All 2 Debates between Tessa Munt and Liam Fox

Electricity Transmission (North Somerset)

Debate between Tessa Munt and Liam Fox
Thursday 22nd March 2012

(12 years, 1 month ago)

Commons Chamber
Read Full debate Read Hansard Text
Liam Fox Portrait Dr Liam Fox (North Somerset) (Con)
- Hansard - - - Excerpts

Those who read the title of this debate might be tempted to think that it deals with a localised issue of interest only in North Somerset or the county of Somerset. That would be a major mistake. The issues at stake in this project are likely to be replicated across many other parts of the country, and the principles involved are universally applicable.

At the moment, there are some 22,000 high-voltage pylons carrying 7,000 km of overhead lines across England and Wales. National Grid, the monopoly provider of transmission infrastructure, is planning to build nearly 480 km of new overhead power lines at a cost of some £14 billion. That became an issue in our part of the west country in the autumn of 2009, when National Grid began what it termed a consultation on the installation of a new feed line with 400 kV of electricity to connect the proposed new Hinkley C nuclear power station to the national supply network at Avonmouth, a distance of some 57 km. The most direct route between the two points lies across a body of water, yet the debate centred entirely around a land route that would involve overhead transmission and new pylons. The concerns of local residents about the new 400 kV lines—the current lines carry about 132 kV—were exacerbated when they discovered that the new pylons would be around 150 feet high, and very much bulkier in design, thereby creating greater environmental impact. I will return to the question “When is a consultation not a consultation?” later.

Our experience has been mirrored by colleagues in other parts of the country, notably in Suffolk, and I would like to thank them publicly for the support that they have given us throughout our campaign. One of the biggest problems that we have faced has been the perceived inconsistency in National Grid’s arguments and in the figures it has provided. At a packed meeting in Nailsea in my constituency before the last general election, residents were first told that to lay the cables under the sea was not technically feasible. Then, when they challenged National Grid with the fact that it already owned three undersea cables, they were told that it would be too expensive.

We now have a further complication, in the welcome announcement by the Government of the south-west as the first marine energy park, which will utilise—guess what—undersea cabling. We are still unclear as to why subsea links of similar length should be suitable for Europe, for the New York-New Jersey link and for the Scotland-Wirral link, but not for us. National Grid and Scottish Power Transmission even put out a press release stating that

“the companies are working together to deliver a major project to build a 400 km high voltage circuit which will run predominantly under the sea from Scotland to England. The new circuit will enable the transfer of large volumes of energy from Scotland directly to England and Wales through subsea cables, bypassing the constraints of the existing transmission system.”

Tessa Munt Portrait Tessa Munt (Wells) (LD)
- Hansard - -

Is it not also the case that Steve Holliday, the chief executive of the National Grid, said in June 2009 that putting cables under the sea was a “no brainer”?

--- Later in debate ---
Liam Fox Portrait Dr Fox
- Hansard - - - Excerpts

That is indeed correct, but one of the problems we have had, as I mentioned, is that what we are told one day can be diametrically opposed to what we are told the next week. That has resulted in the local population’s loss of confidence in their dealings with National Grid.

There have been huge variations in the costs and estimates of alternatives. National Grid originally estimated that undergrounding power lines would cost between 10 and 20 times more than overhead lines. That does not fit with the evidence produced by groups such as the Campaign for the Protection of Rural England or even with National Grid’s own experience in London or Oxfordshire.

Some clarity was achieved earlier this year with the report from the Institution of Engineering and Technology and Parsons Brinckerhoff. That was a useful contribution to the public debate—well constructed, informative and indicative of the approach that National Grid should have taken from the outset if a meaningful public debate were genuinely sought. It provides better costings for the alternative technologies, and shows that the price differentials are much less than the public were originally led to believe.

