I thank the hon. Member for Harrow West (Mr Thomas) for bringing this issue to the House in such a timely fashion, on the anniversary of the earthquake. I will endeavour to deal with the issues he has raised in the short time available, but first I want to emphasise the success of the relief effort. We have already heard about the tremendous interventions by, for example, Rotary International. The response to the Disasters Emergency Committee was tremendous—DEC raised £85 million. In addition to all that fundraising, through a number of independent organisations, I anticipate that the contribution from British people’s own pockets was in excess of £100 million; we should add to that the £70 million that the Government provided.

In the time available, I will not go into itemised detail about the relief effort that we provided—hon. Members can read the book—but I will draw attention to the effort made specifically on behalf of women. Thousands of dignity packs were provided for women in difficult circumstances, as were safe spaces, psychological advice and counselling.

The one piece of international development effort that the popular press actually approves of is disaster relief for this sort of emergency, but the hon. Gentleman was right to identify the need to build in resilience beforehand. The lesson of the success of the relief effort in Nepal is that it was built on the millions of pounds spent—including by DFID when he was the Minister responsible—in advance over the years. Let us face it: an earthquake in Kathmandu was no surprise to anyone, but the success was based on the fact that we prepositioned supplies and rehearsed volunteers in their distribution. We trained people to be first responders and for search and rescue. We put a blood bank in place. We created the logistical space, equipment and warehousing at the airport, so that seven weeks of cumulative effort could be saved to respond to what happened. People imagine that after an earthquake all of a sudden from nowhere come resources, with highly trained people with sniffer dogs and so on, but clearly there has to be effort and investment in the core costs of organisations throughout the year so they are ready when there is an earthquake. As the hon. Gentleman so rightly said, we need to spend significantly more on building resilience beforehand.

The relief effort was a success and I share the hon. Gentleman’s frustration—frustration evident in the House tonight—and the clear frustration of the people of Nepal that after that initial effort the pace of reconstruction was so slow. Clearly, in a country with difficult terrain, the remoteness of the areas most affected, monsoons, and a long winter and therefore a short building season, there should be a greater sense of urgency than would normally apply. That was not my perception when I visited Nepal last summer. The Government’s attitude was: “No, no, it’s over. Nepal is open for business. Let’s get the tourist trade going again.” I entirely understand that attitude and the importance of reopening the tourist trade, but I felt—it was my prejudice—that the determination to show that Nepal was back in business came at the expense of concentration on the continuing need for humanitarian relief, particularly in outlying areas.

The hon. Gentleman mentioned the constitution. To be fair, we have been pressing for progress on the constitution for months and months and years and years. To an extent, the earthquake galvanised the political class to push on with the constitution. Unfortunately, what happened thereafter—infighting, the problems in the Terai region and the blockade—led to a very substantial slowing up in any kind of relief effort. We in DFID were actually commissioning mules to carry our relief supplies into the mountains because of the fuel problem arising as a consequence of the blockade. The earthquake put some 600,000 people into poverty, but the blockade drove 800,000 people into poverty. The Nepal chamber of commerce estimated that the blockade did more harm to the economy of Nepal than the earthquake.

The hon. Gentleman said that the reconstruction authority, as of 6 January, has now started, well behind what we could have anticipated. It is understaffed, as he says, but nevertheless work has begun. The surveying of needs is supposed to be concluded by the end of this month. Grants have started to be issued. We have issued cash to 100,000 people already. Of the £70 million that we committed, £35 million has been spent and a further £35 million is committed.

We are concentrating on providing technical assistance and training. We have trained 600 masons in earthquake-resistant building techniques and 150 sub-engineers in the same disciplines. We are concentrating on the worst-affected areas and the more remote areas. We are prioritising the need for police stations and healthcare facilities. We are back in business in healthcare, which was always our main effort, restoring the services to 5.6 million people.

Jim Shannon Portrait Jim Shannon
- Hansard - - - Excerpts

Helicopters are one way of restoring contact with remote areas. What helicopter supplies have been given to the Nepalese army to ensure that aid gets to the areas where it is needed?

Desmond Swayne Portrait Mr Swayne
- Hansard - - - Excerpts

DFID commissioned some 2,000 hours of helicopter flights. We provided Chinooks, which were not used. I am very disappointed that that was the case. We never quite got to the bottom of it, but I would rather stand in this House and say that we believed that helicopters were desperately needed and we provided them, even if they were not used, than find myself standing in this House knowing that helicopters were desperately needed and we did not send them. I think the right decision was made. It cost some £3 million, but emergencies demand such commitments.

The reconstruction effort continues. The problem, as I see it, going forward—the hon. Member for Harrow West alluded to it—is that there remain significant political problems in Nepal. Although there has been an easing recently of the problem in the Terai, I do not believe for one moment that it has gone away. The hon. Gentleman rightly referred to the problem of endemic corruption and the problems with governance and bureaucracy. Nepal must transform its investment environment if there is to be any significant prospect of recovery in the long term. It has huge assets in respect of hydropower—

Gareth Thomas Portrait Mr Thomas
- Hansard - - - Excerpts

I welcome what the Minister has said and the support of my hon. Friend the Member for Greenwich and Woolwich (Matthew Pennycook) and of the shadow Chancellor, my hon. Friend the Member for Hayes and Harlington (John McDonnell). May I press the Minister on conversations with other donors about fulfilling their pledges and turning them into commitments, which the Nepalese Reconstruction Authority can use to speed up progress on the ground?

Desmond Swayne Portrait Mr Swayne
- Hansard - - - Excerpts

We are having conversations all the time with other donors, the Office for the Co-ordination of Humanitarian Affairs and the UN agencies. The hon. Gentleman is right that we need to press for a greater sense of urgency, but frustration has been evidenced in the donor community as well. There is a question of our ability to spend while the specifications of the reconstruction authority about how things are to be done have yet to be delivered. That has been part of the problem and I can understand the frustration of the donor community in that respect. I accept the hon. Gentleman’s challenge to do more to galvanise and take a leadership role in driving that forward.

Fiona Bruce Portrait Fiona Bruce
- Hansard - - - Excerpts

Does the Minister agree that now that the constitution has been agreed, it is vital that Nepal presses forward and has elections for the provincial governments and the local councils, so that there are appropriate democratic structures through which reconstruction aid and sustainable provision can be delivered?

Desmond Swayne Portrait Mr Swayne
- Hansard - - - Excerpts

Indeed. That is very important, but equally the focus has to be on reconstruction and on building back better. Principally, the Nepalese must deal with their stifling bureaucracy and the problems that stand in the way of foreign investment. That is the only long-term solution for Nepal. It must deal with the problems of governance and endemic corruption.

I see that time is nearly up. I thank the hon. Member for Harrow West again for concentrating the mind of the House on this important issue, and for having so forensically identified the very problems that are holding up progress in Nepal.