Rail Services: Maidenhead, Twyford and Branch Lines Debate
Full Debate: Read Full DebateTanmanjeet Singh Dhesi
Main Page: Tanmanjeet Singh Dhesi (Labour - Slough)Department Debates - View all Tanmanjeet Singh Dhesi's debates with the Department for Transport
(4 years, 9 months ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
I beg to move,
That this House has considered rail services for Maidenhead, Twyford and linking branch lines.
I am pleased to have obtained this debate, because the train services in my constituency—for the mainline stations of Maidenhead and Twyford, and the branch line stations of Wargrave, Furze Platt and Cookham—are absolutely critical for my constituents and local businesses. Many of my constituents use the train services to access employment, particularly in London, which they also visit for leisure—visiting theatres and galleries and going shopping—and for other purposes. Local businesses also rely on the train services to bring potential customers, employees and other visitors. They all want fast train services on those lines.
I have campaigned on this issue throughout my time as a Member of Parliament. The good news is that, over that time, Thames Trains and its successor, Great Western Railway, under its various names, have generally been responsive to the concerns that have been raised about services in the constituency. When there have been problems with the timetable, they have done their best to respond.
The bad news, I am afraid, is that I cannot set out that rosy picture today, because the service has deteriorated. Nick Brace, a constituent of mine, said that the most frustrating thing is that
“for much of 2019 GWR had this all sorted—the right number of trains, in the right format mostly running to time. And it has all gone down the pan with the new timetable.”
The key issue is not the timetable, but the reason behind it: the introduction of Crossrail.
Before I address that, I will set out clearly for the Minister the nature of the problems that my constituents currently face: fewer fast trains, less reliability and significant overcrowding. Great Western fast trains have been cut from the timetable during the morning and evening peak hours to provide more long-distance services, which has had a significant impact on my constituents.
I will share some examples of the complaints I have received from constituents. One said:
“Morning and evening rush hour fast trains to/from Paddington have been massively reduced. For example we have gone from fast trains at 8.02, 8.06, 8.16 and 8.32 to only two—8.02 and 8.32. The intervening trains have now become 35 minute trains, which means London commuters don’t use them.”
Another said:
“Under the original timetable between the times of 07.40 and 08.30, there are three trains…that take 30 minutes or less to Paddington. From December 15th, there will be just one fast train within this time period—the 08.02. The fast train before that will be 27 minutes earlier, leading to a huge bottleneck of commuters.”
On the evening services, a constituent said:
“Most crucially is the cancellation of the two peak evening fast trains to London Paddington. These two peak trains—the first a 4.42pm and the second at 5.48pm—take approximately 21 minutes and represent a significant difference from the 39 to 47 minutes being introduced as part of the new timetable.”
Great Western Railway has looked at reinstating the two peak-hour morning services that were removed, but sadly it has told me that
“there is no readily available space for additional stops”
but that it has
“looked at a number of options including sourcing extra rolling stock and stopping high speed services that have originated in the west, such as from Bristol or Plymouth. Disappointingly, it has not been possible to find a timetable path that will work without causing congestion and significant performance delays in the key peak period.”
On the evening services, GWR told me on 30 January that it was
“in discussion with Network Rail about the possibility of introducing some additional evening services from Maidenhead to London Paddington, which we might be able to operate from May, or sooner if we can gain approval.”
At that stage, it continued:
“It is fair to say that NR are apprehensive about the performance ramifications of these trains”.
I can now tell the Minister that this week Network Rail refused the application for those additional services.
I have been here before. Network Rail has previously refused additional services and changes to the timetable but then relented. Great Western Railway will appeal against that rejection, and I will appeal, but I urge Network Rail to reconsider and to reinstate those two trains. That matters not just for my constituents, but for our local economy, the wider Thames valley economy and the economy of the nation as a whole.
The right hon. Lady is making some excellent points on behalf of her constituents. The railway links benefit not only Maidenhead but my Slough constituents. The western rail link to Heathrow, a four-mile link between Slough and Heathrow, would benefit our two sets of constituents and people in the south-west and west. The Welsh Government are also in favour of it, because of the huge boost to our economy and the decarbonising of our transport. Does she agree that it is about time that we delivered on this, given that the Government committed to it in 2012? We hope that the Minister will give us some good news about sufficient and solid performance progress on this matter.
