Lord Berkeley of Knighton
Main Page: Lord Berkeley of Knighton (Crossbench - Life peer)Department Debates - View all Lord Berkeley of Knighton's debates with the Department for Transport
(4 years, 9 months ago)
Lords ChamberMy Lords, of course HS2 should be built, but it must be HS2 as a whole—the full route—and it must continue through to Scotland, which we hope will still be part of the United Kingdom by the time that gets done.
There is a three-pronged argument for HS2. The first argument is that of levelling up the prosperity of the north. Secondly, there is the environmental argument. In 2018, the transport sector accounted for 33% of all CO2 emissions in our country, and most of that came from road transport. Electrified rail is significantly cleaner than road, air or sea traffic. Research by Greenguage 21 on behalf of the Campaign to Protect Rural England, the Campaign for Better Transport and the RSPB showed that HS2 emissions per journey will be 73% lower than for those by road or air.
Thirdly, of course, there is the capacity argument: existing routes are full and getting fuller. As far back as 2014, 26% of morning peak trains on this route arriving in London were over capacity. We need a new long-distance, high-speed line to free up existing lines for commuters on shorter routes.
HS2 has been under sustained attack, and despite the positive response of the Oakervee review, the project is still subject to scrutiny, as the noble Lord, Lord Adonis, set out. The aim is largely to reduce costs—that is scrutiny—but there is environmental criticism as well. However, any attempt to reduce costs is likely to involve changes to the features specified in this debate: the route, the speed or the station locations. Critics of HS2 have often concentrated on the apparently poor cost-benefit ratio showing a poor business case for HS2. My noble friend Lady Kramer, in the debate we had following the publication of the Oakervee review, exposed how narrow that cost-benefit analysis actually is. There have been criticisms for years of the way in which we do our transport cost-benefit analysis. The analyses of rail schemes do not take into account the regeneration potential of such schemes. It is time for the Government to move on and adopt a new means of analysis so that we take account of potential regeneration. Other countries do so when planning their infrastructure, and we should be doing this on a firmer basis.
The danger is that any attempt to reduce the costs of HS2 will take the easy solution and simply curtail the route, but Northern Powerhouse Rail’s plans are designed to integrate with HS2. One is dependent on the other, so that is not an option. Only by building the full route will we maximise the potential of HS2 to, for example, replace internal flights. Not only will emissions be 76% lower than those of an internal flight but it will also be able to compete on journey time and cost. There are examples on the continent of rail replacing flights very effectively where high-speed lines have been built.
We can find plenty of European examples of high-speed rail regenerating cities and creating jobs, such as Lille, Lyon and Zaragoza. In the UK, our one high-speed line—the short stretch of HS1—has had a catalytic role in enabling regeneration around its stations. It has been an all-round success, with reduced journey times, increased capacity, reduced overcrowding, improved punctuality and reliability and the encouragement of a modal shift from car to rail.
I want to address the specific issues set out in the title of this debate: the speed, the stations and the route. First, speed costs money. HS2 is designed to travel at 400 kilometres per hour, but this costs a lot of money. Compare that with, for example, the speed of 325 kilometres per hour achieved on the TGV. Evidence to the Economic Affairs Committee suggested that reducing the speed would reduce the costs by £1.25 billion and the benefits by £6 billion. I do not know whether that is 100% accurate, but even if it is generally in the right ballpark, it is difficult to justify much reduction in speed unless you can be absolutely sure that there will be a significant reduction in cost.
There are some really controversial issues to do with the stations. It is worth pointing out that most high-speed lines in other countries do not link into the centre of the capital city. I have always believed that using Old Oak Common as a terminus is a reasonable approach, certainly in the early years. It would reduce the amount of disruption in the Euston area and the cost of regenerating that station. Some £2 billion of the increased cost of HS2 is due to the increased cost allocated for Euston station alone. Of course, the capacity of Old Oak Common would have to be increased beyond what is planned at the moment. The original reason for the Euston link was to link with HS1, but that direct link has already been abandoned, so that is one argument down for continuing the concept of building the Euston station interchange immediately.
I would like to put in a quick word for the Crewe link. On behalf of the people of north and mid Wales, I am very keen indeed that that link is maintained. It is important that every nation of Great Britain benefits from HS2. That link to Crewe is essential for railway efficiency in north and mid Wales.
I am very pleased to hear that support from the Chamber. Can the Minister tell us whether final decisions have been made about the Sheffield station? I remember there was a huge debate about its location, and I have not heard the resolution on that.
The noble Baroness, Lady Bennett, referred to the importance of being prepared to change the route. It is important to bear in mind that significant changes have already been made, with many miles of tunnelling having been introduced as a result of the work of environmental campaigners. That is an extremely good success story. However, the costs of tunnelling are much greater than those of building on the surface.
In conclusion, I believe we need to get on with this. We lag badly behind other countries on high-speed rail. I suggest that the Government take the advice of the Institution of Civil Engineers to work closely with rail industries in France, Spain and Germany, where there have been hugely successful high-speed lines. I fundamentally disagree with the noble Baroness, Lady Bennett. We has to take the umbrella approach to the environment and take the view that we have to preserve the integrity of the environment as a whole. Only by building an environmentally efficient, modern railway line will we get people out of their cars, off planes and on to the trains.
I wrote some of this brief, so I feel a little offended. I do not have that particular piece of data to hand, which I am disappointed about, but I will certainly write to the noble Lord when I can get it from my officials at the department.
My Lords, there is one little update on the question of Crewe, which the Minister mentioned. It is worth reflecting on the fact that at the moment, the Wye and the Severn being flooded means that people trying to get to London from Wales probably cannot get there via Shrewsbury and Hereford, which means that they are forced to go to Crewe. That is quite a significant point.
I agree with the noble Lord: that is a significant point. This new train line is also about adding resilience. Now, if the west coast main line goes down, as I believe it did yesterday—for which my apologies—there is no plan B. Therefore, it would certainly give the people of Wales a plan B to get them either from London to Wales or vice versa.
The integrated rail plan terms of reference were published in late February—they may have been published on a Friday, but this Government work on Fridays. The Secretary of State aims to publish the plan by the end of the year. We want to get this right. It is important that we get it done, but it must be right. The noble Lord, Lord Adonis, made a couple of references to the Oakervee Review and various conclusions therein. Conclusion 11 recommended that we undertake a circa six-month study of the 2b scope in the context of the Midlands Engine Rail and Northern Powerhouse Rail proposals, so it is one of Oakervee’s conclusions. Conclusion 12 recommends that the Government consider smaller Bill phases
“to allow easier scrutiny of proposals in Parliament and faster construction”
so we may look at that. To do the phase 2b Bill in one go will be a challenge, but I am sure it is doable and that we have the stamina to do so. However, if it would be helpful, it might be a good idea to have smaller Bills. The Government’s next steps are therefore consistent with what Oakervee suggested.
On the comments of the noble Lord, Lord Greaves, on the route, the Secretary of State has committed to delivering HS2 to Leeds via the east Midlands; we have no plans to route HS2 trains from London to Leeds by Manchester.
On the specific issue of Leeds station, the HS2 station design for Leeds aims to integrate an HS2 station with the existing conventional station to allow for easy access and interchange between HS2, Northern Powerhouse Rail and local services across West Yorkshire and the north.
There was an original plan in Leeds to locate the HS2 station towards the south, but work to review the options further in 2014-15 recognised that priority should be given to greater interchange.