Flooding (Somerset)

Tessa Munt Excerpts
Wednesday 2nd July 2014

(10 years, 4 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

David Heath Portrait Mr Heath
- Hansard - - - Excerpts

I am grateful to my hon. Friend, because the next thing written on my piece of paper is “A361”. I do not like the idea of Taunton being cut off from civilisation and we need to do something about the A361, but the question is, what? I am not convinced that simply raising the level of the road along its entire length is the most sensible use of funds, but we need to do something in combination with the sluice, which I will come back to in a moment. We need to mobilise whatever funding is available—whether from Network Rail, which otherwise needs to do something about its track across the levels, or the roads agencies—and use it in the wisest way to ensure that the road is not closed again and that we all have easy access to the pub at Burrowbridge, which served as such a useful headquarters for the media during the flooding.

Are we going to see the replacement of the necessary pumping facilities? Some have already been done, but we brought in those massive pumps during the crisis and they were an extremely good thing. We need to ensure that they are available when we need them, and without having to ask, as we need a boat to be available when necessary. Such facilities need to be built.

That brings me to the two big ticket items. One is the Parrett sluice, which I agree entirely with, having looked into the matter. As the hon. Member for Bridgwater and West Somerset knows, I was initially sceptical as to whether the sluice would include improvement for my area—it clearly would for his—but I am now convinced that it would. Preventing the influx of water from the Bristol channel at high tide, thereby ensuring that we can drain away water from the upper reaches of the levels, is crucial. We need the Chancellor of the Exchequer to announce the funding in the autumn statement—no doubt about it, we need it there in black and white. When we have that, we will be satisfied that the Government are keeping their promises to the people of Somerset.

Tessa Munt Portrait Tessa Munt (Wells) (LD)
- Hansard - -

While we are on the subject of sluices, will the Minister address the problem of Bleadon sluice, bearing in mind that we have all talked about how any approach has to be for the whole catchment area? My concern is with the Axe and Brue rivers; there is a need for dredging on the Brue, but my most important concern is the Axe, which drains out into the northern part of my patch and over towards Weston-super-Mare. Bleadon sluice was closed by the Environment Agency, which put a red notice on it in 2009. There has been a bundle going on—no one will take responsibility. I was told earlier this year that the sluice was going to be fixed at some point during the year, but we are a long way through it and nothing has happened. Will the Minister address that, since we are on the subject of sluices?

David Heath Portrait Mr Heath
- Hansard - - - Excerpts

My hon. Friend is absolutely right. We cannot divorce the issues of the Parrett and Tone from those of the Axe and Brue. That is why the next ask is equally important: setting up the Somerset rivers authority, to absorb the interests of the existing internal drainage boards and to create real capacity to manage our complex water systems appropriately and with the benefit of local knowledge. That will not happen unless we have a revenue stream to support it, which in turn will not happen unless the Department for Communities and Local Government realises that Somerset is an exception and does not fit its rules. The Department will have to give way to establish what is already the case in some parts of the east of England—a separate levy to fund the maintenance we know to be necessary. Again, that is an ask to which the answer must not be no, because otherwise we will not have done our job.

Will the Minister also update us about how the common agricultural policy reforms as implemented in England—the pillar two payments, in particular—will be used to encourage water retention, the sort of sustainable use of land that will reduce the amount of water entering the lower reaches of the levels at the right time? That is a key component, whether it involves reforestation or simple changes in land use, to enable us to hold more water at higher levels, releasing it slowly when it can get away.

We need a balance between the environment and the community, including the agricultural community. The environment of the levels is precious. I will not have it said that the environmental benefits of the levels do not matter, because the levels are irreplaceable—if we allow them to drown, they die. Therefore, it is in our interests as environmentalists, as well as representatives of our community, to ensure that the balance is created. As I have said often, flooding 3-feet deep for three weeks is fine. That is what we expect in Somerset; it is the levels way. Flooding 10-feet deep for 10 weeks is unacceptable; that is when people are in difficulties, businesses and communities die, and vegetation dies as well.

