Lords ChamberI agree with the noble Lord: that is a significant point. This new train line is also about adding resilience. Now, if the west coast main line goes down, as I believe it did yesterday—for which my apologies—there is no plan B. Therefore, it would certainly give the people of Wales a plan B to get them either from London to Wales or vice versa.
The integrated rail plan terms of reference were published in late February—they may have been published on a Friday, but this Government work on Fridays. The Secretary of State aims to publish the plan by the end of the year. We want to get this right. It is important that we get it done, but it must be right. The noble Lord, Lord Adonis, made a couple of references to the Oakervee Review and various conclusions therein. Conclusion 11 recommended that we undertake a circa six-month study of the 2b scope in the context of the Midlands Engine Rail and Northern Powerhouse Rail proposals, so it is one of Oakervee’s conclusions. Conclusion 12 recommends that the Government consider smaller Bill phases
“to allow easier scrutiny of proposals in Parliament and faster construction”
so we may look at that. To do the phase 2b Bill in one go will be a challenge, but I am sure it is doable and that we have the stamina to do so. However, if it would be helpful, it might be a good idea to have smaller Bills. The Government’s next steps are therefore consistent with what Oakervee suggested.
On the comments of the noble Lord, Lord Greaves, on the route, the Secretary of State has committed to delivering HS2 to Leeds via the east Midlands; we have no plans to route HS2 trains from London to Leeds by Manchester.
On the specific issue of Leeds station, the HS2 station design for Leeds aims to integrate an HS2 station with the existing conventional station to allow for easy access and interchange between HS2, Northern Powerhouse Rail and local services across West Yorkshire and the north.
There was an original plan in Leeds to locate the HS2 station towards the south, but work to review the options further in 2014-15 recognised that priority should be given to greater interchange.
There is a difference between having an interchange at the hammerhead and a junction at the east so that trains from the south can go to all other places.
I suspected that I would not keep the noble Lord 100% happy. I will certainly write to him.
I have various elements on the environment but that was not in the topic of the debate so I will have to write to the noble Baroness because I am out of time, which is incredibly disappointing.