(1 year, 9 months ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
It is a pleasure to serve under your chairmanship, Mrs Cummins. I thank the hon. Member for Torbay (Kevin Foster) for securing the debate.
I want to talk about my Stourbridge Dasher. I invite the Minister to Stourbridge to see for himself how important it will be to the community. The Dasher will be transformative. It will run along an old passenger line and extend the branch line, and restore an important economic link. It is railway restoration at its very best. The Dasher would reinstate passenger services on a four-mile, freight-only branch line between Stourbridge Junction, and Round Oak and Brierley Hill, and the terminus at Brierley Hill would link it to the West Midlands Metro tramline extension, which is expected to open in 2025. This has never been more important, given that under the 2024 boundary changes Brierley Hill will come into the Stourbridge constituency. Of 1,500 people surveyed in my constituency, 87% were in favour of the Dasher and would make use of it.
The Dasher would bring huge benefits. It would link Stourbridge to the wider Black Country, opening passenger travel between some of the region’s most deprived areas. It would be good for areas such as Amblecote and Brierley Hill, with stations planned at Vicarage Road and Brettell Lane, and good for jobs by increasing the ease of travel, taking the burden off roads such as the A461, and sparing residents from frequent traffic jams. If delivered, this line and its stations would make a real contribution to reinvigorating the area.
Stourbridge already has the Stourbridge Shuttle, which is pretty impressive in itself. It connects the main line train station to the centre of Stourbridge town and runs every 10 minutes, seven days a week. It has an on-time train service reliability of 99.8% most of the time, which I am sure most present would agree is pretty impressive. Its operating costs are 50% cheaper than those of conventional railways, and it is eco-friendly, running on liquid petroleum fuel that is kinder to the air, which is a UK first. It is Europe’s smallest branch line—the journey time over the 0.8 miles is only three minutes—but while it might be small, its track record of delivery could be extended to the Dasher.
I thank Pre Metro Operations, which brought the potential of the Dasher to my attention. Pre Metro Operations has done a brilliant job of putting together a business case, through work done out of dedication and love of the branch line, and with innovative thinking. On Friday, I am going with the Pre Metro team to a site near Stourbridge for a demonstration of the potential Dasher. We all have those days and visits that we just cannot wait for, and this is one of them. I love trains anyway, but I cannot contain my excitement over being able to see the potential of my Dasher. I am serious—my constituents know that as well. I am genuinely excited about the future possibilities of making the Stourbridge Shuttle into a Dasher.
The project needs only £50,000 for an initial feasibility study to kick it off. I do not think that is too much to ask for.
My hon. Friend is doing such a good job of talking about her railways, she makes me want to travel on them immediately. For 20 years, MPs, councils and community champions have been campaigning similarly to reopen Stroudwater station on Bristol Road, Stonehouse. I was proud to be the MP who secured £50,000 to do the feasibility study, so I completely understand her passion and pitch. We are asking for the environmental, economic, business and tourism benefits not just for now, but for the future. From speaking to Great Western Railway, I understand that there is a lot of waiting before getting from Government an understanding of what the funding pot for railway investment will look like, given that the country’s finances are stretched at the moment. Does my hon. Friend agree that hearing about that investment early and having the Department for Transport work closely with individual bids on feasibility are incredibly valuable to all our communities?
I could not agree more with my hon. Friend. I have been waiting some time for that £50,000. These are quick-win projects that do so much for communities. Getting that closer link with the Government, in particular on feasibility work, would save so much time further down the line, even if it were to prove that the project was not feasible. I thank her for that.
I finish as I started, by asking the Minister to come and visit our brilliant shuttle, to see for himself that it would be even better if we had the Stourbridge Dasher. I am sure the rewards to all will be hugely demonstratable, but none more so than the rewards to the community of opening up the superb branch line once again and seeing the Stourbridge Dasher, in all its magnificence, take to it. What is not to love?