Public Bill CommitteesI thank the Minister for his response, much of which I anticipated, if not quite all of it. I shall make two brief points.
First, with some of the detail of the new clause I was trying to tease out the extent to which the Government feel that new towns or garden cities have to abide by the garden city principles. For example, I discussed with the Minister’s predecessor the lack of affordable housing in Ebbsfleet, which did not seem to me to be in line with the garden city principles. That is why the new clause contains quite a detailed list and includes things such as community assets, which are not mentioned in the national planning policy framework. Will the Minister ponder on the fact that there is a great deal of detail in the new clause that is not in the NPPF? How might such detail be applied to new towns?
Finally, we have not discussed this much in Committee because the national infrastructure commission was taken out of the Bill, but I emphasise to the Minister that for any new settlement it is essential to get the infrastructure costs met, and met up front. That was a huge problem for Ebbsfleet, which is why there was considerable delay in the build-out. When the Minister comes to putting the final touches to the White Paper, I hope there is something in it about how infrastructure will be funded, because that seems to be a major issue that holds up the development of new settlements. With that, I beg to ask leave to withdraw the motion.
Clause, by leave, withdrawn.
New Clause 10
Funding for local authority planning functions
(1) The Secretary of State must consult local planning authorities prior to the commencement of any new statutory duties to ensure that they are—
(a) adequately resourced; and
(b) adequately funded
so that they are able to undertake the additional work.
(2) In any instance where that is not the case, an independent review of additional cost must be conducted to set out the level of resource required to allow planning authorities to fulfil any new statutory duties.—(Jim McMahon.)
This new clause would ensure that the costs of new planning duties are calculated and adequately funded.
Brought up, and read the First time.
That has never been a suggestion in any of our debates, or from any of the people who have given evidence. The proposal is not to profiteer from developments that enhance the local community, but to reflect the true cost of administering planning applications. Taxpayers should not subsidise applications through their council tax, and developers should get the service they require. I agree with the hon. Member for Croydon South that there is a need to ensure good performance, as there is a contract between developers and the local planning authority. We would be open to that, as would councillors—Councillor Newman was clear that a better relationship would be created between local authorities and developers through the increased fee and through developers’ expectations being managed.
My hon. Friend makes an important point. Does he agree that if the Government do not like the wording of the new clause, they can table another proposal on Report that makes it clear that only full cost recovery is being sought, and that it is about hypothecating for planning any additional money raised?
That is an important point. I am a localist at heart. I want to get away from the idea that central Government determine absolutely every fee, charge and activity at a local level. We should be far more inclined to push back and say that if people have an issue, they should take it up with the local authority concerned and have that direct relationship, holding to account locally. It is interesting that we are giving developers a facility that we do not give to members of the public, for example when they are having a relative cremated—we do not determine in Parliament how much those fees should be. We should be a bit more realistic and accept that councils are grown up and mature and that they do such things on a daily basis. That relationship with developers can be done to a great extent.
No one in the Opposition will say that the wording of the new clause absolutely achieves everything we have set out. That was not the intention; the intention was that we put a marker down and that we push the issue, because people have pushed us to push the issue—we heard that in the evidence sessions—and we would be absolutely delighted to see alternative wording come forward at a later stage to tie things down.
It could well be that between now and our next sitting that legislation is used, that the regulatory power of the Secretary of State is enforced and that local authorities are given that ability, in which case we might have a very different debate at our next sitting. As it stands, however, that power is not used, which is why we suggested the new clause. I beg to ask leave to withdraw the motion.
Clause, by leave, withdrawn.
New Clause 11
Review of sustainable drainage
(1) Before exercising his powers under section 35(1) the Secretary of State must carry out a review of planning legislation, government planning policy and local planning policies concerning sustainable drainage in relation to the development of land in England.—(Dr Blackman-Woods.)
This new clause would require the Secretary of State to review the impact of the planning system on the management of flooding and drainage.
Brought up, and read the First time.
I beg to move, That the clause be read a Second time.
