All 2 Debates between Baroness Vere of Norbiton and Lord Swire

Trains: Wifi Provision for Passengers

Debate between Baroness Vere of Norbiton and Lord Swire
Thursday 25th May 2023

(1 year, 6 months ago)

Lords Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Baroness Vere of Norbiton Portrait Baroness Vere of Norbiton (Con)
- View Speech - Hansard - -

I will revert to where I started on this. No decisions have been taken. As part of the business planning process, we have asked the train operating companies to look again at the services provided and to come up with a business case which sets out the benefits to passengers and the costs of providing that service. However, usage of wifi on trains is actually quite low. It is available from all train operating companies but is not available on all trains.

Lord Swire Portrait Lord Swire (Con)
- View Speech - Hansard - - - Excerpts

One of the reasons that wifi use on trains is perhaps a little low, as my noble friend says, is because it is so hit and miss. I have been involved in an energetic correspondence with Mr Mark Hopwood, the managing director of GWR. I say energetic. It is energetic on my part, but less energetic perhaps on his; an acknowledgement would be a start and an answer even better. The truth is that we have a terrible problem in this country with productivity, and train time is dead time. You can get wifi on a plane and on a boat; surely you should be able to get reliable wifi on trains. If the problem is with Network Rail, then we really need to look at the relationship we have with the train operators, Network Rail and the whole infrastructure.

Baroness Vere of Norbiton Portrait Baroness Vere of Norbiton (Con)
- View Speech - Hansard - -

The wifi on trains usually runs off the same 4G and 5G system that my noble friend will have on his smartphone, so sometimes there can be reliability issues. It also depends on how many people are using the wifi on the train. It is there for email and other low data usage requirements. It is not really there for streaming, but I accept that sometimes the bandwidth can be a little challenging.

South West Rail Resilience Programme

Debate between Baroness Vere of Norbiton and Lord Swire
Monday 22nd May 2023

(1 year, 6 months ago)

Lords Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Baroness Vere of Norbiton Portrait The Parliamentary Under-Secretary of State, Department for Transport (Baroness Vere of Norbiton) (Con)
- Hansard - -

My Lords, I can confirm that Network Rail has delivered two phases of the south-west resilience programme, providing protection to the railway at Dawlish from coastal flooding. The third and fourth phases addressing cliff protection measures are in delivery, with a combined budget of £85 million. Network Rail is being funding to deliver a detailed proposal for the fifth and final phase, which addresses cliff protection for a mile-long stretch of the railway.

Lord Swire Portrait Lord Swire (Con)
- Hansard - - - Excerpts

My Lords, we listen with some amazement—

--- Later in debate ---
Baroness Vere of Norbiton Portrait Baroness Vere of Norbiton (Con)
- Hansard - -

As I mentioned in my opening Answer, Network Rail is working on the fifth phase of the works in some detail; we need to establish detailed proposals for this mile-long stretch of the railway. Local consultations have happened, and there was some reluctance around some of the proposals put forward. Therefore, Network Rail is looking at the scope and costs of the fifth phase.

Lord Swire Portrait Lord Swire (Con)
- Hansard - - - Excerpts

My Lords, I apologise for being a bit too quick, which is more than you can say for any of the trains travelling to the south-west. In the south-west, we look and listen in envy to talk of chopping off bits of time on the cross-Pennine railway and others. That is not a luxury we have; we have only one railway beyond Exeter linking the whole south-west peninsula. If Dawlish goes down, we have no connectivity at all. While I very much welcome all the money and the moves the Government have made with the resilience surrounding Dawlish itself, until such time as we have a second railway bypassing or connecting Plymouth—either west of Dartmoor or in line with some of the other options—we can never be sure that we can keep the south-west connected 365 days a year.

Baroness Vere of Norbiton Portrait Baroness Vere of Norbiton (Con)
- Hansard - -

I welcome my noble friend’s interest in this Question; I know that he raised this issue in the other place many times. I assure him that delays on the line as it currently stands are significantly down, from 53.6 minutes per 1,000 services in 2018-19 to just 36.1 minutes per 1,000 services in 2022-23, so it is important to note that the resilience of the line is improving. The department has looked at alternatives—additional routes through to the south-west that might provide additional resilience. However, we are focused on improving the resilience of the line as it currently stands. In proposals for restoring elements of railway that previously existed, the case was not set out sufficiently.