To ask the Secretary of State for Energy Security and Net Zero, what steps his Department is taking to construct grid connections for Sizewell C.


Answered by
Michael Shanks Portrait
Michael Shanks
Parliamentary Under Secretary of State (Department for Energy Security and Net Zero)
This question was answered on 17th December 2024

The policy position outlined in the National Energy System Operator (“NESO”) open letter [https://www.neso.energy/document/349496/download] (published 10th December 2024) indicates that, given Sizewell C received planning consent in July 2022, the existing arrangements for Sizewell C grid connection should be eligible to be grandfathered, subject to NESO’s proposals for reforming the connections process being approved by Ofgem and taking effect.

National Grid Electricity Transmission has also confirmed that Sizewell C will retain the same enabling works identified in previous connection agreements (2007-2009).