I am sure that the Minister was an avid follower of the deliberations on the Housing and Planning Bill, so he will know that the issue raised by this new clause was mentioned in those proceedings, particularly in the other place. The Government have already committed to a review of planning legislation, Government planning policy and local planning policies as they relate to sustainable drainage. Given that, it is appropriate for the Minister to ask, “If so, why make a similar amendment to this Bill?” I hope to give him the answer. The new clause is, first, very much a probing one, so that we may put questions to the Minister about the review, and secondly, to reiterate the importance of undertaking that review before the Secretary of State exercises new powers that the Government have said are made under the Bill in order to bring forward more development.
The review came about as a result of a call for a more strenuous new clause on sustainable drainage that was tabled by a cross-party group in the other place. In response, the Government said that they would carry out a review, although it was much narrower than what was requested by their lordships. We ended up with a commitment to undertake a full review of the strengthened planning policy on sustainable drainage systems by April 2017—narrower than this new clause and the previous one.
The Housing and Planning Minister at the time said:
“The Government are committed to ensuring that developments are safe from flooding, and the delivery of sustainable drainage systems is part of our planning policy, which was strengthened just over a year ago. Our policy is still new, as I outlined in more detail last week, and I am willing to consider issues further as it matures. I am happy to review the effectiveness of current policy and legislation”.—[Official Report, 9 May 2016; Vol. 609, c. 463.]
That commitment was given in lieu of the amendment in May this year.
International uses of affordable housing are usually something like three times average income. In my constituency, that would make a home affordable at about £75,000 or £80,000 if it was one person, and for a couple, double that. That is by international standards. For a lot of people on average incomes, that puts starter homes out of their reach, but that was not the point I was raising.
Now it is my turn to tell the Minister that we are doing a piece of work on what affordability means in the current housing environment. When we have completed that, I will be happy to share it with him. New clause 12 seeks to make viability a bit more transparent. The Government’s own review of the NPPF and guidance came forward with the suggestion of guidance being stronger on the transparency of viability assessments. I direct the Minister to Lord Taylor’s work and ask him to ponder on it. That was, as far as I understand it, an independent review of the Government’s guidance. There is general agreement that it would be really helpful to our whole development system if viability was more transparent. On that basis, I beg to ask leave to withdraw the motion.
Clause, by leave, withdrawn.
New Clause 14
Review of permitted development rights
(1) Before exercising his powers under section 35(1) the Secretary of State must review the provisions of all General Development Orders made under the powers conferred to the Secretary of State by sections 59, 60, 61, 74 and 333(7) of the Town and Country Planning Act 1990 granting permitted development rights since 1 January 2013.—(Jim McMahon.)
This new clause would require the Secretary of State to review the permitted development rights granted since 2013.
Brought up, and read the First time.
I beg to move, That the clause be read a Second time.
New clause 14 intends to finally hold the Government to account on the extension of permitted development rights. We have heard a lot about our aspirations for quality, decent neighbourhoods and places where people aspire to live and are proud to live. Extension of permitted development rights flies in the face of that, because it allows a free-for-all for developers without checks and balances, local control and long-term stability and quality in mind.
I suppose the hon. Gentleman could listen to me, or he could listen to the architect who said of the Housing and Planning Bill:
“This new Bill only addresses speed of delivery: short-sighted political gain at the cost of long-term quality.”
The professionals are saying that quality is an issue. I can point to conversions in Greater Manchester, which I know well. Some have used the extended permitted development rights to produce a quality development. That will almost certainly be true, but we can all point to one and try to hold it up as an example of many, when of course that is rarely the case. However, as we are seeing, the Government just do not know. It is okay to shine a light on the evidence provided by professionals, but the Government do not know the answer. If a more regulated planning system were brought back in, council planning departments would definitely be able to get a grip on quality and see it through.
That is all we are asking for. It is not about passing judgment on whether premises should or should not be converted from commercial to residential; it is about ensuring quality, affordability and long-term sustainability and starting to plan communities and neighbourhoods, instead of letting developers get away without paying their fair share. I cannot see why anybody would argue against that. It would highlight the best developers who contribute to community and society. Fair play—they make a profit doing so, and there is nothing wrong with that, but there are some people who do not play the game fairly and who extract as much cash from it as possible, with absolutely no interest in quality or community. Bringing measures back in to take firmer control of that has got to be in the long-term interests of this country and of our towns and cities.