However, the report’s remit relates purely to the tightly defined engineering costs. It does not take into account any analysis of the aesthetic, human or environmental impacts of the proposed new overhead lines. It scarcely covers the AC subsea option and does not give an equivalent level of detail for gas-insulated transmission lines as for overhead lines and underground cables. It does not sufficiently take into account whole life costs, or the public’s willingness to pay for undergrounding new and existing electricity transmission lines.

National Grid commissioned Brunswick to look into the public’s willingness to pay for these changes, and the research revealed widespread public ignorance about the percentage of an electricity bill that is attributable to transmission. Most consumers thought that about 10% of their bills as opposed to the actual figure of about 4% related to transmission. Ofgem commissioned further research from London Economics to look at the same data, and we currently await the results of research commissioned by National Grid from Accent.

Throughout the process, National Grid has told us that it is constrained in the actions it can take by Ofgem. My first question to the Minister, then, is: what representations, if any, has National Grid made to the Government, outlining concerns about these restrictions; and what freedoms from those constraints have been requested? What can the Government do to free National Grid from the perceived and well used excuse that it must use the “least-cost option”?

Meanwhile, back in North Somerset, many of the changes originally ruled out as impossible magically became part of the agenda for discussion, following public pressure. The 50-metre pylons, which caused such outrage, might be reduced to the current height by altering the design, although we have subsequently learned that that is limited by the ability of the new pylons to allow transmission lines to bend through more than 3°. We have been told that the 18 lines can be reduced to 12, and that the existing Western Power distribution—the pylons we currently have—might be removed to make way for the new pylons, rather than running in parallel as we were originally told had to be the case.

Other concessions, such as the burying of cables for environmentally sensitive areas and places of greater housing density, have been brought forward. That is particularly important in relation to housing in the west of Nailsea, where those who bought housing close to the existing 132 kV lines might find themselves with housing blight and unknown health implications. I wonder how many National Grid executives or shareholders would choose to have their homes, or send their children to school, under the new 400 kV cables.

Let me return to the question of when a consultation is not a consultation. From the outset, it was the belief of residents in my constituency—particularly in Nailsea, Backwell, Yatton and the surrounding villages—that the alternatives represented were not real alternatives at all. We were offered a Hobson’s choice: we could either accept a transmission line that kept close to the current one, running around the western border of the town of Nailsea, or have another line that would totally destroy a nearby valley and produce widespread planning blight. To the great credit of the local community, nobody bought into the divide-and-rule tactics. To us, a consultation is not about the means of execution, but about whether we wish to be executed or not.

In this particular case, how do the Government define a consultation? Surely, all the aspects of all the schemes ought to be considered—their costs, advantages and drawbacks, whole-life characteristics, environmental impacts, potential health impacts and social costs, not least housing blight. What weight will ultimately be given to the consultation and the views of those affected? If 90% objected to these proposals, would they go ahead in any case? If so, why bother? If not, what level of public disquiet would be required to produce a change of policy? Under the proposed changes to planning law, how will the population be able to be satisfied that its voice has been heard in policy formulation? How can we be guaranteed transparency?

Tessa Munt Portrait Tessa Munt
- Hansard - -

I wish to place on record that both Somerset county council and Sedgemoor district council believe that the consultation was deeply inadequate. There were more than 4,000 responses to the consultation from members of the local community—constituents of mine and of the right hon. Gentleman—which is far more responses than National Grid has received in any past consultation.

Liam Fox Portrait Dr Fox
- Hansard - - - Excerpts

The hon. Lady makes an important point. This issue is not simply about the consultation as it affects her constituency or mine: many people outside North Somerset and Somerset county will be wondering what precedent the decision on the Hinkley C transmission will set for future changes involving high-voltage lines elsewhere in the country. Many will be concerned that their options may be constrained, and that they may be railroaded into the wrong outcome on the wrong assumptions.

