(3 years, 8 months ago)
Lords ChamberMy Lords, for the last four or five years, we have had a Government who have produced lots of very black and white-looking documents, usually a thousand pages long and full of lots of impenetrable words. Suddenly we are into glossy brochures again. I am not complaining, because I can cut the glossy brochures out and pin them on the wall for my grandson.
In the 20 years that I have been a Member of this House I have accumulated a vast number of glossy brochures produced by Governments. When I look at them now, most of them bear little relationship to what actually happened. I welcome the fact that the Government have noticed buses again. I welcome the passion that we have seen from my noble friend Lady Randerson and from the Minister. If buses are the modern passion of the House of Lords, that is great, but will the Minister accept that a national bus strategy can work only if it consists of myriad local bus strategies which must be in the hands of local people who know what is needed and what is wanted?
Will the Minister also accept that, while the document says that people want simpler fares and more routes and services, in many areas they also want much cheaper fares? I think noble Lords would be astonished at how much it costs to take a simple, short ride on a bus in many parts of the country outside big cities. It is okay if you are in a metropolitan area where it is subsidised—it is nirvana in London—but out in the sticks it is very expensive indeed and people will not leave their cars unless it is much cheaper.
Finally, will the Minister accept that, in addition to the concentration on cities and rural areas, a huge number of important bus services serve ordinary small and medium-sized towns? Towns are the most difficult places in which to provide frequent, cheap services because they do not have the demand of cities, and there is not the requirement for at least a skeleton service in rural areas that people recognise. Towns—the places in between and on the edge—are the places that this strategy will succeed or fail by.
The noble Lord is right, and in the middle of his contribution he basically set out what is in the strategy: giving control and accountability to local authorities. He made some important points about services and how different areas will have different needs. One of the bits buried in the bus strategy is how local authorities will be expected to set up something like a bus advisory board or equivalent, which will take into account the views of local people, services and businesses—everyone who has an interest in making the network run as well as it can. Even though all those people will put in their contributions, it will be up to the local authority to have the skills and capabilities to meet those needs and devise the sort of network that will be required. That bit is probably quite challenging, which is why we have put quite a lot of money into it.
Alongside listening to people and putting the network into place, it will depend on the situation; the strategy is not focused on rural and urban—it is focused on everywhere, as we recognise that every single place will be different. In some areas, turn-up-and-go on bus corridors will be perfectly acceptable and we will be able to put in more services in the evenings and at weekends. The other area that concerns me, to be honest, is cross-border services: how we make sure that longer services between two local transport authorities continue to function in an effective fashion. I recognise there is a lot to do. The Government stand ready to provide guidance, advice and support to local authorities as they take this challenge and run with it.
(3 years, 9 months ago)
Lords ChamberMy Lords, the recent pulling of the funding by the Government for Transport for the North’s scheme for smart ticketing across the north of England seems extraordinary in view of what the Minister has already said. Is this not a blow for the railway across the north of England and an indication that “levelling up” is no more than a slogan and has no substance? Will the Minister go away and get this reversed?
Not at all: TfN was allocated £150 million at the 2015 spending review for this integrated and smart travel programme. It was always the case that that funding was going to expire at the end of the current financial year. To date, TfN has managed to spend £24 million, and that is a good start, but we are now considering how best to deliver more effectively—and perhaps more quickly—a rollout of smart ticketing to improve passenger services across the north.
(3 years, 10 months ago)
Lords ChamberOf course, we will look at modest electrification projects when and if they are brought forward. The issue of journey times is important, but rail freight has the advantage of being able to carry less urgent goods—heavy construction materials, for example—over long distances. Therefore, it can be used for lots of different types of freight, which is to its advantage.
My Lords, by 2010 rail electrification in England had stopped. Thanks to the Liberal Democrats in the coalition, it got going again. It has stopped again. When will it start up again?