Would my hon. Friend like to point out to the hon. Member for Thirsk and Malton that on the internet, one can find the 10 worst permitted development loopholes, and they are truly shocking? I am happy to let the hon. Gentleman see the examples after the Committee has ceased this sitting. They point to some serious breaches of good planning policy that emerge from an overzealous use of permitted development.
That is a fair point. The topography of a town like Oldham, in the beds of the Pennine hills, is a good example. Under the current permitted development rights, height restrictions apply only at the start of a development. If someone who lives on a slope builds out to the maximum height allowed, by the time they get to the bottom of the hill, the property could be 10 m high. Under permitted development, they would be allowed to do so, with no thought for the consequence to the people living below. There are issues, not just about conversion from commercial to residential but about the character and nature of our communities and where people live, and the impact that neighbouring properties can have on each other.
We have heard a lot about quality, and about how neighbourhood planning would go a long way towards giving community a voice. The Bill does not do that. It takes away that voice, it takes away control and it takes away the quality that we all aspire to. We think that new clause 14 is important. It is not a probing amendment; we are absolutely committed to seeing it to a vote, and I hope that we get some support on it, because it is in line with the debate that we have been having.
(8 years, 1 month ago)
Public Bill CommitteesI refer the Committee to my entry in the Register of Members’ Financial Interests—I should have mentioned earlier that I am a member of Oldham Council.
I struggle with the idea that asking developers to produce a landscaping plan is onerous. We are not talking about amateurs. When developers employ an architect to design a scheme, it is not that difficult to overlay it with a landscaping plan. The point has been made that, for a lot of people, that plan is the difference between whether a development is acceptable or not. That is not just because it can provide good screening but, importantly, because it forms part of the character of the locality.
We should all be trying to promote good development and good design in good context. Removing the conditions would not really help towards that. I can think of loads of planning schemes where really good landscaping design has added value. It has been good for the community, for the developer—which was able to get a premium on those properties—and for the people who live in the development, and it does not actually take that much time.
I struggle because—I wonder whether my hon. Friend agrees with me—we are just talking about planning. If developers are professionals, they will get their ducks lined up—or their bats—and ensure that they have the surveys in place. If they are refurbishing an old barn or building, they know that those things are needed and should just crack on and get them done.
My hon. Friend makes an excellent point that is pertinent to our discussion.
The only example that has been given to us in the Committee, apart from the ones I speculated on myself, was landscaping. I think we dealt with why landscaping is so vital to know about at an early stage in the process.
A lot of examples have been used—we have had this debate often, and we have gone around the houses on bats and newts and, at one point, hedgehogs. That is all fine and well, but we really wanted to get to facts and numbers. How many planning applications have been frustrated or delayed significantly because of these conditions? We do not have those facts. We have people giving evidence of their experience and opinion, which is important, but is not the same as the hard numbers we have asked for.
My hon. Friend makes an excellent point about the various surveys that the Minister mentioned, which I was about to come to.
(8 years, 1 month ago)
Public Bill CommitteesThat is a fair point about where things are today, but the damage has been done and we cannot change things back to what they were. The phrase “a sledgehammer to crack a nut” has been used probably once too often today, but article 4 is a good example of a very big sledgehammer being used to crack a very particular nut. Article 4 affects everybody in the vicinity or within the boundary and obliges them to comply with the directive. I am talking about a particular problem that has been brought about by the extension of permitted development.
My hon. Friend is making a powerful case. Does he agree that in policy-making terms it is nonsense to set up a scheme to relax permitted development rights, recognise that it causes a huge problem and then introduce another system to try to counteract the adverse consequences of the original policy? All the Government had to do was allow local authorities to grant planning permission in the first place, rather than introducing a relaxation of permitted development rights.
The resources of local government are a critical issue. Many are looking at the next three to four years and wondering how on earth they will make ends meet or cover the costs of adult social care and children’s services. When faced with such choices, clearly the councils go to the back office—or what people consider the back office until they are an applicant who needs to use the planning system when, all of a sudden, it becomes a front-line service. If the Minister is determined to make everything work, it is important that the proper resource is given. We have been given some hint about a White Paper that is due and about conversations that might or might not be taking place, and we are intrigued, but a bit more certainty would go a long way.
