastructure projects—wherever we take them, there will always be people who are directly affected, and they will not be convinced of the necessity of them. However, I am convinced of the necessity of high-speed rail for our cities in the north.

Frank Dobson Portrait Frank Dobson (Holborn and St Pancras) (Lab)
- Hansard - - - Excerpts

I welcome the Secretary of State’s decision to abandon the ridiculous proposal for the High Speed 2-High Speed 1 link across Camden Town, and I also welcome Opposition Front Benchers’ support on that matter. However, I cannot say the same about the proposal to go ahead with an even bigger redevelopment of Euston than was proposed before. It will mean that the homes of more than 500 people will be destroyed, and that the lives of about 5,000 people will be subjected for a decade to the noise, filth and disruption of the biggest engineering project in Europe. I hope that, even at this stage, at a time when looking back, looking forward and coming to different decisions is apparently still on the cards, the Government will at least consider having the initial London terminus at Old Oak Common.

Lord McLoughlin Portrait Mr McLoughlin
- Hansard - -

The right hon. Gentleman has been consistent on the HS1-HS2 link. I do not need to tell him about the difference that has been made to the area around King’s Cross and St Pancras in his constituency—it is plainly there for all to see. Those of us who use St Pancras station faced a lot of inconvenience at the time when that development was going on, but given what we see today, it was worth it.

High Speed Rail (Preparation) Bill

Debate between Lord McLoughlin and Frank Dobson
Thursday 31st October 2013

(11 years ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Lord McLoughlin Portrait Mr McLoughlin
- Hansard - -

My hon. Friend has taken part in the Third Reading of many Bills—they have always been hour-long debates. In fact, it is only recently that we have had debates on Third Reading. Back in the days when the right hon. Member for Blackburn was Leader of the House, we sometimes did not have debates on Third Reading because we simply did not have the time. The Government are trying to help everybody we can—[Interruption.] I do not want to get any more partisan now that I have the right hon. Gentleman on side.

The Bill is about helping communities and businesses, and helping the cities of the north and the midlands to compete on equal terms with London. Nobody begrudges the money we are spending on Crossrail or Thameslink. They are huge investments in our capital city, but it is time we looked at what is happening in the rest of the country.

Three important words—room for growth—sum up why the project is so important. They are at the core of the strategic case we published on Tuesday. The responses to the report show the crucial message of growth. The British Chambers of Commerce states:

“This report bolsters the economic case for HS2…HS2 is the only scheme that can transform capacity on Britain’s overstretched railways.”

The CBI has thrown its considerable weight behind the project. It did so because the new line is part of the answer to the infrastructure deficit that faces our country. The leaders of our great cities back HS2. Sir Richard Leese, leader of Manchester city council, has said:

“It’s straightforward and simple. We need more capacity and the only way is through this new network.”

Since 2008, the country has learned some tough lessons, but we must make ourselves more resilient and competitive as an economy. That will not happen if we do not take the long-term decisions on investment and stick to them. Our society is changing, our population is growing, people are travelling more, and demand for inter-city rail travel has doubled in the past 15 years and will continue to increase.

As I have said all along, I welcome suggestions for creating more capacity, but the so-called alternative suggestions from the critics simply do not add up. We have looked at the case for building new motorways and dramatically expanding domestic aviation. Neither does the job. Some people believe we can carry on squeezing more room out of our current railways, patching up our problems. The work we published this week shows that, if we tried to create the capacity we needed by upgrading the three current main north-south lines, we would face 14 years of weekend closures. That is not an alternative to the new line, it is disruption on a nightmare scale.

We are already investing record sums in the existing railway. Network Rail will spend £38.3 billion in its next five-year control period, and the Government have a £73 billion budget for wider transport investment over the next Parliament. Despite all that, we will still need new rail capacity. If one accepts that—and that we need room to grow—there is no choice about how to provide it. As the strategic case makes clear, a new high-speed north-south line is not just the right way, it is the only way.

The new north-south line will be the backbone of Britain. It will have 18 trains an hour, each carrying up to 1,100 passengers, transforming the available space on inter-city lines. As long-distance services transfer to the new line, capacity will be released on the existing network. Of course, not every city across Britain will benefit in the same way, but Network Rail estimates that more than 100 cities and towns could benefit from released capacity. It would mean significantly more commuter services, better connectivity and more routes for rail freight, taking lorries off our most congested roads.

We know that HS2 is the best answer to our transport problems, but as with any large infrastructure scheme, we also know we will face opposition. I respect the fact that some people are concerned about the impact on the places they live, and I respect those with serious proposals for improvements. Already, the environmental impact of the new line has been vastly reduced thanks to such improvements. But I also respect what Sir John Armitt said in his recent report on infrastructure—that big schemes need “broad political consensus” as well as “resolution” from political leaders.

HS2 must be a national project with support across the parties, or in the end it will be nothing. Labour leaders in our great cities across the north and the midlands know that HS2 is right. To those who say that there is no blank cheque, I say that there never has been and there never will be. I know that hon. Members want costs controlled. Here are the facts. The target price for the first phase is £17.16 billion. That is the price for construction agreed with HS2 Ltd. For the whole Y-route, the agreed budget is £42.6 billion, including a contingency of £14.4 billion, which we are determined to bear down on. Sir David Higgins—the man who built the Olympics on time and on budget—will make sure that happens. As the new chairman of HS2, he will bring his penetrating eye and expertise to the task to get the best value for our country.

