HS2: Phase 2b Route (Manchester and Leeds) Debate

Full Debate: Read Full Debate
Department: Department for Transport

HS2: Phase 2b Route (Manchester and Leeds)

William Cash Excerpts
Wednesday 6th September 2017

(6 years, 8 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Antoinette Sandbach Portrait Antoinette Sandbach (Eddisbury) (Con)
- Hansard - - - Excerpts

I beg to move,

That this House has considered the route of Phase 2b of HS2 to Manchester and Leeds.

It is a pleasure to serve under your chairmanship, Mr McCabe. I am pleased to have secured this debate on a matter of immense importance to me and my constituents. If phase 2b is to go ahead, it is vital that it be done properly. At such a high cost to the taxpayer—£55.7 billion—and with budgets having risen significantly since High Speed 2 was first announced, the route must be designed so as to avoid unnecessary cost to the taxpayer and with minimum disruption to the communities that it affects.

The proposed route of HS2 through my constituency of Eddisbury will not only cause significant environmental damage and noise disruption to many areas, but come at a particularly high cost to the taxpayer because of the unique geotechnical challenges of routing HS2 through an area of current and historical salt mining and across land with a long history of significant subsidence risk. HS2’s route through Eddisbury must be looked at again, and the serious and valid concerns raised by independent experts, academics and local people need to be taken into account to find a route that works better both for the local communities and for the taxpayer.

In addition, HS2 must improve the quality of engagement with communities, who feel that their voices are not being heard. That is a long-standing complaint and has been raised by my right hon. Friend the Member for Chesham and Amersham (Mrs Gillan). It is disappointing that those problems are still arising.

Moving on to the detail of the route, I wish to place on record my serious concerns and those of my constituents about the relocation of the western leg rolling stock depot from an industrial site—a former colliery—in Golborne, outside my constituency, to a greenfield site in Wimboldsley, in my constituency. The decision to site the depot in that quiet, rural area has caused a great deal of anxiety to local residents. The impacts on Wimboldsley appear to be greater than those at the Golborne site. I will add that the relocation was sprung on me and my constituents with no warning. That is no way to gain public trust and support for the project.

William Cash Portrait Sir William Cash (Stone) (Con)
- Hansard - -

I very much endorse the thrust of what my hon. Friend is saying. I, too, am very much opposed to HS2 in principle and will be voting against it. On the specific points that she is raising, there are important questions about consultation; she is right about that. My constituents have similar problems, and we shall be fighting this all the way down the line, with petitions and so on.

Antoinette Sandbach Portrait Antoinette Sandbach
- Hansard - - - Excerpts

I am very grateful for that point, which my hon. Friend makes well. Having long been involved in the process, he knows exactly how frustrating it is to deal with HS2 and the lack of engagement that is apparent in many of the meetings that are held.

At a proposed length of 4 km, the depot in Wimboldsley will be a significant visual and environmental blight on that tranquil rural area. It will be in close proximity to Wimboldsley wood and cause significant disruption to prime dairy farming land. It will impact on six grade II listed buildings, as opposed to one at the Golborne site; requires five demolitions, compared with one at the Golborne site; and an obtrusive and unsightly tunnel-type structure is proposed to cross the Shropshire Union canal. That is at a spot popular for its tranquillity that is well used by locals and tourists alike.