Transport Infrastructure: Essex

(Limited Text - Ministerial Extracts only)

Read Full debate
Wednesday 6th March 2019

(5 years, 1 month ago)

Westminster Hall
Read Hansard Text

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Jesse Norman Portrait The Minister of State, Department for Transport (Jesse Norman)
- Hansard - - - Excerpts

It is a great pleasure to serve under your chairmanship, Mr Stringer. This has been a very interesting debate. Of course, the focus has rightly been on Essex infrastructure, but I am grateful to the hon. Member for York Central (Rachael Maskell) for raising some other issues, and of course I will discuss them all.

Above all, I congratulate my right hon. Friend the Member for Witham (Priti Patel) not only on securing the debate, but on her Churchillian 37-minute speech. That is a new record for me in a Westminster Hall debate. It was very wide-ranging and interesting. She has been absolutely tireless in pressing the claims of not merely her constituency but Essex as a county. She gives indefatigability a bad name. If it were not for our relentless desire to maintain efficiency in the Department for Transport, we would have Patel SWAT teams scrambling every time she moves, and cross-modal engagement klaxons going off every time we heard something. If we did that, we would hear an awful lot of noise, because she has been very active in this area.

I am also aware of the work that my right hon. Friend has done elsewhere—my hon. Friend the Member for Rochford and Southend East (James Duddridge) touched on this—not just as head of the Great Eastern main line taskforce but as chair of the Essex Business, Transport and Infrastructure Forum, highlighting the importance of infrastructure in building sustainable local communities and strong local economies. That is all extremely welcome.

My right hon. Friend rightly focused on the natural, physical and human endowments that Essex has as a county. It has a very strong local economy and a resident population of 1.5 million-odd people. It has a very entrepreneurial spirit and workforce, and the growing economy reflects that. It is a very exciting place to do business, and that is tremendous. That has drawn on and created a need for transport connectivity.

The nationally important M11 and M25, which colleagues did not mention, and the A12 and A120 run through the county, and there are major local roads, including the A13, the A27—my hon. Friend the Member for Rochford and Southend East was very eloquent on that topic—the A100 and the A414. Rail connections ensure that the county remains tightly linked to London, with three main lines, the London underground to Upminster and branch lines serving more than 55 stations. It would be wrong not to mention its international gateway of Stansted and Southend, which is growing very rapidly, as my right hon. Friend the Member for Witham mentioned. Harwich provides nationally important sea connections to Holland and Denmark. There are also Tilbury and the new London Gateway port. It is a very exciting place.

My right hon. Friend mentioned Essex’s agricultural strength. It cannot quite match the astonishing range, diversity and depth of my county of Herefordshire, but it is right up there. As I am sure she will agree, the transport network is not just of critical importance to the economic growth and development of Essex, but of national significance. It is an important piece of infrastructure in its wider economic growth and development benefits across the country.

Let me touch on the issues that my right hon. Friend raised in some depth. She is right to focus on the importance of infrastructure. We have recognised that and have invested in the strategic road network, which is critical to delivering that growth. In December 2014 the Government launched the first road investment strategy, which outlined how more than £15 billion is to be invested in our strategic roads between 2015 and 2021. That is the biggest upgrade to strategic roads in a generation, and it will be exceeded in RIS2 from 2025, which is of the scale of £25 billion.

The hon. Member for York Central rightly drew attention to the importance of combating emissions. We have a very strong air quality strategy and have launched an enormous amount of work not just on emissions but on decarbonisation. We have a lot of work about to come out shortly on future mobility, electric vehicles and the like. It includes not just cars, but the full panoply of electric vehicles that are transforming our streets.

It is important to recognise that some road building is vital, and it would be a poor Minister who did not recognise both that and the validity of claims for road building in counties, not merely as an economic and housing enabler, but as an investment in skills, supply chains and businesses, and one that will prepare us for a green future with electric and, in due course, autonomous vehicles.

Rachael Maskell Portrait Rachael Maskell
- Hansard - - - Excerpts

Will the Minister give way?