I hope that the Minister will give as many answers as he can. We will excuse things not having been completed by next winter, provided that we have clear intent that they are under way. After all the promises that we have been given and all the efforts made, however, we will not excuse things simply being said only for nothing to happen. We will have flooding again this winter—that is a fact—but if it is as bad as it was last winter and we can turn around and say, “The Government have failed to do all those things that they said they were going to do,” then, frankly, the Government will have to answer not only to the people in this Chamber, but to an awful lot of people in Somerset, who will be very angry indeed.

Dan Rogerson Portrait The Parliamentary Under-Secretary of State for Environment, Food and Rural Affairs (Dan Rogerson)
- Hansard - - - Excerpts

It is a pleasure to serve under your chairmanship, Mr Hood, and to have the opportunity to respond to the debate.

I hope to satisfy my hon. Friend the Member for Somerton and Frome (Mr Heath) with my response, as far as I can on the day. As he said, he has raised the issues consistently, since long before my time with this portfolio. More recently, we have had a number of opportunities for debate inside and outside Parliament. He has been entirely consistent, as have my other hon. Friends present today, and they have worked together as a team, along with our right hon. Friend the Member for Yeovil (Mr Laws), who has also raised the issues with me.

I have only a short time to respond, so I will not set out everything to do with the extreme weather that we experienced, although it is important to mention that the effects in Somerset were replicated in other parts of the country. Yesterday I was debating with right hon. and hon. Members from the Humber estuary. My hon. Friends here today will be delighted to know that those Members were only requesting £880 million for the schemes identified in that area. We are not short of positive ideas to deal with flooding around the country.

The specific issues affecting Somerset are not so much to do with the large numbers of properties flooded—as my hon. Friend the Member for Somerton and Frome said, in other areas a much larger number flooded—as with the volume of the water and its duration, producing the longer term economic impacts on the communities affected. There was in excess of 65 million cubic metres of floodwater, covering an area of 65 sq km. Exceptionally, that floodwater stayed on the levels for more than 12 weeks.

The Environment Agency did an excellent job in carrying out the single largest pumping operation ever undertaken in Somerset. As my hon. Friend said, the emergency services, the volunteers and all the other groups from local communities and from across the country who offered assistance did a magnificent job in some very difficult conditions. In addition to the 40 permanent pumps, the Environment Agency mobilised a further 24 temporary units, increasing the ability to pump by more than 150%, although there is an interaction between the tidal nature of the catchments and the ability to get the water out into the sea, which my hon. Friend considered when talking about the sluice. I want to make it clear that there are no plans to reduce the number of Environment Agency front-line flood and coastal risk management posts. That issue has been raised in the past.

On my first visit to the Somerset levels with my hon. Friend during the episodes of winter flooding there, the clear ask from the community was for dredging of the rivers. I came back to the Department determined that we should re-examine the case for doing so. The Secretary of State for Environment, Food and Rural Affairs followed up with a visit and asked all the local organisations to meet and to put an action plan together, with support from officials in the Environment Agency and DEFRA. That happened in a remarkably speedy six weeks. I chaired the first meeting and returned later to hear about some of the progress. We now have the action plan, whose delivery is crucial for the future of the levels.

Tessa Munt Portrait Tessa Munt
- Hansard - -

Will the Minister give way?

Dan Rogerson Portrait Dan Rogerson
- Hansard - - - Excerpts

I will give way briefly, but I do not have much time.

Tessa Munt Portrait Tessa Munt
- Hansard - -

It is a brief point. Will the Minister make absolutely certain that DEFRA officials stay engaged with the process, because an internal drainage board cannot do things on its own? It is crucial that DEFRA officials carry on working with the boards.

Dan Rogerson Portrait Dan Rogerson
- Hansard - - - Excerpts

DEFRA officials and indeed Ministers will remain involved. The Secretary of State was in the area again recently to look at progress. He has been appointed flood envoy for Somerset and Wiltshire by the Prime Minister, as I have for Cornwall. We maintain an interest in the delivery of the plan which, as my hon. Friend says, is crucial. Money has been made available from the Department for Transport, DEFRA and the Department for Communities and Local Government. For example, an additional £12.3 million from the Department for Transport has been made available to the county council to help roads recovery.

