Fracking: Landfill

(asked on 26th April 2019) - View Source

Question to the Department for Environment, Food and Rural Affairs:

To ask the Secretary of State for Environment, Food and Rural Affairs, how many landfill sites in the UK are permitted to dispose of (a) waste water sludge, (b) sand and (c) filter cake produced from hydraulic fracturing operations.


Answered by
Baroness Coffey Portrait
Baroness Coffey
This question was answered on 3rd May 2019

Any sand or sludge resulting from hydraulic fracturing operations will form in the filter cake that is produced as part of the waste water treatment process. This solid waste needs to be tested to determine if it is hazardous or non-hazardous before it can be disposed of at a landfill site. Depending on the results, the filter cake can be sent to any landfill site that has the necessary permits in place. There are currently 21 hazardous waste landfill sites and 245 non-hazardous waste landfill sites permitted in England.

Reticulating Splines