Broadband: Housing

(asked on 18th April 2024) - View Source

Question to the Department for Science, Innovation & Technology:

To ask the Secretary of State for Science, Innovation and Technology, how many multi-dwelling units are excluded from the requirement that new build properties should have capability to host gigabit-capable broadband infrastructure.


Answered by
Julia Lopez Portrait
Julia Lopez
Shadow Secretary of State for Culture, Media and Sport
This question was answered on 23rd April 2024

The Building etc. (Amendment) (England) (No. 2) Regulations 2022 require developers of new build homes, including multi-dwelling units (MDUs), in England to install the gigabit-ready physical infrastructure necessary for gigabit-capable connections. Additionally, and subject to a £2,000 cost cap per premises, developers need to install a gigabit-capable connection. Where a developer is unable to secure a gigabit-capable connection within the cost cap, a next-best technology connection that is available within the same cost cap must be installed. This means first a superfast connection, and if this is not possible, at minimum a broadband connection.

The requirements do not apply to properties undergoing a material change of use, such as converted properties, which may form some of the MDU housing stock. This issue was considered during the Technical Consultation which ran from 21 December 2012 to 28 February 2022. However, there was a lack of evidence from the consultation responses to suggest that these types of properties should be in scope of the regulations. We do not have an up-to-date assessment of how many MDUs this currently applies to.