Railways: Devon

(asked on 14th October 2015) - View Source

Question to the Department for Transport:

To ask the Secretary of State for Transport, what geological assessment his Department has made to ensure the stability of (a) the sea wall at Dawlish, (b) the cliff at Teignmouth and (c) the line between Newton Abbott and Plymouth.


Answered by
 Portrait
Claire Perry
This question was answered on 22nd October 2015

Network Rail is carrying out a further study to look at options to increase the long term geo-environmental resilience of the existing main line from Exeter to Newton Abbot. The study looks at the coastal and sea wall elements and the cliffs. It is due to be fully complete in April 2016 with an options assessment report available by the end of 2015. There has been no geological assessment of the rail route from Newton Abbot to Plymouth.