My hon. Friend makes an excellent point. He more than any of us in Committee understands the day-to-day, lived experience of people in local authorities and just how difficult it is to keep managing, in particular, the huge portfolios that some of our local planning officers have to on such limited resources and—this is pertinent—with no end in sight. We do not know what is to come in the Minister’s White Paper, but there is no clarity at all about when the contraction of budgets in local planning departments will stop. At the moment, we have contraction figures right up to 2020. If the Minister is to reverse that and put in additional resources, that would be a good thing, but at this point in time we do not know whether that is the case.
We do not know whether there will be any means by which local authorities can fund the putting together of the register. Several people who gave evidence to the Committee were at pains to stress to the Minister that responsibility for an operation of this type will fall on planning policy officers. Some district councils have only one planning policy officer to do all their local plan-making work, to support all neighbourhood planning and to do all the work required for a register. That just does not seem possible, or possible to deliver.
We have made the case that the planning register as proposed under clause 8 is wholly inadequate. If the Government did not rely so heavily on permitted development, it would not be necessary anyway. If the Minister wants to stick to his thoroughly discredited permitted development scheme and ask local authorities to produce a register, he should also pay for it. I look forward to hearing what he has to say.
I thank the Minister for that response. Like him, I am a geek when it comes to data. I love nothing more than spending time in the library on the Office for National Statistics website—that counts as entertainment for me. However, I am also aware that data can often be used as a crutch for a weak argument. Data have been thrown out in bucket-loads, but the substance of this argument has not been deployed in quite the same way. We talked a lot about numbers, which is great. We have not talked anywhere near enough about affordability, quality or even if these units are occupied. We know that in many towns and cities foreign investors are coming in and buying up units that local people could live in, ensuring that no one lives there.
When we talk about data collection and how councils have enough to do—that is a fair point—we must also accept that development control teams will be in those buildings, making sure they comply with development control rules. They will be signing those buildings off for occupation. At that point the buildings will come on to the council tax register, and any council worth its salt will then make applications for the new homes bonus. So councils are reporting units anyway, but via a different route. One thing that councils would appreciate is a single point of reporting. Rather than all these Government Departments coming to councils from all over the place asking for individual pieces of data, the Government should say with one voice, “This is what we need to know.” Collating the data in one place would helpfully save time and energy.
There is quite a lot of agreement on the principles we have been talking about. The combination being mooted here is of quite small living spaces with a lot of communal areas. A development is being built today in Oldham on that model, where the flats are quite small but there is a gym facility, communal areas and quality space that will attract a niche market of commuters who no doubt work or study in Manchester city centre. There is a place for that, but that is where the local authority has made a conscious decision that that would add value to the overall mix of accommodation within the town. It is not a free-for-all. Unfortunately, the permitted development route at the moment is a free-for-all for far too many people, without the right checks and balances in place.
I suspect that we will not be able to come much closer than agreeing that permitted development seems to have worked quite well in one or two locations. The evidence, in particular when we hear representations from local government, says that it is fraught with difficulties and removes the local control we know is very important. Perhaps we cannot get any closer than that. I beg to ask leave to withdraw the amendment.
Amendment, by leave, withdrawn.
Question proposed, That the clause stand part of the Bill.
I will not detain the Committee for long, because we have had quite a wide-ranging discussion. The Minister started his comments on amendment 28 by referring to Opposition Members’ subbing policy. I want to tell him exactly what our policy is, then perhaps he will explain his. The Opposition recognise the talents of all our Members, including my hon. Friend the Member for Bassetlaw, who is not currently present. We have an incredibly inclusive policy because we want to ensure that everybody participates and is able to use their talents to the full. I am not sure that that is the policy the Minister is employing with regard to Government Members, but I will let him answer for himself.
We will return to permitted development when we discuss new clause 14, but I should say to the Minister quickly that a number of people who gave evidence to the Committee pointed out that permitted development was weakening the planning system. In particular, his own councillor, Councillor Newman from the Local Government Association, pointed out the nonsense of what had happened in Croydon where they had to get an article 4 direction. Although we are not going to vote against the clause, permitted development is not working as well in practice as the Minister suggests, for all the reasons given by my hon. Friend the Member for Oldham West and Royton. I hope the Minister will consider whether the register is really necessary. If he got rid of all the permitted development, it would be unnecessary.
