Lords ChamberMy Lords, I declare my relevant interests as a vice-president of the Local Government Association, chair of Heart of Medway Housing Association and a non-executive director of MHS Homes Ltd.
Three and a half years on from the Grenfell tragedy, in which 72 people lost their lives, decisions made by the Government have left thousands of people trapped in unsafe homes and many more unable to move. The Government’s announcement has come far too late for many and is, sadly, a repeat of undelivered promises. It backtracks on a key promise that no leaseholders should have to pay for the cost of this scandal, which is not of their making. On 11 March 2020, nearly a year ago, the Chancellor of the Exchequer said that
“all unsafe combustible cladding will be removed from every private and social residential building above 18 metres high.”—[Official Report, Commons, 11/3/20; col. 291.]
But that has not happened.
The funds set up have been dogged with problems. It would be helpful if the Minister could tell the House how much of the money available has been spent so far. I believe there has been a major underestimation of this scandal—this problem—by the Government. Can the Minister tell the House how many buildings are unsafe, where they are and what danger they pose? Until the Government have credible answers to these basic questions, there will continue to be mistakes and the offering of piecemeal solutions that must be updated when they do not deliver. Can the noble Lord, Lord Greenhalgh, update the House and guarantee that the funding provided will cover all buildings over 18 metres high?
Will the Government set up an independent task force to prioritise buildings according to risk, with powers to get the funds out of the door and the ability to go after building owners when they fail to get the work done? That has been a consistent problem that we have raised again and again. Ministers have now promised 17 times—yes, 17 times—that leaseholders will not bear the cost of fixing a problem they did not cause; these were the promises made to the innocent victims of this scandal. But the Government have betrayed their promise that leaseholders will not pay for the building safety crisis. Three and a half years on from the Grenfell Tower disaster, hundreds of thousands of people cannot sleep at night because their homes are unsafe. On top of that, the Government have decided to pile financial misery on them. This is wrong; it is an injustice, and it is unacceptable.
Can the Minister tell the House why this arbitrary 18-metre height limit means the difference between a safe home and, potentially, financial ruin? What are the terms of the loan? What will the interest be? Will leaseholders be required to pay the interest as well as the main costs? On the point that the leaseholder will not pay more than £50 a month, if they sell the property, does the loan have to be paid at that point? Does it go with the former owner, or does it stay with the current owner? We need to know where we stand. How long will the scheme run for? Will it go up by the rate of inflation each year? What will the Government do if these homes remain unsaleable? How will they ensure that freeholders take up the loans? How will the Government speed up remediation, given that the current stalemate cannot continue?
Other properties do not have dangerous cladding, but these people have been charged thousands of pounds per flat to fix other safety issues. The Government should focus on securing our economy and rebuilding after Covid, not saddling homeowners with further debt. The Government should pursue those responsible for payment and prevent leaseholders and taxpayers carrying the can. The Government have announced a levy and a tax, which I welcome, but those responsible should bear the cost. How much do the Government anticipate the levy will raise? Will they pursue others, such as the cladding manufacturers, responsible for putting the dangerous cladding on in the first place? The Government have missed every target for removing ACM cladding and 50,000 people are still living in flats wrapped in it. This is the same cladding that was found on Grenfell Tower, and thousands more have other dangerous cladding on their buildings. When will this all be removed?
What about the skyrocketing insurance costs that innocent victims are being forced to pay? Can the noble Lord, Lord Greenhalgh, tell the House what he expects, on average, a leaseholder to pay? People cannot continue to live in unsafe, unsellable homes. Homeowners should not be faced with financial ruin—bankruptcy, even—to fix a problem they did not cause. Unfortunately, these proposals, instead of providing justice, will still leave too many people struggling and facing loans. This is a very poor Statement from the Government—they will have to come back to the table and do what they promised in the first place: ensure that no victim of this scandal will have to bear the cost of fixing a problem they were not responsible for.
My Lords, I thank the Minister for the repeat of this important Statement on the Government’s response to the cladding crisis. I remind the House of my interests, recorded in the register, as a member of Kirklees Council and a vice-president of the Local Government Association.
I was pleased when I read the heading of the Statement, “Building Safety”, and the opening paragraph, which refers to the mission of the Secretary of State being that of “safety and fairness”. Unfortunately, the Statement then fails to live up to those laudable words. The first issue I have with it is that throughout, there is reference only to “unsafe cladding”. In fact, what has become clear, as the vast scale of the problem that the Grenfell tragedy exposed, is that the building safety failings go far beyond “unsafe cladding”. As flammable cladding is removed, in some buildings further significant construction failings are revealed: flammable insulation has been used; firebreaks have not been built into the structure as a way of slowing the spread of a fire; balconies are not made of fire-retardant material; and spandrel panels are also seen as a potential safety concern.
How do I know this? In January 2020 the Ministry of Housing, Communities and Local Government issued guidance note 23, relating to the seven building components under review, requiring building owners and managers to take urgent action on these. The question for the Minister, therefore, is: will the additional government funding pay for all the defects revealed when the unsafe cladding is removed? If, for instance, it becomes evident that there is an absence of firebreaks, will the funding cover the costs of installing them? If not, the leaseholders will still be faced with large bills to pay for failings in the construction.
The next fundamental question that I hope the Minister can answer is: why has 18 metres been chosen as the bar above which cladding removal is funded by the Government and below which the leaseholders and tenants are required to pay? Is the 18-metre figure an historic one that needs to be reassessed? Serious fires can occur in blocks of varying heights: for instance, the fire in a block called The Cube, in Bolton, was very serious—although fortunately, there was no loss of life—but the building was lower than 18 metres.
