(1 year, 9 months ago)
Lords ChamberMy Lords, a number of noble Lords have mentioned concerns over industrial performance in delivering on this contract. I think I heard the Minister say that, because there are three parties involved, it would be embarrassing if we did not keep up to time. I suspect that that is just one of the things that would be a problem; it would also be extremely expensive. My noble friend asked a specific question about what benchmarking is being done between the industrial complex in this country and that available in both France and the United States. Can the Minister please answer that?
To be absolutely accurate, I did not use the word “embarrassing”. Nothing on which I represent the MoD on at this Dispatch Box is ever to be embarrassing; it is a privilege to represent the MoD in this Chamber and to do so on such a positive occasion as this one. I do not have details as to how the benchmark will apply, nor an answer on whether there is to be some measurement of appraisal against what other countries do. I undertake to investigate that, and if there is any information that I can share with the noble Lord, I will do so.
(2 years ago)
Lords ChamberI join the noble Lord in welcoming that and also ask that the Minister includes currency because, while inflation is important, currency is actually more important in some cases. It is absolutely clear that a lot of these purchases are made in dollars and the dollar/pound rate will determine quite substantially the rising costs of equipment.
I hear both noble Lords. To put a little context around this, the MoD has not been sitting in some splendid ivory tower in isolation as volatile economic circumstances swirled around us. Actually, we have built protective measures into many of our contracts to deal with inflationary pressures—or, indeed, to deal with the currency fluctuations mentioned by the noble Lord, Lord Fox. I appreciate that more detail is sought and I shall certainly look at that, with my officials, and endeavour to return to both noble Lords with some more information.
I was going to explain in more detail what we already do and how the National Audit Office already plays a role in all this. The National Audit Office is independent—we should remember that—and it already conducts a yearly audit on the defence equipment plan and undertakes regular audits of defence programmes. Further scrutiny of the performance of defence programmes is undertaken by the Infrastructure and Projects Authority, which tracks the progress of projects currently in the government major projects portfolio, not just that of the MoD. The details of these are published in its annual report. As an independent statutory body, the National Audit Office decides, independently of government, where to focus its resources and determines what projects and public bodies it audits and when.
It is important to emphasise that the Government do not direct the NAO; nor should we, because an essential feature of the importance and value of the NAO is that independence. Although it may not intend to do so, I argue that the amendment would interfere with that statutory independence. In addition, it would force the NAO to use its limited resources on a specific examination each year, irrespective of changing priorities: something might be significant one year and of far less concern the following year. It might even not reflect the continuing value of such an examination to Parliament: this is where we have to be very careful.
To reassure noble Lords, as I indicated, the Ministry of Defence continues to take steps to control the rise in the price of defence goods and services over time, including through improving the communication of longer-term priorities and requirements, including, as noble Lords will be aware, through the publication of pipelines. That is an extremely important development and signals likely demand to industry far better. It lets industry reflect on preparedness, instead of what was before probably a rather stop-start process, with industry asking, “Do you need anything?” and us suddenly announcing, “Yes, we do,” and everybody trying to create the thing from new.
The Ministry of Defence is utilising a new approach to industrial strategy. This strengthens supply chains and is driving pace and agility into the acquisition system through a range of transformation initiatives. The department has implemented steps to estimate project costs more accurately, including improving our risk forecasts through the use of reference class forecasts; that is, trying to use procurement as it happens, to inform us—what can be learned from the process? We have risk-costing pilots and we use the analysis of systematic, strategic or operational problems to inform us how the contract is proceeding. The MoD is also driving evaluation into programmes through the use of monitoring and evaluation frameworks and creating a process to capture and share lessons learned.
An important area, perhaps not widely understood, is that the MoD, like everyone else, can be hit by the quality and quantity of skills. That may be a significant impediment to us. Improvements are being delivered through the improved provision of training, initiatives to recruit and retain staff, and audits to identify and fill skills gaps.
