All 1 Debates between Baroness McIntosh of Pickering and Chris Bryant

Managing Flood Risk

Debate between Baroness McIntosh of Pickering and Chris Bryant
Monday 3rd March 2014

(10 years, 8 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Chris Bryant Portrait Chris Bryant (Rhondda) (Lab)
- Hansard - - - Excerpts

I cannot speak to the situation in Somerset, but I hope that the hon. Lady would not advocate dredging in every situation. In the early 1990s and early 2000s, the local authority in my constituency sped up water flows higher up the valley, which led to a significant problem further down the valley. Surely we need a whole-valley answer.

Baroness McIntosh of Pickering Portrait Miss McIntosh
- Hansard - -

The hon. Gentleman will have listened carefully to the four headings that I set out—the different types of maintenance, of which dredging is a small part.

I turn to the flood defence maintenance funding for the coming financial years. It is with some sorrow that I see the reduction in the headline figures for flood defence maintenance, from £172 million in the financial year 2010-11 to £147 million for 2013-14. I hope that in discussing the supplementary budget, the debate will achieve one thing: an increase in maintenance from revenue funding and a more general grasp of the importance of maintenance in all its forms to preventing flooding in future. The Environment Agency’s £147 million maintenance funding for 2013-14 is allocated as follows, in accordance with the four maintenance categories that I rehearsed earlier. I repeat that there is only £30 million this year for clearing watercourses, normally referred to as dredging, which the hon. Member for Rhondda (Chris Bryant) mentioned. For operation there is £44 million, for structures there is £52 million and for mechanical electrical instrumentation control and automation there is £21 million.

The role of the Department for Environment, Food and Rural Affairs in climate change is narrow; it is about adaptation and seeking to increase resilience. However, it would help to allow the conveyance of water, to slow the flow with land management schemes upstream—dredging, desilting and other means—and to stop fast-growing willow coppice from blocking watercourses in order to allow the water to flow away in Somerset, Yorkshire and other areas across the country, to prevent flooding.

My Committee and I absolutely accept that there is no one-stop option that will prevent all forms of flooding; maintenance, as well as land management upstream schemes, has to be considered.