Question to the Department for Energy Security & Net Zero:
To ask the Secretary of State for Energy Security and Net Zero, with reference to the document entitled Pathway to 2030 Holistic Network Design, whether he has had discussions with the National Grid on the proposal for a new network in Wales; and for what reason the proposed network route has changed from offshore route to onshore.
The Holistic Network Design was produced independently by National Grid ESO as a key output of the government led Offshore Transmission Network Review. This process has identified a new network need between North and South Wales (PNSC). Detailed design work by the relevant Transmission Owner is ongoing and will consider the potential for both onshore and offshore options.