To ask the Secretary of State for Energy and Climate Change, what the cost of maintaining Black Start plans for coal-fired power stations has been to date.
National Grid is responsible for maintaining a Black Start capability for the Great Britain national electricity transmission system. This includes ensuring that all plans are up to date and fit for purpose. The costs for National Grid to administrate the Black Start capability are included in its operating expenditure under the transmission price control managed by Ofgem (currently RIIO-T1).