I want to pick up on some of the issues in the action plan and the progress that has been made against that plan. An important element is resilience, which is perhaps slightly more intangible than dredging and hard defences but is important. The Somerset civil contingencies partnership is providing a dedicated programme of targeted support to help people, farms, businesses and neighbourhoods to recover, including by accessing the support and advice that we have made available. They are working hard on plans to increase resilience in the future. As my hon. Friend the Member for Somerton and Frome said, flooding will happen again, so we must ensure that communities have what they need at their disposal. That is particularly so for people who have moved to the area and may not have been through this before, unlike the old hands who have and know about resilience and how to support one another.

Implementation of the action plan has started with the dredging of the Rivers Parrett and Tone. It started when the banks were stable and safe enough to support the weight of the heavy equipment, when local access permission had been sought and preparations made for receiving the excavated silt. The dredging is progressing well and is on target to be completed by the autumn. The plan is to dredge 8 km of river; so far 1.7 km has been completed and the number of gangs has increased from two to six.

Work is in hand to find alternative ways of getting water to flow from the Parrett catchment area by increasing the capacity of the River Sowy and the King’s Sedgemoor drain so that water can be pumped more easily and be diverted to Dunball where extra pumps are working. The footings have been made permanent so we can call on them if necessary. That will lower the levels in the River Parrett sufficiently to enable the pumping stations to be operated, helping to lower water levels on the moors around Langport, and to a lesser extent around West Sedgemoor, Curry moor and North moor.

The Environment Agency is currently scoping this work and hopes to appoint a consultant by the end of this month who will work with communities and professional partners to agree aims and to include them in the development of the options. By the autumn, the agency expects to have assessed a range of options to see what is feasible. Partnership funding will be needed to build the scheme. Further key action is the construction of a barrier or sluice to deal with the impact of a rise in sea level and to protect Bridgwater from flooding, and to look at future development.

On Friday 6 June, the Environment Agency, with Sedgemoor district council, organised a technical meeting to discuss various options for the type of barrier that could be used. The meeting was attended by 60 people who received presentations from experts from across the country who have been involved in the design of other flood defence barriers. The long-term vision for Bridgwater was also discussed. A group will review these options and compile a report by September. That report will contribute to an informed decision on the preferred option.

The Environment Agency estimates that it will be three to five years before construction starts and that it will take two years to complete notwithstanding discussions on funding, to which my hon. Friend is keen to draw attention. If we have a plan by September, that will allow serious consideration of the funding options.

Under the action plan, a new Somerset rivers board is being set up. It will have greater control of and responsibility for work to maintain water and flood risk management in the area. This work is being co-ordinated by Somerset county council, working closely with district councils, the Environment Agency, Natural England and the internal drainage boards, which do such crucial work not just in the Parrett and Tone catchment areas but the Axe and Brue areas.

The Somerset rivers board was discussed at an interim leaders implementation group meeting on 20 June. It was a positive meeting that acknowledged the need for compromises and urgency. The options under review include organisational structures, legislative requirements and funding models, all issues that will need to be discussed by local and national Government to ensure a sustainable model in the future. Proposals being considered include an appropriate catchment-wide funding mechanism to generate additional funds. These proposals will be discussed at the next leaders group meeting on 7 July. When proposals have been agreed, next steps will include consultation and engagement on them. In addition, work is under way to consider raising the road to Muchelney and building a ring-bank flood protection scheme for Thorney. My hon. Friend was keen to make the case for that.

We have made provision through funding such as the farming recovery fund, and 167 applications were received from Somerset by the 27 June deadline. That represents 44% of all the claims. It was available to other areas of the country that experienced winter flooding from early December 2013 to April 2014. The total value of claims from Somerset is over £1.5 million of the money that was made available. Repair and renew grant is also available, and householders and businesses may claim up to £5,000 to establish flood resilience measures on their property. Of the 283 properties that were flooded in Somerset, 219 were in the area covered by Sedgemoor district council. Other councils have also taken that option.

In the few seconds remaining, I should say that I greatly appreciate the leadership that has been shown in communities. This has helped to bridge the gap between local and national agencies. We will continue to focus on delivering the action plan. There are challenges ahead, but if we work together we can overcome them so that that resilient community has a better time in future.