The noble Lord, Lord Wallace of Saltaire, said that not much has changed. I think he started with the 1980s, then we seemed to regress further, into the Victorian age, when I am not sure we would recognise very much of what our procurement contracts are delivering. I respectfully disagree with him because, in addition to what I have previously mentioned, including the investment appraisal process, we have made other big changes. For example, all category A procurements, which are valued at £400 million or above, go through an extensive internal MoD process before they even get to the Cabinet Office, the Treasury or the Minister of Defence for approval.
Costs are now independently assured by the cost assurance and analysis team, tender and contract documentation is independently assured through the progressive assurance team, and direct award contracts are reviewed and monitored by the single-source adviser team. If that sounds like just verbiage, let me say that behind that are highly trained expert people who are there to identify the shoals, the reefs and the rocks, bring them to our attention, and make sure that we are not inadvertently drawn into areas of contract weakness where in the past we might very well have gone.
We are content that there are sufficient checks and balances in place to ensure that we achieve best value for money, learning from previous procurements. There are some good examples, and I was very struck by visiting Babcock at Rosyth, where it is building a Type 31 frigate. That really proceeded on a new basis of approach—it was born out of the national shipbuilding strategy. That programme was established in 2017, and following competition a contract was awarded to Babcock in November 2019 for the design and build of the five ships; it is currently under way, with the first ship scheduled for float-off in 2023. With barely three years passed since contract-award, the Type 31 build at Rosyth is well under way, with the first grand block now assembled in the Venturer assembly hall. The build programme is set to meet its deadlines of delivering all five ships off-contract by the end of 2028, and the build contract is on course to deliver the five ships at an average cost of £250 million per ship.
I use that as an example because it seems to me, having seen it at first hand, a very modern illustration of where we have moved to. When I say to the noble Lord, Lord Wallace of Saltaire, that I do not agree with his characterisation, I also try to illustrate that argument by pointing out that there are different practices at play, informed—I fully admit—by a number of sources like the national shipbuilding strategy, which was an innovative change of direction for how we procure ships within the UK. But we have also had a very good example with the Poseidon aircraft programme operating out of RAF Lossiemouth in the north of Scotland on the Moray coast. It is an absolutely fantastic facility. That fleet comprises nine aircraft, which were all achieved on time, within budget, and to a challenging timeline.
It is very easy to be sceptical, and I fully understand why your Lordships rightly have been sceptical of some pretty poor experiences in the past, but all that I am pointing out is that we have moved on to a better way of doing things, and I hope that your Lordships understand from what I have been explaining and describing that there is a far better structure within the MoD to deal with these complex procurement contracts. These defence contracts are often complex, they are required quite often at speed to meet emerging threats, and are often needed to provide much-needed support to our Armed Forces, to ensure that we maintain operational advantage and to reduce the risk to our nation.
The noble Lords, Lord Coaker, Lord Wallace of Saltaire, and Lord Alton, all raised the issue of Ajax, and I think I have said before from this Dispatch Box that it was certainly not one of our proudest moments. Intrinsically, it is actually a very good vehicle, and it will provide an important capability. Following agreement from the Ajax safety panel, work has led to resuming the user-validation trials which were paused earlier this year. Results from these trials are being analysed to ascertain whether it is possible to deliver a safe system of work under which to conduct reliability-growth trails. Your Lordships are aware that there were issues with vibration and hearing, and the one thing that we were very clear about was that we were not going to put people at risk; my former colleague as Minister for Defence Procurement, Jeremy Quin, was absolutely insistent. That is why, despite the embarrassment, we paused what was happening until we had a better understanding of what was going wrong; but I make it clear that the MoD will not accept a vehicle until it can be used safely for its intended purpose.
Your Lordships will be aware that Clive Sheldon KC is leading the Ajax lessons learned review, which is looking at ways in which the Ministry of Defence can best deliver major contracts more effectively in future. That is an important review and we await his analysis, conclusions and recommendations, but I emphasise that any delay to Ajax will not affect our commitments to NATO. That is an important point to observe.
