A1: Repairs and Maintenance

(asked on 27th June 2023) - View Source

Question to the Department for Transport:

To ask His Majesty's Government when they expect the pot holes on the A1(M) to have been repaired.


Answered by
Baroness Vere of Norbiton Portrait
Baroness Vere of Norbiton
Parliamentary Secretary (HM Treasury)
This question was answered on 4th July 2023

Safety inspections on the A1(M) are carried out by National Highways on a weekly basis and since January this year they have identified and repaired 16 potholes on the A1(M) between junctions 15 and 16 (Alconbury to Peterborough). There are no further potholes identified or awaiting repair. A maintenance scheme to resurface and address surface defects on the northbound carriageway of this stretch of the road is planned for September/October 2023.

In the same period, National Highways has also identified over 340 potholes on the A1(M) in both directions between junctions 6 and 10. To date, they have repaired 323 and plan to carry out minor surface repairs to address the remaining 19 potholes over the next two months.

Reticulating Splines