I shall now turn to the issue of the future of Hinkley C and where it fits into our broader energy policy. I have always been a supporter of nuclear energy on the basis that it makes a fundamental contribution to the nation’s energy security and guarantees a means of keeping the lights on if, for whatever reason, our imports of fossil fuels are interrupted. On balance, I remain very much of that view, but in light of the growing evidence of the abundance of natural gas worldwide and the massive potential for shale gas production, possibly including here in the United Kingdom, it is reasonable for us to pause and re-examine some of our energy policy assumptions. If the cost predictions we have made turn out to be wrong, and energy prices in the rest of the decade are lower than we anticipated, might there not be an unprecedented opportunity to overhaul our electricity transmission network without a significant impact on consumer prices? Indeed, consumers need to know what impact the options that are available will have on their electricity bills, so that they can make an informed decision in this debate. In other countries, notably Norway and Denmark, the decision has already been taken that any future transmission lines should be buried underground, and the development of new technology, such as gas-insulated transmission lines, offers a whole range of new possibilities.

On the Hinkley C project, we have already seen major changes to the original time scales. Initially we were told that the transmission lines had to be up and ready by 2015 for Hinkley’s operation in 2016. That has now slipped to the lines being ready in 2019 for Hinkley going live in 2021, assuming all is smooth in the Hinkley build and commissioning processes. The bottom line is that we may have more time than we thought, so why do we not use this time to pause for thought, examine all the evidence, consider all the possibilities and get it right?

Let me end by paying tribute to all those in Somerset, Suffolk and elsewhere who have campaigned with such tenacity and vision on this issue. In particular, campaign groups in Nailsea, Yatton, Backwell and Wraxall have shown extraordinary community solidarity against divide-and-rule tactics, using reason and persistence as their primary weapons. May I single out Wraxall and Failand parish council, Chris Ambrose, Hugh Pratt, Fiona Erleigh and Sue Turner, along with their respective groups, for the sterling service they have given to the community?

This coalition Government have put quality of life issues, a greener environmental agenda and long-term policy considerations at the forefront of policy making. A basic issue such as how we transmit our electricity and the considerations we give to our environment, to the well-being of future generations, to the implications for our tourist industry, the health of our people and our ability to welcome new and liberating technology can paint a vivid canvas of who we are and our ambitions for our country. The decisions we make today will have an impact for a generation or more. Technology has changed, public attitudes have changed and our priorities, not least the value we place on the physical environment around us, have changed. We now have an opportunity for public policy to change, and we should grasp that opportunity with relish.

Oral Answers to Questions

Debate between Tessa Munt and Liam Fox
Monday 31st January 2011

(13 years, 3 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Liam Fox Portrait Dr Fox
- Hansard - - - Excerpts

There are two imperatives. The first is to ensure that we have the successor programme. The second is to ensure that we do it within the financial constraints that the Government are forced to take on board, given the economic position that we inherited. Through the value-for-money study, as the hon. Gentleman well knows, we looked to see how we could extend the life of the current programme, if possible, to minimise the expenditure in early years. That is helpful not only in reducing the deficit in the period set out by the Government, but in ensuring the success of the programme itself.

Tessa Munt Portrait Tessa Munt (Wells) (LD)
- Hansard - -

It would appear from the answers to freedom of information requests that the steel, the computer systems and the combat systems, among other things, for the first submarine have been ordered and will have been paid for. It also appears that the three reactors for the first three submarines will have been ordered and paid for before MPs can scrutinise the main gate business case. What will remain unspent for the first submarines? Will we be so financially committed that the whole main gate decision is made irrelevant?

Liam Fox Portrait Dr Fox
- Hansard - - - Excerpts

Whatever amount of money is spent on the lead items, technically it is up to any Parliament at any time to determine whether any programme can or cannot go ahead. It is clear from the coalition agreement that we are committed to maintaining a continuous at-sea minimum credible nuclear deterrent that will protect this country from nuclear blackmail and ensure that we make our role apparent in reductions in total nuclear armaments.