(8 years, 2 months ago)
Public Bill CommitteesThis is a very important point because the provision must not be seen as a way of paying lip service to local opinion. People spend a lot of time trying to work up neighbourhood plans, which go through a massive amount of consultation, and they go round the area with clipboards, but when it comes down to it they are not treated with seriousness in the process. Having this quality assurance would help that.
My hon. Friend makes an excellent point. Public confidence in the system is important.
Just to show that I looked, we found that national planning policy guidance includes guidance on the independent examiner’s role, how a neighbourhood plan or order is examined, how the public can make their views known to the independent examiner, who can speak if a public hearing is held and whether the examiner considers the referendum area to be part of their report. However, there is nothing at all—not in that section anyway—about who the independent examiner should be or what qualifications they might be expected to have.
The reason the amendment specifies the RTPI is that it has a mark of quality attached to it, and has been clear about the principles to which examiners should work. There are five core principles. I think this might be helpful, and if the Minister does not want to include it on the face of the Bill, it might be put into regulations.
It is hard to disagree with any of the five core principles, or to suggest a reason why they should not apply to examiners. Those subject to them must act with competence, honesty and integrity; and they must use independent professional judgement. That is particularly important, because we want the examination to be seen as professional. After all, the plans are very important. They should probably have more importance in the planning system. We want to make sure that they will be professionally examined. Examiners must apply due care and diligence; they must act within principles of equality and respect; and obviously, they must exhibit professional behaviour at all times.
That set of core principles seems to me to be very helpful. The RTPI deals with professional planners all the time, and it has provided more detail about what the principles mean with respect to the role of an inspector. I shall not go through them all, because there are too many, but I thought it might be worth looking at a few that seem particularly important.
“Members must take all reasonable steps to maintain their professional competence”.
That seems fairly obvious; we want people who are to examine neighbourhood plans to deal with the planning system as it currently is—not as it was when they trained, which could have been some time ago.
They must also
“take all reasonable steps to ensure that their private, personal, political and financial interests do not conflict with their professional duties.”
Again, that is important. I wonder whether the current system pays attention to any financial, personal, political or other conflict of interest, particularly in relation to examiners. It may, and I hope that the Minister can reassure us on that point, but I think my constituents would want to know that people with a conflict of interest were screened out before the point at which they would get to examine a neighbourhood plan. It is not clear to me at what stage in the current process that happens, or what questions are asked during the appointment process, to ascertain whether there is a conflict of interest.
“Members must not offer or accept inducements, financial or otherwise, to influence a decision or professional point of view”.
That is an issue that councillors are used to having to deal with; but again, it has not been made clear. I do not suggest for a minute that any examiner would have been subject to the taking of financial inducements, or anything of the kind. I just do not know, at this stage, what process there is in place to ensure that that does not happen, or what oversight there is of the examination process. Also, examiners should not disclose to employers or clients what is happening in the neighbourhood plan where it would be to their advantage.
I am not trying to suggest there has been a problem in the past, but we have neighbourhood planning provisions before us in a Bill that seeks to strengthen and streamline the process of neighbourhood planning. It is the Opposition’s job to seek ways of improving the Bill and one way might be to give greater clarity and confidence to the public and all our constituents that neighbourhood plans are being effectively and efficiently examined. That provides more confidence in the process, which we are incredibly supportive of.
I actually think—I am sure my hon. Friend will agree—this is a gift for the Minister. Imagine a situation in which there is no quality assurance in place and no mechanism built into the membership organisation to deal with complaints. Where else would the complaints come but across our desks?
I am grateful to my hon. Friend for that intervention. It drives home the point we are making. We have tried to be incredibly helpful in tabling the amendment. The point has not been raised only by Opposition Members. As I pointed out earlier, it was raised by people who gave evidence to the Committee. It is important as a matter of public record that we are clear about how the plans will be examined and about the qualifications of the examiners. As my hon. Friend said, the RTPI has given a gift to the Minister by saying there is already a code of conduct and already professional guidance in place, so why does not the Minister simply adopt it and then we will all have better reassurances about the qualifications—[Interruption.] I am sure the hon. Member for North West Hampshire can intervene on me if he wishes to do so, and I will seek to answer his question.