Jesse Norman Portrait Jesse Norman
- Hansard - - - Excerpts

I have so much to get through in only 10 minutes. I will be delighted to come back to the hon. Lady when I mention her remarks later in my speech, but I will make the important point that we must recognise balance and that, even by her lights of supporting skills and reducing emissions in the longer term, this is actually an enlightened policy. Much of it is about maintenance—autonomous vehicles will require high-quality roads—and that process cannot begin too soon. RIS1 and RIS2 place a very high emphasis on maintenance.

To zero-in on Essex, my right hon. Friend the Member for Witham pointed out that the first road investment strategy includes the widening of the A12 between junction 19 at Chelmsford and junction 25 at Marks Tey, where it currently joins the A120. Delivery of that scheme remains a top priority for my Department, as it is an important strategic route for continued economic prosperity across the region. She also highlighted the delays that have affected the scheme. I will not get into the causation, and she has been very delicate in hinting at causation without specifically stating it. As she knows, there was an initial re-profiling delay, but the fundamental delay was not at all of the Government’s making. Local priorities have changed and we are seeking to accommodate those changes. I will respond to her specific questions—we owe her that as she was kind enough to share them in advance—but I can assure the Chamber that we understand the frustration felt by local communities that works will not begin by March 2020 as was originally proposed. We very much understand that.

We have been considering how best to take forward the A12 scheme in the light of the interaction with the proposed garden community in Marks Tey, as my right hon. Friend touched on. That interdependency was of course raised by the Planning Inspectorate, which examined those housing proposals in June 2018. We believe—as I think she does—that it is important to find the right long-term solution for the local community and to support delivery of the proposed housing at Marks Tey, which would mean the delivery of up to 24,000 much-needed homes.

Highways England is working with partners in Government, local planning authorities and promoters of the new housing development. The next step is for Highways England to consult on the revised route options for the A12 between junctions 24 and 25. The route options will have regard to the housing proposals and—we hope—ensure that the improvements are right for those who use the A12 now and in the future. In the light of the recent delays, Highways England’s latest delivery plan, which was published in July 2018, proposes that works for the A12 begin in the second road investment period, from 2020 to 2025. I wish that were otherwise, but we have had our hand forced somewhat and are scrambling to make the best of the situation.

As I am sure my right hon. Friend will also know, Essex has ambitious plans for housing delivery. The housing White Paper set out the Government’s wider vision to address issues such as unaffordable housing and the provision of proper transport infrastructure, and the Department works closely with the Ministry of Housing, Communities and Local Government in that area. My hon. Friend the Member for Colchester (Will Quince) mentioned housing infrastructure fund bids. They are a crucial part of Essex’s further development, and I say good luck to any hon. Member in the Chamber. Trying to tie in the response to those housing bids with local and strategic transport links is part of the importance of our wider strategic approach, unlocking new housing developments with good transport connections in places where people want to live. Essex is delivering that kind of substantial housing growth in major sites such as Braintree, Chelmsford and Marks Tey, which are critical to meet housing demand. Of course, we recognise the centrality of transport to making them happen.

Well-planned, well-designed and locally-led garden communities can play a vital role in helping to meet this country’s housing needs well into the future. That is why the Government recognise and have invested in the development of capacity towards 23 places across the country as part of our garden communities programme. We are pleased that Essex County Council has decided to further support North Essex Garden Communities by submitting a HIF bid. That has the potential to make an enormous difference, including by releasing funding that ensures that the proposed A12 improvements can accommodate and allow access to the garden communities at Marks Tey, subject to further public consultation.

There has been some concern that the delay to the A12 scheme will compromise the proposal to dual the A120 between Braintree and Marks Tey, as my right hon. Friend the Member for Witham mentioned. Essex County Council is developing that scheme for potential inclusion in the second road investment strategy. I can confirm that, from our perspective, the A12 delay does not affect or compromise consideration of the A120 scheme and that, although we cannot make announcements on the fly, I expect us to make a consolidated set of announcements on this area and others later in the year.

The A120 is recognised as an important route in the wider transport network, but currently the single-carriageway section between Braintree and the A12 near Colchester is regularly a bottleneck, as has been pointed out. The heavy traffic passing through the area is a burden on the local villages and towns. We have supported Essex County Council with a contribution of £4 million to the development work for an affordable and deliverable improvement scheme for the A120. I thank the council and take my hat off to Councillor Kevin Bentley, who is sitting in the Public Gallery, for their excellent work in developing those proposals, including taking them through a non-statutory public consultation on a range of options.