The noble Lord, Lord Coaker, asked about the “Prince of Wales” carrier. Rosyth on the Forth is where good things happen: as well as building the Type 31, that is where the Prince of Wales carrier is currently reposing. She is a state-of-the-art aircraft carrier. She has already proved her capabilities in a number of exercises, but there was an issue concerning the propulsion shaft and investigations are now under way. She is a huge vessel, and it was necessary to take her into dock to have the facilities properly to examine what was going wrong. Timelines for the repair of the shaft are being investigated and further updates will be provided in due course. We want her to return to operations as soon as possible. My understanding is that we have brought forward some routine maintenance anyway, so that can be attended to while she is at Rosyth. I have no more specific information at this time, but I expect we will get a further report when more is known about the underlying condition and how long it will take to rectify.
The noble Lord, Lord Coaker, raised the Type 26, which is a first-class ship. I have visited the programme in the yard at Govan being operated by British Aerospace. It is a fantastic piece of maritime equipment and it will be pivotal for the Royal Navy. It is proceeding very well. We have just awarded the batch 22 contract to the yard because we were absolutely satisfied about the professionalism, commitment and effectiveness of what British Aerospace was doing with the first batch. It is true that there has been a delay, but there are two reasons for that. Covid was one factor; it has created delays for our defence industry partners and their supply chain. I understand that there were also issues with locating the necessary corps of skills, but it now seems well under control and we hope that the new timeline can be adhered to. British Aerospace is certainly very keen to demonstrate that and to commit to making it happen.
The noble Lord, Lord Wallace of Saltaire, raised the issue of levels of munitions. He is quite right that particular demands have fallen on that area due to the conflict in Ukraine. Those of us who listened to the extraordinary, courageous address by Madam Zelenska yesterday—I was among those privileged to be there—could not help but feel huge admiration for her, her husband and the people of Ukraine, as well as a sense of pride that we have been able to come to their assistance. We have been able not just to support them in what they have been looking for but, I hope, to give them the reassurance of optimism and hope for the future; Madam Zelenska referred to that. I reassure your Lordships that, in our supply of anything we have provided to the Ukrainian armed forces, we have never compromised our own levels of stocks in relation to meeting our national security obligations.
The noble Lord, Lord Alton, referred to someone—that sounds rather disrespectful; it was someone very eminent—who used to be in RUSI who had certain challenges with the Bill. As a former lawyer, I would say in response that I think the Bill is a welcome clarification and consolidation of procurement law in the United Kingdom. For the MoD, there has been carefully researched tailoring of the Bill to meet the unique requirements of defence. Our industry partners have been positive, so I think the Bill has the potential to introduce far greater clarity to industry—both primes and smaller contractors—and give them a much clearer sense of how they engage, what they can do and what the rules are. That is absolutely to be commended.
In conclusion, I am under no illusions about the challenges the MoD faces in relation to large-scale procurement. We recognise these challenges, and that is why we continue constantly to explore additional actions to mitigate the effects of cost escalation and cost growth. I hope I have been able to explain in sufficient detail what we do already—particularly the very specific character of the National Audit Office, which is independent of government—to enable your Lordships to understand why the MoD is unable to accept this amendment, while it does identify with the sentiment with which it was put forward. I ask the noble Lord, Lord Coaker, to withdraw the amendment.
(2 years, 6 months ago)
Lords ChamberI do not have that specific information before me, but the noble Lord’s point is noted and I shall make inquiries.
My Lords, I am sure the Minister agrees that much has changed in the world since the OSS was first conceived and the contract let. Would the Minister concede that it is inappropriate to stand at the Dispatch Box and find reasons why this project is being delayed? It would be more appropriate for the Minister to explain how it is being expedited and sped up to meet the new world situation.
The MROSS is not a military engagement ship, per se; it is a ship that will do important surveillance activity, with reference to our subsea cables and energy infrastructure. I do not for one minute disagree: it is an important project; the MoD recognises that, but it is complex. That is why proper regard to due process must be taken.