Question to the Department for Energy Security & Net Zero:
To ask His Majesty's Government what steps they are taking to reconfigure the electricity grid network in the UK to minimise the need to constrain electricity generation by wind turbines to prevent overload.
Government is implementing a strategic network planning approach led by the National Energy System Operator (NESO). This includes two previous published plans, as well as the upcoming Centralised Strategic Network Plan (CSNP), to be published by NESO in 2027. These strategic network plans take a holistic approach, with economic cost - including constraints costs - being one of the key criteria in determining the recommended transmission network design.