I do not recognise an awful lot in that question, but I would like to reassure the noble Lord that, of course, it has not stopped; projects do not stop just because you cannot see things being built. A huge amount of work happens before a project starts, as the noble Lord is well aware. This Government are committed to electrification and will look at appropriate schemes that secure value for money.
(4 years ago)
Lords ChamberThe noble Lord must be reading our minds. Of course, there will be man things that we might want to consider doing once the course of the pandemic is clear and we have come out the other side, and once there are no restrictions on people’s travel. It may be that we introduce certain incentives, because we all know that the best way to travel is on public transport.
My Lords, the Minister is being uncharacteristically coy in her answer to all these questions and saying nothing at all. She did say that the railways at the moment must be available and safe. They are available and are extremely safe, but the danger is that when the Covid emergency comes to an end, people will not go back to them. Can she tell us what the Government’s plans are and what they are thinking about in order to get people back on trains once it is possible for everyone to go on them?
I am not sure I have been called “uncharacteristically coy” before. However, the noble Lord is absolutely right: we are in a situation at the moment where people’s habits may change, which means they may form the habit of not using public transport. This is the same for trains, light rail and buses, across our public transport system. Of course, the Government are thinking very clearly and hard about the sorts of mechanisms that we can use, whether that be marketing campaigns or incentives, as I outlined to the noble Lord, Lord Rosser. We will consider all of these things. However, now is not the right time for that; now is the time to follow the November restrictions to make sure that we keep the virus under control.
(4 years, 1 month ago)
Lords ChamberTo answer the first part of the noble Lord’s question, any decision on new or expanded project scopes will be made after the spending review has concluded. On decarbonisation more generally, whether it is uphill or downhill, Network Rail is developing an overarching traction decarbonisation network strategy which will provide strategic advice about which technology—electrification, battery or hydrogen—would be best suited to each section of a decarbonised rail network. This would include individual decisions taking into consideration local conditions and topography, and they would be developed as needed.
My Lords, I want to concentrate on one small scheme that after years of stop and start has reached stage 2, the development stage, of the pipeline: the reinstatement of 11 miles of track between the forlorn single platform and buffer stops at Colne and Skipton. Does this review mean that the Colne-Skipton project has gone back to stock and everything will again be thrown up in the air? When will we be told we can start again?
As the noble Lord has mentioned, that particular project is at stage 2, which is the “develop” stage; it needs to go to “design” and then to “deliver” to be built or reopened. The pipeline is always very ambitious, and it is the case that a project getting into the pipeline does not necessarily mean that it will be delivered—it will depend on the value-for-money and various other considerations over that period. I cannot comment specifically on the Colne-Skipton railway, but it will be reviewed alongside all the other projects. That does not mean that it is going backwards in any process.
(4 years, 9 months ago)
Lords ChamberMy Lords, the third runway at Heathrow is a private development. If it falls within the criteria of the airports national policy statement, it will go ahead.
My Lords, I give a perspective from the hills in the middle of the Pennines. I am interested in knowing that we are going to have more tree-dappled sunlight. We welcome the trees; the sunlight might be beyond even the present Prime Minister. I just point out that those of us who live in the corridor between east Lancashire and Skipton in the Aire Valley in Yorkshire are not bothered about having high-speed rail. We want our railway back: the 11 miles between Colne and Skipton. We would be quite happy for the trains to go at a normal speed, but please can we have our railway back?
The noble Lord is a doughty campaigner on this matter. We have heard his message and, as he knows, we are working on it.
(5 years, 1 month ago)
Lords ChamberMy Lords, the provision of capacity and capability for cross-Pennine freight is a key priority for the Department for Transport. We are considering how best to enhance the current capability and capacity for cross-Pennine bulk and intermodal rail freight between a range of origins and destinations. This includes consideration of the potential freight demand via a reinstated Skipton-Colne route. This piece of work is due to report soon and will include a wider assessment of cross-Pennine rail freight.