As the strategic case published this week shows, our updated benefit-cost ratio has fallen slightly from 2.5 to 2.3. We have been open about that, but it means that the business case for the new north-south line is still strong, with more than £2 returned for every £1 invested—about the same as Crossrail and Thameslink, and nobody seems to doubt those projects. In fact, the ratio for HS2 could increase to 4.5 if rail demand continues to rise until 2049.

It is still important to recognise that the benefit-cost ratio cannot take account of unpredictable factors. That was true of the Jubilee line extension in London, for instance, which did not include the 100,000 jobs it now supports at Canary Wharf. It was true for High Speed 1, which did not include benefits from redevelopment at King’s Cross and St Pancras. When I first became a Member of Parliament, King’s Cross and St Pancras were places where people did not want to spend any time if they could possibly get away with it. They would try to turn up just before their train was due to leave. Those stations are now destinations in their own right. People go there and look with amazement at what has happened to the UK’s railway system.

Frank Dobson Portrait Frank Dobson
- Hansard - - - Excerpts

I represent not just St Pancras, but Euston and King’s Cross. Does the Secretary of State accept that virtually all the people in my constituency who are now opposed to HS2 were strongly in favour—indeed, the first advocates—of the transformation of St Pancras and the improvements at King’s Cross?

Lord McLoughlin Portrait Mr McLoughlin
- Hansard - -

Of course I do. I am more than happy to meet the right hon. Gentleman to discuss the particular issue of Euston station, because the redevelopment will bring specific problems. But we must also ensure that we get the very best deal for his constituents in the redevelopment of Euston station. I am meeting the leader of Camden council next week, although I do not know if the right hon. Gentleman will be there. I do not discount the concerns of local residents about the work on major infrastructure projects, and we have to take them into account.

High Speed Rail

Debate between Lord McLoughlin and Frank Dobson
Monday 28th January 2013

(11 years, 10 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Lord McLoughlin Portrait Mr McLoughlin
- Hansard - -

I know how my right hon. Friend feels on this subject, and I appreciate how Members whose constituencies have the line going through them have strong representations to make in the House. However, starting the route in the north, on which, up until today, work had not been done, would not be a better way of getting greater connectivity and connections. We should bear in mind that the routes I have said are overcrowded are even more overcrowded when they come into London, which is where we need the extra capacity in the first instance.

Frank Dobson Portrait Frank Dobson (Holborn and St Pancras) (Lab)
- Hansard - - - Excerpts

The Secretary of State has said that he will ensure that people are compensated fairly. In December 2010, his predecessor said exactly the same thing about the people in my constituency who are affected by the first phase. However, at a meeting on Thursday in my constituency, officials from HS2 Ltd and the Department for Transport made it crystal clear to many people living near Euston station, including some of those who had exercised their right to buy their council flats, that they would not be fully compensated, and that others, including people whose businesses will be totally destroyed, will not be compensated at all. Can we rely on the Secretary of State to ensure that, when he says one thing in the House of Commons, his officials do not set it aside in the country?

Lord McLoughlin Portrait Mr McLoughlin
- Hansard - -

I believe the Under-Secretary of State for Transport, my hon. Friend the Member for Lewes (Norman Baker), gave the right hon. Gentleman an assurance on that point last Friday. I am certainly prepared to meet the right hon. Gentleman to discuss these matters and to try and clear up what confusion there seems to be.

West Coast Main Line

Debate between Lord McLoughlin and Frank Dobson
Monday 15th October 2012

(12 years, 1 month ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Lord McLoughlin Portrait Mr McLoughlin
- Hansard - -

Given that my right hon. Friend was closely involved in setting up the original model, I should naturally defer to his great expertise in this matter. I do not want to prejudge the findings of any of the reviews that I have set up, but I am sure that Mr Brown will have heard my right hon. Friend’s comments and that he may well want to investigate that solution further.

Frank Dobson Portrait Frank Dobson (Holborn and St Pancras) (Lab)
- Hansard - - - Excerpts

May I express my sympathy for the new Secretary of State’s having to deal with this mess? However, in view of the fact that the Department could not come up with figures that would be valid 10 years hence, how can he believe that the same Department, the same officials and the same advisers can come up with accurate predictions on passenger levels, and on inflation generally, in relation to High Speed 2, which does not exist and for which there is no evidence to draw on? I think he needs to look at that matter again. I will not say that he needs to go back to the drawing board; in the case of HS2, it is more a matter of going back to the ouija board.

Lord McLoughlin Portrait Mr McLoughlin
- Hansard - -

I am interested to hear what the right hon. Gentleman says. A number of points have been raised since I made the announcement. The HS2 business case has undergone an extensive quality assurance process, and we are confident that it is accurate. The August 2012 update on the economic case was supported by a 400-person day of independent quality assurance, and HS2 Ltd has appointed independent auditors to undertake a line-by-line check of the analysis being prepared for the deposit of the hybrid Bill. This is all in addition to the existing quality assurance arrangements. I am glad to say that there was a commitment to these proposals in the right hon. Gentleman’s party manifesto to the country as well as in our own.