If I may, I will move on to new clause 1. Although we have tabled it as a new clause, it is really just a further probing amendment to find out whether the Minister thinks there should be a threshold for the number of electors who will turn up to vote for a neighbourhood plan. Again, I am not trying to make the process of having a neighbourhood plan more difficult, because we are terribly supportive of neighbourhood plans and want as many of them in place as possible.
In fact, because the Minister is extremely good at reading the Lyons report, he will know that we had a whole section in that report about local plan-making and how we might marry up neighbourhood plans with the local plan-making system. That was not to take powers away from local neighbourhoods, but to have these as an initial building block for local plans so that local plans are not something that is seen to be imposed on a local community, but are something that develops organically from looking at a whole range of neighbourhood plans. He knows that the Lyons report also talked about how we could fund that, because if we are going to adopt a system where neighbourhood plans are the building blocks of local plans, resource will clearly need to be put into neighbourhood plans.
If I may again use the example of my constituency, we are now back at the beginning, more or less, of our local plan-making process. I think I am right in saying that process started in 2007; if I was being really generous to the local authority I might say 2008, but really we had preliminary discussions in 2007. Here we are in 2016, I think 11 rounds of consultation later, and we still have no local plan in place. In fact, we would be lucky to get a local plan in place in the next couple of years.
I will give way to the hon. Gentleman in just a moment, after I have dealt with the intervention by my hon. Friend the Member for Bassetlaw.
We should not abandon the idea of a threshold just because it might be more difficult for some people to attend a polling station or another building to register a vote. We all want to ensure that as many people as possible are engaged in the neighbourhood planning process and, indeed, in voting more generally—but I will stick to neighbourhood plans, to avoid getting a direction from the Chair. Polling over a given period of time, and good use of postal votes or electronic voting are among the many different mechanisms that could be applied locally to ensure that the threshold is reached, and that people really are engaged in the neighbourhood planning process.
That is the crux of the issue. The gift of a neighbourhood plan is that it binds a local community together to agree collectively what is best for that community. The benefit of a threshold is that a bar is put in place to say, “You have to be able to demonstrate that the plan has the community support in place.” If one of the arguments is that disadvantaged communities are disfranchised from such processes in a way that middle-class communities are not, a threshold would place a greater onus on ensuring that people are included in the process and in more active ways.
My hon. Friend makes an excellent point, and one that I was going to come to: a minimum threshold could ensure that additional work had to be put in to get a wider, more representative group coming forward and voting for a plan. I was going to draw the Minister’s attention to the activities of Planning Aid England, which works a great deal with disadvantaged communities, trying to get them engaged in the planning process. If the Minister was keen to put a minimum threshold in place, he might want to think about how Planning Aid could be supported, in particular to work with disadvantaged communities to ensure not only that people turn up to vote for the neighbourhood plan, but that they are fully engaged in the plan-making process itself.
When we discuss the later amendment, we will see that analysis of the plans so far indicates that—this is the point that my hon. Friend the Member for Bassetlaw was making earlier—they have a bias towards more middle-class communities.
(8 years, 10 months ago)
Commons ChamberI think that is the fourth time we have heard that from the Secretary of State this afternoon, but that does not make it right. Durham County Council has clarified that, and it thinks that the settlement is totally unfair.
Simon Henig, the leader of Durham County Council, has just sent me a message to say that that aspect was part of the original consultation, and that it does not consider the latest round, which includes the transition fund, to be fair.
I am grateful to my hon. Friend for confirming what I have just said. Those of us in Durham think that the settlement is absolutely shocking because, once again, it hits hardest those councils with the greatest problems and highest levels of disadvantage, such as Durham. I had hoped that the Secretary of State’s comments on Monday would go some way to addressing the balance in favour of areas with the highest need, but I am afraid there was not a glimmer of that. Given the Government’s record of unfairness and widening inequalities, it is perhaps not surprising that the settlement massively favours Conservative councils. In fact, 87% of the funding announced on Monday is going to Tory councils.