Theresa Villiers
Main Page: Theresa Villiers (Conservative - Chipping Barnet)Department Debates - View all Theresa Villiers's debates with the Department for Transport
(14 years ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
In the brief time that I have available, I will try to run through the points made by right hon. and hon. Members, and I will write to them about any points that time prevents me from covering now.
I am very grateful to have support for high-speed rail from across the House, across parties and across the country. That support is very welcome. There was a particularly vocal presence in the debate today from Yorkshire, which was particularly welcome.
However, we recognise that it is vitally important to think with great care about the local environmental impact of the project. Of course, we had some very comprehensive accounts of the potential impact, first from my hon. Friend the Member for Wycombe (Steve Baker) and then from my hon. Friend the Member for North Warwickshire (Dan Byles). It is important that they are here in Westminster Hall and able to put their constituents’ point of view.
I strongly believe that careful mitigation measures can eliminate the most intrusive local impacts of high-speed rail. Modern engineering techniques give us an expanding range of ways to use sensitive design to make transport infrastructure easier to live with and less intrusive; a number of Members have referred to the example of High Speed 1, where that mitigation work has been done with some success in many areas.
I believe that it is possible to find a solution that is balanced and fair; that generates the significant economic benefits of high-speed rail for the country as a whole, and that is fair to the local communities that are directly affected by whatever line of route is ultimately chosen. Hopefully, this debate will take us closer to finding a solution and choosing that route.
We intend the consultation to be inclusive, wide-ranging and comprehensive, providing a range of opportunities for Members and their constituents to go through these kinds of concerns about the impact on landscapes and communities. Our consultation is designed to run for about five months, which is longer than the statutory minimum. We take this process very seriously, because we know the gravity of the concern that is felt in some communities.
The business case for high-speed rail was discussed by a number of Members. We are absolutely confident about the very significant benefits that a line from London to Birmingham would generate and we believe that those economic benefits are even more significant when they are linked to a “Y”-shaped high-speed rail network that connects the capital with Birmingham, Manchester and Leeds.
I welcome the comments of my hon. Friends the Members for Warrington South (David Mowat) and for Calder Valley (Craig Whittaker) about the importance of using transport infrastructure to try to remedy imbalances between economic prosperity in different parts of the country. There is strong local support in much of the country for high-speed rail.
In answer to the questions from a number of Members about Scotland, as the hon. Member for Denton and Reddish (Andrew Gwynne)—the shadow Rail Minister—has already pointed out, the “Y”-shaped network to deliver high-speed rail to Manchester and Leeds could enable us to deliver journey times to London from Edinburgh and Glasgow of about three and a half hours. There is also the issue of promoting the air-to-rail switch, which is so important to the hon. Member for Cheltenham (Martin Horwood). In due course, we certainly want to see a genuinely national network built, and that is why we are in regular dialogue with the Scottish Government. We are happy to work with them on establishing how we bring that network about in the future.
A number of Members have talked about the carbon impact of high-speed rail. I believe that high-speed rail can play an important role in our plans to develop a low-carbon economy, particularly by promoting the air-to-rail switch that a number of Members referred to. Even with our current energy generation mix, high-speed rail is a much lower-carbon option than flying.
My hon. Friend the Member for Wycombe argued that the Government had overstated the expected increase in demand. He and a number of other Members sought to challenge the business case. However, there is no doubt that the benefits generated by the extension of high-speed rail to Birmingham will exceed the cost of building the line.
Furthermore, it is clear that there is already a significant crowding problem on our railways. The simple fact is that we need this new railway. Important parts of our rail network are already suffering from serious overcrowding problems. As my hon. Friend the Member for Milton Keynes South (Iain Stewart) mentioned, one only needs to go to Euston on a Friday night to see how popular the railways have become. There is simply no realistic alternative that would give us the level of benefit that high-speed rail will generate.
Does my right hon. Friend the Minister accept, however, that greater consideration should be given to using an existing transport corridor rather than tearing through great swathes of English countryside?
It is always the case that, when efforts are made to construct these major transport projects, there are advantages to using existing transport corridors. However, sometimes using those existing corridors is simply not possible. Nevertheless, the Secretary of State for Transport asked High Speed 2 to look again at the route that it had proposed and at the environmental impact of that route. In a very short time, we will publish a package for consultation that will take on board a number of the concerns that have already been raised with the Government and with HS 2, to mitigate the environmental impact of the project.
I want to go back to the points that were made about using upgrades to the conventional rail network to relieve the capacity problem. It is simply not possible to relieve the capacity problem without a new line. Without delivering a further significant uplift in rail capacity, some of our key transport corridors will become even more overcrowded in the years to come. I strongly believe that high-speed rail is the best way to deliver that new capacity, not least because it would free up space on existing networks for more commuter, regional and freight services. My hon. Friend the Member for Rugby (Mark Pawsey) mentioned that issue and I think that there is potential for his constituents to benefit from the extra space on the west coast main line that will be released by high-speed rail. Dramatically improving connectivity between a number of our most important cities has the potential to change the economic geography of the country.
As for the environmental impact, I recognise that our plans for high-speed rail are already having an impact on some communities, even in advance of the final decisions on the project. That is why we have launched an exceptional hardship scheme, to assist those with an urgent need to sell their properties and move home.
The Secretary of State has made it clear that, as and when any final route is chosen, we will put measures in place to address blight, and those measures will go well beyond the requirements of statute. I say that in response to a number of points that were made about the exceptional hardship scheme. My hon. Friend the Member for North Warwickshire had some concerns about how the scheme was working. I was not aware of those difficulties, so if he wants to write to me about the specific issues I will be happy to look into them.
Earlier this year, the Secretary of State visited the line of route that has been recommended by HS 2 Ltd. He acknowledges the vital importance of designing a new high-speed rail line in a way that will reduce local impact where possible and that will take on board the types of points that we have heard this morning.
We fully recognise the need to balance the benefits of the high-speed rail project with the local impact on landscape and communities. In the summer, the Secretary of State instructed HS 2 to consider how best to improve its recommended route 3 to reduce any negative social and environmental impacts. An initial report has already been published that identifies a number of ways to reduce problems on the northern part of HS 2’s preferred route. That work is continuing in relation to a number of other areas of sensitivity—
Order. I am afraid that we have run out of time for this debate. We now move on to the next debate.