My Lords, I refer to the Colne-Skipton gap in the network. The then Secretary of State, Chris Grayling, came to Colne at the beginning of last year and again at the beginning of this year to announce two studies. On 19 September, the Department for Transport said:
“An initial study, which was completed in December 2018, found that it is technically feasible to re-open the line. We are now working to assess the freight demand and the commercial viability of the scheme”,
as the Minister said. The new team of consultants attended a routine meeting of the high-level project development team at Peel Ports in Liverpool on 26 September this year. According to people present, the new contractors said that the route was entirely unsuitable for freight of any kind. Can she investigate what is going on? Will she arrange for the publication of the original Steer group report, so that we all know what is in it?
I can indeed update the noble Lord about what is going on: work is continuing apace to understand the amount of freight demand that is not currently being and may be met in future by reopening this line, as well as to look at the commercial viability of the scheme. I undertake to him that we will publish all the reports when these important issues have been fully explored and we understand the full picture.
(5 years, 2 months ago)
Lords ChamberI would be delighted to meet the noble Baroness when diaries allow.
My noble friend Lord Framlingham mentioned fraud. I would like to be clear that neither the Serious Fraud Office nor the police has contacted HS2 regarding any investigation, nor made any request for information in that regard.
The noble Lord, Lord Greaves, asked whether HS2 was competent. The Oakervee review will of course look at how we have arrived at the place we have, and at whether HS2 as it stands is able to deliver the project. We would not want to prejudge that outcome, but we have been working closely with the new chairman to ensure that HS2 has the right skills at this important stage to take the project forward.
The noble Baroness, Lady Randerson, mentioned salaries, expressing surprise at the number of people who are paid quite high salaries within HS2. I do not know that I agree with her on this one. These are very technical positions, which need quite a lot of skill and experience, and I have not yet been able to see any benchmarks which would mean that they are not reasonable salaries to pay to these highly skilled technicians and engineers.
The noble Lord, Lord Tunnicliffe, raised the important issue of connectivity. I said in my opening remarks that HS2 will be able to connect the major cities of the UK, but also described how the hub-and-spoke system then goes out to more than 100 cities and towns, which will be able to benefit. It is probably slightly early days now to think about those towns, because we need to get closer to the date of completion and services. However, I agree with him that whoever is in government at that time—I very much hope that it will be the Conservatives—will work with local authorities to make sure that we have an integrated transport system so that the buses connect with the trains, and all those things happen that we all would like to see.
The issue of Old Oak Common was raised a couple of times. We published a response to the Economic Affairs Committee report in July 2019, which mentioned stopping at Old Oak Common. There are few benefits, because stopping there means that you cannot transfer on to other transport systems, but the Oakervee review will of course look at that issue.
On the basic point about connectivity, will the Minister confirm that, when 2b is built, the trains will indeed run through to Preston, Carlisle and Glasgow?
I am unable to confirm that just at this moment, purely because I do not know, not because that decision has gone one way or the other. My apologies.
Oakervee is looking at the costs and benefits and, as the noble Lord mentioned, the costs have increased—the envelope was originally £55.7 billion, and Allan Cook now estimates that that is between £72 billion and £78 billion.
The noble Lord, Lord Teverson, asked about similar projects in other nations. It is difficult to compare us to someone else. We have very different countryside, and various stakeholders have very different needs. That point was raised by the noble Lord, Lord Snape. If we were to keep absolutely everybody happy on the environmental side of things, we would never build anything ever again. Clearly, that is not a feasible option, and therefore we must have a balance. While Oakervee will look at this, given our landscape and our need to mitigate against justified environmental concerns that have been raised, the cost of these things becomes quite high. I mentioned at the outset that there is a significant amount of tunnelling and cutting; some of that is down to the landscape that the line is going through, but also environmental concerns there. In later debates I will give examples of where we have literally moved the route to go around a tree. Those are the sorts of things that, with respect, may not necessarily happen in other countries. On the flip side, knowing France fairly well as I do, much of the country does not look like Staffordshire, so there are differences.