Grand CommitteeMy Lords, this is my last amendment in this section and it is to do with timetabling. Again, we had this experience with Crossrail and the great western route. We were pressing for a long time, saying, “You’re adding extra trains on to the great western. Where will all the freight trains and the intercities go, as you’re not building any more tracks?”. I said they had to produce a timetable. The first timetable produced for the great western between Reading and London was wonderful but it had only Crossrail trains on it. They said, “That’s the timetable” and I said, “What about the other trains?”. They said, “Oh, we haven’t put them on”. I said, “If you’re running a railway, you’ve got to put every train on the timetable. Don’t be silly, go away and do it again”. After about a couple of years, they came back and said. “Here it is”.
I gave their timetable to my experts and said, “Is the freight capacity that the Government have committed to on the timetable?”. They said, “Well, you’ve got 22 freight trains a day on it and you asked for 26”. I said, “Where are the others?”. They said, “Crossrail says they are on the timetable”. They were, but for a different line that went across the great western route on a bridge, so it was completely irrelevant. I got pretty angry then and said, “Can they go the other way?”. They said, “We haven’t checked that but it’s on the timetable”. They were adamant that they had to get priority for the Crossrail trains to Reading on the slow lines. They really wanted all the other trains to go on the fast lines. I got as far as telling some Members of Parliament in Cardiff and Bristol that they were going to have one train an hour and not two, because Crossrail was going to take all the paths. Eventually, the infrastructure manager was told by the Government to do a comprehensive timetable, which is Network Rail’s job. That is what should happen.
Here, we have HS2 and the west coast main line. As I said on Tuesday, you have six tracks at Handsacre junction going into three for a bit, so there may be a traffic jam of trains. It is reasonable to have a draft timetable produced either by HS2 or Network Rail, or hopefully by both, to demonstrate how many of the trains that everybody wants to run can actually run up there. I argued against Handsacre on Tuesday but if it happens, we have to have a timetable because otherwise something will go wrong. It should be up to the regulator to decide which trains have priority and who can run them.
This is very much a probing amendment. The Minister may say that it is happening already, although I would slightly challenge that. If it is not, perhaps he could say a few words to the relevant people to make sure that it does happen quite quickly and that there is good consultation with all the operators. I beg to move.
My Lords, unless I mistook what was going on, I have a feeling that the Minister has already replied to this amendment. I feel that the reply he gave to Amendment 22 was in fact a reply to Amendment 24A, hence the reference to freight paths and to keeping arrangements flexible in advance and not making commitments this far out. It may be that he has more to add on these issues.
I would make just two points. It is not clear to me why my noble friend thinks that publishing a draft timetable nine years before the line opens is a good idea. This would build up a whole set of debates, expectations and controversies long before the likely pattern of demand and usage is clear. Was there some particular reason why he was so keen that this work should be done so far in advance of the opening of HS2?
The second point that the Minister replied to earlier was about freight use, but of course it is not envisaged that there will be any freight paths on HS2. Perhaps my noble friend will say why he thinks there should be, because the released capacity on the west coast main line will provide very significant additional freight opportunities, and of course freight trains do not run at the speeds achieved by passenger trains, so they would significantly disrupt the operation of the high-speed service if they operated during the day. Moreover, as the Minister also said earlier, I understand that the custom and practice on most high-speed lines is that maintenance work will be done overnight and it is therefore essential that the lines can be closed for that purpose. So I was not quite sure about some of the points made by my noble friend—why he wants either to set these in stone now, or in the case of freight, to build up expectations that there would be freight services on this line, which is quite unlikely to be the case.
(7 years, 11 months ago)
Grand CommitteeMaybe I can help. My noble friend at some stage probably came down the Channel Tunnel while we were building it. We had boring machines boring the tunnels, but there were two caverns for crossovers, which were mined using something called the new Austrian tunnelling method, which involves more or less what the noble Viscount said. It is a big digger on tracks with a revolving arm and cutters that stick out. Something then gets the spoil that goes underneath it, then you spray concrete with reinforcing mesh on it and put in in situ or precast concrete later. It is supposed to be a lot cheaper; you do not need a boring machine. My colleagues have looked at the costs and they reckon that there is about £750 million to save. It is a very good scheme.