The council’s favoured option for the A120 scheme, which was announced in June 2018, is supported by a strong analytical assessment and has gained the backing of both the public and the local business community. It forms the foundation for consideration of the scheme as a candidate in the competition for the bidding process of our second road investment strategy, which focuses on the period between 2020 and 2025 and has been subject to enormous competition, as colleagues will understand. It is in the nature of politics that everyone regards their own bid as the only one that the Government should ever meet and do so as a priority, and this debate has been no different. I remind colleagues that that can be said for every single Member of this House, and across all parties.

Submissions in favour of the A120 upgrade have been received but there was also support for the schemes that were originally included in RIS1 for development in RIS2, such as the A12 Colchester bypass widening that we discussed and the improvement of the A12-M25 to Chelmsford. They are all being considered for inclusion in RIS2, alongside other proposals from across the country.

Beyond the upgrades and improvement schemes, the Government continue to invest in essential maintenance of the road network. For the period 2018-19, £34.8 million was allocated for Essex road maintenance, with a further figure of almost £700,000 earmarked for pothole action funding in the area. Through the local growth fund, we have also allocated £15 million to the proposed £28.7 million improvements to the A127-A130 Fairglen interchange, which will improve traffic flow, journey times and road safety at an important local junction. Essex County Council is developing the final business case and, if the scheme is approved, work could start in the summer of 2020 and be completed in early 2022.

My right hon. Friend rightly mentioned the lower Thames crossing. If ever there were a scheme that underlined—contrary to the shadow Minister’s suggestions —the genuinely strategic nature of the investment that this country is making, that would be it, with between £4.4 billion and £6.2 billion-worth of investment to increase capacity by 70% for drivers crossing the Thames to the east of London. That investment is orientated absolutely towards the longer term. A Government preoccupied with the short term could not make an investment of that scale or magnitude, or with such a degree of planning. It will almost double the road capacity across the River Thames to the east of London. It is the largest single road investment project in the UK since the M25 was completed more than 30 years ago.

Obviously, there is a need for better road connectivity between Essex and Kent, and we believe that the benefits of the lower Thames crossing are clear. We expect it to have a positive impact on the major road network, contribute to a reduction in the number of vehicles using the Dartford crossing—releasing some of the pressure on it—and assist and support local communities.

The other strategic connection is of course rail. My right hon. Friend mentioned the importance to the Essex economy of the Great Eastern main line and the West Anglia main line. The Government recognise that and—again, contrary to the imputation that we are not being strategic—are pursuing the biggest railway modernisation programme since Victorian times, with investment continuing at record levels. That was announced by the Secretary of State within the final statement of funds available—approximately £47.9 billion will be spent during the period 2019 to 2024, which is a run rate of about £10 billion a year. That is an astonishing level of investment. Greater Anglia is committed, through the franchise, to delivering an entirely new train fleet, which will increase passenger capacity with new high-quality rolling stock. The first of 169 new trains are on course to enter service from the end of May 2019, with the full roll-out expected to be completed by the end of 2020. That £1.4 billion train replacement programme is the most significant investment in new trains for East Anglia.

I would like to take this opportunity to acknowledge the work done by the Great Eastern main line taskforce, chaired now by my right hon. Friend and previously by my hon. Friend the Member for Colchester. It is working to complete the study undertaken by Network Rail, which will help to prioritise future rail enhancements on the main line to meet predicted growth, and updates to a previous route study. My right hon. Friend mentioned a number of other rail schemes. If I may, I will refer those via officials to the Under-Secretary of State for Transport, my hon. Friend the Member for Harrogate and Knaresborough (Andrew Jones), as he can respond in more detail to her questions.

The hon. Member for York Central asked if we would take a more strategic view. I refer her to the work we are doing on intermodal connectivity, the link between transport and housing and the longevity of the investment scheme. Let us not forget that there was no five-year investment programme before 2015. We are now preparing for a second five-year road investment scheme. We are extending that to major roads, and I hope that in due course we will extend it to a five-year investment scheme to support local authorities on local roads. We take these things very seriously. She mentioned light rail, and I am delighted that we announced a consultation on it a few weeks ago. I look forward to her contribution and those of many others. She rightly mentioned active travel, in which we have significantly improved investment since 2010, and I hope that will continue to do that.

