(5 years, 9 months ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
May I correct my friend and colleague, the hon. Member for Witney (Robert Courts)? Women will be serving on the aircraft carrier, too; it will not just be men.
The hon. Lady is quite right to correct me. I meant “men” in the global sense of “humanity”, but of course I was referring to men and women. I am sorry about that.
Moving on, may I alert the Chamber to my entry in the Register of Members’ Financial Interests? I am also a vice-chair of the all-party parliamentary group for the armed forces, and its lead on the Royal Navy—something that I am incredibly proud, as a woman, to be doing. You are going to get some grief today, my friend.
Let me briefly give my own perspective on some issues that have been already been addressed. The Queen Elizabeth class is exquisite: its ships are beautiful and will be a wonderful addition to our Royal Navy, as long as we ensure that we have enough crew to staff them—I will not say “man” them. The people who will serve on those platforms are incredibly important and we face challenges in recruiting them, but today I wish to speak about the wider military family, because the people who make the platforms are just as important for our national security.
Our capacity to continue to be a tier 1 military country depends on having a wider military-industrial complex to build our national security capabilities. Whenever I visit Rosyth shipyard or other defence establishments, I am always struck not only by people’s professionalism, but by their dedication. As the Minister knows, they build our ships because they know that their friends and family may well serve on them. It is important that they know that they are doing a perfect job to ensure that the best possible platforms are afforded to our service personnel—the best in the world for the Royal Navy.
The Queen Elizabeth class is an extraordinary feat of engineering. Some 11,000 people in six shipyards have touched the pieces of metal that were used to build its extraordinary capabilities. The platform represents £6.2 billion of capacity and equipment, not counting the F-35s that will be on it, or even the tableware that our service personnel will eat off; as MP for the Potteries, I am sure that the Minister will reassure me that the tableware will be purchased from my constituency. Please, Minister—give me a nod.
I want to consider the aircraft carrier in the widest possible context, because it demonstrates the challenges that we face in the sector, not only in procurement for the carrier itself, but in securing the carrier strike group over the longer term. It has been 12 years since 2007, when the then Secretary of State signed off the paperwork for the aircraft carrier and finally launched the programme to start the process of building it. Flight trials are happening this year. Even from the moment we agreed to build, it took us 12 years to get to this point, but prior to that there was a decade of debating, designing and determining the concept of our future aircraft carrier.
The project has challenged our shipyards. It has challenged us on whether we have the resources, the skillset and the domestic sovereign capability to build the platform. During the lifespan of the Queen Elizabeth class, we will have to replace the Astute programme and update and replace the Type 45. We will also have to replace the Type 23 with the Type 26, and then start talking about the Type 26’s replacement—all in the lifetime of this capability. By that point, we may even have seen one Type 31e.
Just ensuring strike group capability for the Queen Elizabeth class requires a long-term plan for procurement, so my urge, demand and request to the lovely Minister is that we look at the longer term. We need to consider the steady drumbeat of orders needed for our domestic industry to deliver the long-term capabilities that we require. We are still not sure how many fleet solid support ships we will actually get—we could probably do with three.
We should recognise how fabulous these platforms will be and what is required for their use, both from a military perspective and from one of diplomatic and soft power. We should also remember the people who made them: our constituents up and down the country. My constituency could not be more landlocked, but my constituents helped to contribute to the Astute class and the Dreadnought class. This is a national programme, with national consequences, making a national contribution to our GDP. I urge the Minister to give me my steady drumbeat of orders.