That leads me to the question of fairness. As noble Lords will recall, this is the mission of the department in respect of building safety. Can the Minister explain how it is fair for leaseholders in blocks below 18 metres high to have to pay for remediation? I recognise that low-interest loans are available and that the currently anticipated maximum payment is £50 per month. This will, no doubt, be added to the service charge and will be one of the costs that potential buyers will consider. It will make these flats less attractive to buyers and they will almost certainly command a lower value. How is it fair to require leaseholders to pay for building remediation which is not in any way of their making?
One of the roles of government is to ensure that safety regulations are appropriate to the task and that there is an inspection regime. The Government have failed to do this, so they are partly culpable, must bear the cost and recoup it from those who share culpability.
Then there is the question of building regulations. It is alleged that some of the buildings affected by this scandal failed to comply with building regulations at the time of construction. Can the Minister confirm this and provide some estimate of the numbers involved? Where breaches of regulation are involved, will the Government require full remediation costs to be met by the developer? This is what happens with the manufacturers of cars and white goods, for example. Surely it should also apply in these instances. Does the Minister agree?
Next, I turn to the total funding package. The additional funding provided by the Government is a start, but this £5 billion needs to be put into context. During the debate on the Fire Safety Bill, the Minister confirmed that the total cost of remediation was likely to be in the region of £16 billion. Does that imply that £10 billion or more will be paid for by leaseholders through the loan scheme? Perhaps the Minister will let us know whether this is what the Government have calculated.
It is proposed to recoup some of these costs from developers by raising £200 million per annum via a tax on the sector. The cost of the minority of the remediation to be recouped from developers is pathetically small. During the last four years, the five largest developers made profits of around £16 billion, which rather puts the proposed figure into context. Will the Government reconsider the level of this tax to make it fairer?
Finally, I hope that the Government do not need to be reminded of the terrible, personal cost of the cladding scandal. For instance, Laurel and Jonathan in Manchester are seriously considering bankruptcy as the only way out of their predicament. Hayley in Leeds has already been forced into bankruptcy. In an Inside Housing survey last year, 23% of respondents said that they had considered suicide. Such is the stress of living in an unsafe home and being forced to pay huge increases in insurance and service charges. For leaseholders and tenants, this building safety crisis is not in any way of their making, yet they are expected to pay the price while those who created it are not being similarly expected to pay in any significant way. Can the Minister explain how this adheres to the department’s mission of fairness? Will he press for a review of the current proposals as more information comes to light?
My Lords, around £3.5 billion in direct, additional grant has been committed. This is a significant amount of money which dwarfs the £1.6 billion previously promised. More than £5 billion has been committed to support the ending of the cladding crisis. The plans go a long way towards ensuring that affordability is not an issue for any leaseholders in medium-rise properties. It also ensures that, where there is no warranty outstanding or insurance available to protect the leaseholder, the taxpayer—through the Government’s additional grant—will step up and provide the funding necessary to ensure that the cladding system is removed.
The noble Lord, Lord Kennedy, asked about progress. Despite Covid, we saw 50% more starts in 2020 than in any other year. Workers were on site and, by the end of the year, 95% of high-rise buildings with the same sort of cladding as at Grenfell had either started or completed remediation. We know exactly where these buildings are. The vast majority of the remaining cladding will have been removed from them by the end of this calendar year.
The main thrust of the questions was around the scope of the fund. It is important to recognise that height is a huge factor when it comes to safety and the risk to life. The higher the building, the more risk there is to the residents. People who live in buildings between 18 and 30 metres high are four times more likely to have a fire involving a fatality or the need for hospital treatment. In buildings above 30 metres, this rises to 35 times more likely. We know that height is a factor. Eighteen metres is the cut-off point for the definition of a high-rise building. This has been part of building regulations for a considerable number of years. The definition that we are using for scope is above six storeys, so The Cube would fall within the remit of a building where an application could be made to the building safety fund to remove its cladding. The threshold is six or more storeys or a height greater than 18 metres.
The long-term safety advice makes it clear that the external cladding system acts as accelerant, helping the fire to spread. This is why the government money is focused on the removal of external cladding systems. Internal compartmentation, firebreaks and fire doors are designed to stop the spread of fire. It is right that taxpayers’ money should focus on the material that accelerates the spread of fire.
The £3.5 billion and the finance scheme will together help hundreds of thousands of leaseholders. For those in medium-rise properties, it will cover a significant part of their costs. For those in high-rise buildings, there will be no cost. To date, 13,000 leaseholders in ACM buildings have been supported by the government grant scheme. Between 70,000 and 90,000 leaseholders in buildings with non-ACM cladding systems will not bear any cost. A further 150,000 leaseholders in buildings between 11 and 18 metres high will also be helped.
It is important, however, that building owners step up to the plate to support remediation where the government grant is not available. We do not expect this cost to fall entirely on leaseholders. With the ACM fund, more than 50% of owners did the right thing and ensured that the cost did not fall on leaseholders. We expect to see that with the non-ACM buildings as well. Here, warranty schemes can often still be drawn on and protect leaseholders.
It is worth looking at the cladding manufacturers. I will take that point away because, as well as the developers, they are culpable for the situation that we find ourselves in—a point that has been made by both the noble Lord, Lord Kennedy, and the noble Baroness, Lady Pinnock. That is something that we can look at in due course.
This is a five-point plan looking at significant sums of money to support the removal of the external cladding systems. It is those systems that have accelerated the spread of fire and their removal makes it far more unlikely that Grenfell will ever happen again. We know that the future building safety regime will be focused on ensuring that the new buildings will be of far greater quality and then provide the greater confidence that is required in the housing market to ensure that it begins to function properly in future years.