On Highways England designated funds, RIS2 is not yet completed so it is too early to say that money has not been spent, but we welcome further bids from local authorities and other interested parties. I am taking steps to increase the availability of designated funds in future.

Rachael Maskell Portrait Rachael Maskell
- Hansard - - - Excerpts

I was referring to RIS1, not RIS2.

Jesse Norman Portrait Jesse Norman
- Hansard - - - Excerpts

Yes; RIS1 has not yet completed so it is premature to suggest that the money has not been used.

My hon. Friend the Member for Rochford and Southend East seductively enticed me towards a tiny change of one letter to another—a wafer-thin change. I am grateful to him for that. He pointed out the importance of widening for consistent speeds, with the impetus on re-trunking with a focus on the airport. I understand that, but the key question is whether either the A127 or the A13 should be trunked. Discussions are happening, or are about to happen, with local councils on that question. I can make no judgment on the merits of the case—that is a matter for official scrutiny and discussion—but I would have some worries about the potential environmental impact. It is important that there be a properly wide-ranging conversation, and we are engaging on that. If my hon. Friend wishes to discuss that further, I would be happy to meet him.

My hon. Friend the Member for Colchester rightly pointed out the importance of HIF bids and the centrality of the new link road between the A133 and the A120, which he has called for. I cannot comment on the road, but his emphasis on road safety is right. I have addressed many of the other issues he raised already. I would be delighted to meet him to talk about the A12. It is important that we adopt a strategic approach when we have such meetings, not least because there has been a lot of discussion with Essex MPs in any case on roads. We can have one-off meetings, but it is helpful to have them in the context of a wider strategic conversation.

My right hon. Friend the Member for Witham asked at what point a Government Minister will give leadership. I have explained that we are still reliant on a series of local decisions. I would be delighted to meet her to discuss the best way to take forward the A12 scheme. Once those housing proposals are settled, we will be in a much better place. Highways England, which works closely with Essex County Council and other district councils in promoting garden communities and developing the realignment options for the A12, is not in a position—neither are we—to commit now to a realignment of the A12. That is potentially a very significant additional cost, but may prove not to be needed in the event that the housing proposals do not go ahead. She is right to maintain the tempo and we will meet her on that, but we are reliant on decisions made locally. I understand that the council has agreed to undertake the work requested by the inspector; that is scheduled to be completed by June 2019, with a public consultation expected in autumn 2019. With luck, decisions on route alignment can be made in a co-ordinated fashion after that.

My right hon. Friend asked what assessment the Government may have made on the impact of the delays on the economy and on other strategic road schemes. We are acutely aware of the economic impact, which is why it is a priority for us to ensure that we get the right solution across all the considerations. The Government have made it clear that we are committed to strategic road schemes such as the A120 dualling and the delays. We also believe that the A12 scheme delays should not affect the prospects for the A120 proposal or compromise its consideration for inclusion in RIS2.

My right hon. Friend asked what has been done to support constituents who live close to the A12 and are unable to sell properties, and the victims of blight. I have massive sympathy for people in that situation—it goes with uncertainty about these decisions. We have not been the cause of that uncertainty. There are established rules about property and compensation for residents affected by major infrastructure proposals. They apply in this case, but I understand the human cost of the delay.

My right hon. Friend asked whether I recognised that the delays to the A12 widening scheme might delay plans to widen the A12 north of junction 25. The scheme to widen the A12 Colchester bypass was included along with the Chelmsford bypass in RIS1. These are being developed as potential candidates for RIS2, along with the proposed A120 scheme and other proposals across the country. We are determined to run a fair process on the merits, but the merits of Essex are considerable, so we hope they will be successful.

I recognise the importance of the county of Essex as a driver of growth and a source of much-needed housing. However, there are also further opportunities for the region to take advantage of Government funding and investment, such as the housing infrastructure fund, and I urge colleagues and Essex County Council to renew their excellent work in developing a robust, evidence-based case for the inclusion of their schemes in the second road investment strategy.