Northern Rail Services: Greater Manchester

William Wragg Excerpts
Wednesday 6th June 2018

(6 years, 6 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

William Wragg Portrait Mr William Wragg (Hazel Grove) (Con)
- Hansard - -

It is a pleasure to follow the hon. Member for Bolton North East (Sir David Crausby), who I congratulate on securing the debate. It is also a pleasure to serve under your chairmanship, Mr Howarth. However, the residents of Stockport who I represent have been experiencing anything but pleasure from the introduction of Northern rail’s new and chaotic timetable, which came into force a couple of weeks ago.

There are many unacceptable elements to Northern rail’s timetable, but the most pressing for me is the glaring gap that has been created at peak morning rush hour, owing to the removal of the two most popular commuter services, the 7.50 am and the 8.01 am from Hazel Grove to Manchester Piccadilly, which also called at Woodsmoor and Davenport stations. That has meant that all three well-used commuter stations now have a 45-minute gap in trains to Manchester from just after half-past seven until around 8.20 am, and then no services again until 9 am.

That has left hundreds of commuters unable to get to Manchester on time for work, forced to arrive either much too early or too late. It has disrupted pupils’ ability to get to school, as well as having an effect on parents who have to co-ordinate dropping off their children in the morning, sometimes at multiple schools and nurseries. When passengers can get on a train, they are faced with huge overcrowding, with many unable to get seats, and some trains now have two cars rather than four. In one recent case, overcrowding led to a passenger needing medical attention after fainting in the cramped carriages. It is also forcing many commuters to abandon the rail network entirely and to travel by car instead, adding further to the already all-too-congested roads, including the A6.

It is not just the morning rush-hour services that are affected; Sunday evening services out of Manchester have also been cut or brought forward. For example, the last train back from Manchester to Romiley and other nearby stations is now at 9.45 pm, meaning that people who want to spend the evening in Manchester have to cut their time there short.

These timetable changes are having a damaging and hurtful impact on both the family and professional lives of my constituents. I have not even attempted to calculate the economic cost of the hours of lost productivity. Sadly, I hear consistently from residents about their impression that the rail industry as a whole does not care about passengers. There is extreme anger. The two words that have appeared most often in the dozens of letters and emails that I have had on this subject are “ridiculous” and “unacceptable”, and I must agree entirely with those descriptions. The sad fact is that this timetabling nightmare is overshadowing what should be welcome news of upgrades to infrastructure, more trains overall and new or refurbished rolling stock.

During my Adjournment debate on the last day before recess, I highlighted in detail how the issue affected my own constituency. However, it has become clear in the days that followed, as the stories shared by hon. Members across the House illustrate, that this is not just a case of a few hiccups of implementation on a few lines or services, but a systemic and structural shortcoming of the whole Northern rail timetable.

Much of the blame for this bungle falls at the feet of Network Rail. Its catalogue of delays relating to the electrification project from Manchester to Preston via Bolton, which the hon. Member for Bolton North East alluded to in his speech and which is now apparently two years overdue, has meant that train operators faced uncertainty over the state of the available infrastructure. That had a knock-on effect on their ability to plan an effective timetable. Also, they are unable to use the electric engines on that line and so are reliant on old diesel engines to make up for the shortage of rolling stock. That in turn caused Northern rail to put its timetable bids in late, by which time many of its required platform slots had been taken up by other operators. It has been a perfect storm of delayed rail upgrades leading to delayed timetable planning, leading to delayed or even missing trains.

While I have had some positive dealings with regional representatives of Network Rail, this whole debacle is a symptom of Network Rail’s aloofness, unaccountability and, at times, sheer arrogance in failing to communicate with either train operators or passengers, let alone Members of Parliament. When its chief executive Mark Carne, who does not readily reply to my letters, leaves later this year, I am sure he will not be missed by passengers—and certainly not by me.

However, while it may be justifiable to heap a large portion of the blame for the delays and their consequences on Network Rail, relevant questions must be asked of others, including the Government, given their ultimate control of Network Rail. What were the reasons for the further delay to the Bolton electrification project, which has caused this mess-up of the timetabling process? What assurance can be given that the work will not be subject to further delay? When the delays on the Bolton line upgrades came to light, why did Northern rail say it would still be able to manage, and why did it not flag up the depth of the problems that that would cause? Did the Department for Transport not know that the infrastructure delays would scupper the timetable? Why did rail experts advise Transport Ministers that it would all be fine? What searching questions did Ministers ask to verify what they were being told?

What passengers really want to know is what is being done to get us out of this mess. On Monday, my right hon. Friend the Secretary of State told me in the Chamber that he would bang heads together to sort out the 45-minute gap in morning peak-time services that is affecting my constituents so badly. Yesterday evening I met with him again to reiterate those concerns. Furthermore, this morning I met with both Network Rail and Northern rail, who gave assurances that the Bolton electrification project would definitely be completed this year and that that would enable Northern to plug the unacceptable gaps in the current timetable. I will have to hold somebody to account for that statement.

Questions still remain for passengers faced with a whole summer of disruption. Will Transport for the North, the regional transport body, conduct a formal assessment as to whether Northern rail is in breach of its performance targets as set out in its franchise agreements? If it is, what action will be taken? Transport for the North is currently co-running the rail franchise in the north, but is not using the full extent of its powers. Will the Department for Transport ensure that it uses those powers? Finally, do passengers really have to wait for the six-month timetable review, or will the Minister do all he can to get things moving more speedily? I look forward to hearing from my hon. Friend the Minister. He is in an unenviable position, but I am sure he will appreciate the anger of my constituents and those of hon. Members across the House, and do his very best by them.