Question to the Department for Energy Security & Net Zero:
To ask His Majesty's Government what assessment they have made of the decision in the Clean Power 2030 Action Plan to allow only 700 megawatts of additional Scottish onshore wind capacity to connect to the grid between 2031 and 2035.
The regional capacity breakdowns for transmission connected technologies required for 2035 as set out in the Clean Power 2030 Action Plan, connections reform annex, have been developed using ranges from the NESO Future Energy Scenarios 2024 net zero aligned scenarios.
The ‘Future Energy Scenarios: Pathways to Net Zero 2025’ document outlines NESO’s methodology in full detail.