The western rail link to Heathrow has been an issue throughout most of my time in Parliament. It has long been talked about, plans have been drawn up and people have looked at it. It has overwhelming support from business, different constituents and different political parties locally. It is something that global Britain would definitely benefit from having. I certainly support the hon. Gentleman’s proposal about the importance of that rail link.
I want Network Rail to reconsider Great Western’s application for two additional evening services and to reinstate evening peak-hour services to London Paddington. I also want it to work with Great Western on the possibility of bringing back services in the morning peak hours.
Not only has the reduction in the number of fast services had an impact on my constituents, but the service has sadly deteriorated. Again, I quote a constituent:
“The services that have been impacted the most are the 7.02 and 7.07 direct services which are now the only direct fast trains to Paddington during the 6.40-7.30am ‘super-peak’”,
and the reliability of those services
“plummeted from 96% and 93% respectively in the month leading up to the timetable change to just 74% and 37% post the timetable change”.
That included a significant number of cancellations. This is simply not good enough.
Lack of services and cancellations have led to the other problem that my constituents suffer from: significant overcrowding on the trains, including safety issues on the platform. Constituents report that they often cannot get on the 8.02 train from Maidenhead because there is simply no room. That service used to start from Twyford and a good number of seats used to be available; it now comes from Didcot Parkway, and when it gets to Maidenhead it is just not possible to get on the train, even to stand. That causes significant problems on the platform, and Great Western has had to employ security guards on the platform because of problems with overcrowding. That is a further issue that my constituents suffer from.
Sadly, I understand from Great Western that some problems with cancellations and carriage reductions were caused by a number of fatalities on the line. Those fatalities are tragedies, and our hearts go out to the families and friends of all those concerned, but those cannot account for all the problems in the service that my constituents suffer.
I have talked about Maidenhead and Twyford in particular, but constituents from Wargrave, Furze Platt and Cookham on the branch lines also want to connect with the fast services into London. Indeed, I see that my hon. Friend the Member for Henley (John Howell) is present, and his constituency is at the end of one of those branch lines. They, too, are impacted by the problems on the mainline services. The service problems need to be fixed. Network Rail needs to allow the extra evening services. It needs to work with Great Western see if the morning peak services can be reinstated.
Another possibility that would help my constituents is an expansion of the fleet, to increase capacity. I ask the Department for Transport to work with Great Western on the possibilities for increasing the rolling stock, such that extra carriages could be put on the services. That would allow greater space for my constituents to use. Other improvements to help my constituents would include better access to the platforms at Maidenhead, to help with the congestion in the subways and at the entrances and exits. That needs funding.
I noted in Prime Minister’s questions today that my right hon. Friend the Prime Minister, answering a question from another of our hon. Friends on railway infrastructure, indicated that there was a significant amount of money that the Government could spend on railway infrastructure. I am afraid that I commented to my neighbour on the Benches that that meant, I hope, that the Minister will be able to agree to the millions of pounds necessary for the infrastructure changes at Maidenhead, and indeed for more car parking, which is paramount at Twyford. On a Saturday in Twyford 10 days ago, when I was doing my street surgery, that was the single issue that came up time and again on the doorsteps. Again, it needs support from the Department. I will write to the Minister with details of those two issues, and I hope that he will be able to instruct officials to look at the proposals seriously and favourably.
I completely hear what my right hon. Friend says, and I hope that I will get to address that point properly in a moment.
Time is quite tight. I would like to address in more detail what my right hon. Friend has said, but may I just say that if I do not cover all the issues she raised, I will write to her with a much fuller answer?
In answer to the hon. Gentleman, I am told—he kindly told me beforehand that he would raise that issue, so I was able to check with my officials—that Network Rail’s application for a development consent order is expected in summer 2020. That will be the next major milestone for that project, which we are keen to progress.
I have just a minute left, so let me conclude by saying that I will write to my right hon. Friend with more detail about some of the issues she raised. The Government are investing billions of pounds in the rail industry. As I mentioned, when the Elizabeth line fully opens in 2022, it will significantly increase rail capacity in London and probably increase demand from Maidenhead too, with the changes in service it brings. However, I will happily go back to my Department and contact Network Rail about GWR’s application for the reinstatement of fast trains, which I did not know about. As always, my right hon. Friend represents her constituents with passion and vigour, and I promise not to drop this ball on her behalf.
Question put and agreed to.