National Grid (Montgomeryshire) Debate

Full Debate: Read Full Debate

National Grid (Montgomeryshire)

Tessa Munt Excerpts
Wednesday 4th February 2015

(9 years, 10 months ago)

Westminster Hall
Read Full debate Read Hansard Text

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Amber Rudd Portrait Amber Rudd
- Hansard - - - Excerpts

It is reassuring to hear of the hon. Gentleman’s experience in Cumbria, although that has clearly not been the experience of my hon. Friend the Member for Montgomeryshire. I will suggest some possible remedies as I make progress.

Tessa Munt Portrait Tessa Munt (Wells) (LD)
- Hansard - -

I have every sympathy with the hon. Member for Montgomeryshire (Glyn Davies), because of my constituents. Eight thousand people replied to a consultation, decrying what National Grid proposed, but it has been utterly high-handed in dismissing such concerns, and completely ignored the possibility of the power connections and the line being put underground or undersea. Technology develops, but National Grid has ignored it completely, much to the distress of my constituents. There are probably many similarities with the situation described by the hon. Gentleman.

Amber Rudd Portrait Amber Rudd
- Hansard - - - Excerpts

I am not familiar with the particular example given by the hon. Lady, but I hope that the Planning Inspectorate would review the consultation process as part of its consideration. That is part of the inspectorate’s legal obligation.

I was discussing the need to upgrade infrastructure to accommodate renewables, which in part explains why National Grid is going ahead in Montgomeryshire and why the hon. Lady had her experience. Developers of new generation, however, need the reassurance that the network will be delivered in line with their project time scales, so that they are able to generate electricity once those projects are completed. We should recognise that such generation projects are substantial long-term investments, and timely network delivery is crucial to their viability.

Before I address National Grid’s activity in Montgomeryshire, it might be helpful to explain the wider approach to deciding on new network infrastructure. Under the current regulatory framework, it is for network companies, such as National Grid, to submit proposals for new network infrastructure to the industry regulator, Ofgem, and the relevant planning authorities. My hon. Friend the Member for Montgomeryshire made some interesting points about Ofgem’s potential concerns, and referred specifically to conversations with its chief executive. I assure him that I will follow up on this debate by writing to Mr Nolan to establish whether the formal position has moved, and will come back to my hon. Friend on that. Under the current set-up, proposals are based on a well-justified need case—say, the connection of new generation, or the maintenance of a safe and secure network—but it is important to us that Ofgem feels confident of the proposals.

The network companies also propose routes and types of infrastructure. In doing so they are required to make a balanced assessment of the benefits of reducing any adverse environmental and other impacts of new infrastructure against the costs and technical challenges of doing so, following extensive consultation with stakeholders. The requirements are set out in their licence obligations under the Electricity Act 1989: they must develop economic and efficient networks, and have regard to the preservation of amenity and the mitigation of the effects that their activities could have on the natural beauty of the countryside. The 1989 Act also stipulates that network companies must provide connection offers when requested to do so by developers.

--- Later in debate ---
Amber Rudd Portrait Amber Rudd
- Hansard - - - Excerpts

Where there are particular examples, I urge hon. Members to write to me, and I will write to Ofgem. It sounds to me like there might be particular examples; that does not necessarily mean that the whole system is flawed, but it might mean that particular examples of insensitivity require some sort of redress. I will happily look into that for the hon. Gentleman.

Tessa Munt Portrait Tessa Munt
- Hansard - -

I am grateful to the Minister for her generosity in giving way. Will she write to me on two specific points? First, there is the business of a “willingness to pay” study, which I believe has been carried out in Essex or Suffolk but not in other areas. That study has proven that, given the chance, people want new pylons and other infrastructure to be put underground. That should be done for existing pylons as well.

Secondly, the Government’s legislation says that there should be a social and environmental impact assessment. At no point have I or other Members been given any clarity on exactly what that entails. If the Minister could write to me to explain how that is implemented, that would be most kind.

Amber Rudd Portrait Amber Rudd
- Hansard - - - Excerpts

I would be delighted to write to the hon. Lady and will take up the two points that she has raised. She is of course correct that it is possible to bury the cables; the cost is approximately 10 times as much, but that is obviously part of the consideration.

The regulatory approach to which I was referring and that is overseen by Ofgem is reinforced by the Government’s national energy policy statements. They set out the framework for factors to be considered when consenting to an infrastructure project of national significance. They make clear that for electricity networks, cost should not be the only factor in determining the type of network technology used, and that there should be proper consideration given to other feasible means of connection, including undersea cables.

Within the framework, National Grid, the transmission network owner in England and Wales, published a new approach to building new transmission infrastructure. Using that approach, National Grid puts greater emphasis on mitigating the environmental and visual impact of its new electricity lines, while balancing other considerations, such as the need to manage the effect on costs, which are of course ultimately funded through consumer energy bills. I hope that that balanced approach provides reassurance to hon. Members who are concerned about network infrastructure that alternatives are being considered.

Since the costs and technical difficulties vary so much from project to project, it is important that each one is assessed case by case. The Government consider the costs and benefits of undergrounding electricity lines to be important issues, which is why the Department of Energy and Climate Change supported an independent study—I think that it is the one to which the hon. Member for Wells referred—to give clarity on the practicality, whole-life costs and impacts of undergrounding and subsea cabling as alternatives to overhead lines. The report was published in January 2012, and its findings are generally consistent with the comparative costs that National Grid has quoted.

The potential need for and development of transmission network infrastructure in Montgomeryshire is the reason behind National Grid’s activities in the area. The application for the proposed new electricity network infrastructure to connect the proposed wind farms in mid-Wales has yet to be submitted to the Planning Inspectorate. After examination, any application would be decided by the appropriate planning authorities and Ministers, so it is not appropriate for me to give a view on the particulars of the project—as my hon. Friend the Member for Montgomeryshire has observed—or indeed on the proposed wind farms in mid-Wales, which have been subject to a public inquiry. However, I recognise that many people feel very strongly about overhead lines and other network infrastructure, and the possible effect on the landscape. In introducing the debate, my hon. Friend spoke passionately about the beauty of the landscape and the wonders of mid-Wales. He has been a champion of maintaining the landscape as it is, and we will take that on board.

Effective consultation with local communities and other interested parties is a vital part of the planning and regulatory approval process. When making proposals for new infrastructure, National Grid must demonstrate that alternatives were considered and why the preferred option is justified. It must also demonstrate that stakeholders have been engaged. At the root of the issues raised by my hon. Friend the Member for Montgomeryshire is his concern that, although safeguards exist and there are many levels of requirements for consultations, those consultations are either not taking place or not taking place satisfactorily. By law, the redress for that is through the Planning Inspectorate, which will look at the consultation process as part of the planning application. If it is not good enough, the planning application could be refused, because the request for planning permission requires a good consultation. My hon. Friend has made his points very clearly today, but I urge him to make them to the Planning Inspectorate as well at the appropriate time.

My hon. Friend spoke passionately about his constituency and mid-Wales in general. We have heard specific concerns about National Grid, but we believe that, overall, it is regulated carefully and diligently. Nevertheless, if hon. Members have specific concerns about incidents, they should write to me and I will certainly look into them. I urge all Members to continue to protect their constituencies as they have done, and congratulate my hon. Friend the Member for Montgomeryshire on leading this debate and being so assiduous in protecting his constituency.