Draft Environmental Permitting (England and Wales) (Amendment) (England) Regulations 2023 Debate
Full Debate: Read Full DebateRichard Graham
Main Page: Richard Graham (Conservative - Gloucester)Department Debates - View all Richard Graham's debates with the Department for Environment, Food and Rural Affairs
(1 year, 7 months ago)
General CommitteesI thank my hon. Friend for that really important point. I stress that we are not changing the permits that are already in place and that, critically, must be in place; in fact, we are opening up the opportunity to have a better look at how the whole system works. Indeed, some things will now need to be permitted that were previously not looked at as closely as the mines, for example, so I can give my hon. Friend that reassurance.
Currently, groundwater activities can be permitted only through the use of bespoke environmental permits, which are the highest level of permits—they would relate to coal mines and so forth. My hon. Friend the Member for Amber Valley raised a good point, and that will not change. However, in many cases it can result in unnecessary costs and, in some cases, unnecessary regulatory burden to business. The statutory instrument will give the regulators the ability to grant other types of permits, such as standard rules permits and mobile plant permits. These non-bespoke permits are significantly less costly and will reduce the administrative burden on businesses while, importantly, maintaining environmental standards. The statutory instrument will also introduce exemptions from the requirement to have an environmental permit for new cemeteries that pose a low risk of pollution to the groundwater environment.
The public consultation that we conducted on all the measures that I am describing received 264 responses, and almost all the proposals received majority support. The only exception was the proposal on cemeteries, which received some significant opposition. I have engaged with our all-party parliamentary group for funerals and bereavement, and I met them to listen to all their views. The APPG, too, consulted widely in the industry, so following the feedback and further discussion with key stakeholders, adjustments have been made to the cemetery-specific amendments to enable greater clarity and ease of implementation.
Clarity has been added to the draft statutory instrument so that existing cemeteries will be exempt automatically from permitting, unless the regulators are made aware of proven groundwater pollution. The adjustments have been tested in targeted engagement with stakeholders. Controls will be applied to prevent groundwater pollution by currently uncontrolled pollutants such as heat and micro-organisms.
If I understand paragraph 7.15 of the explanatory notes correctly—that is the one about exemptions for cemeteries from the requirement for an environmental permit—the draft regulations will mean that existing cemeteries do not need an environmental permit, and new cemeteries will be exempt if their risk of pollution is calculated as being low, but there will be some further explanation of that definition of low risk. Is that correct?
I thank my hon. Friend for being so clear, because that is exactly what is stated. If a cemetery is in an area where there might be some implications for the groundwater, the Environment Agency will become involved and permits might be needed. I will get some clearer detail in a minute, but with particular procedures in some burials—potentially involving certain chemicals—one might want permits to be involved. I can get more clarity on that for my closing speech, if that is all right with him.
Heat is now being added as a pollutant. The majority of closed-loop ground heat pump activities will be exempt from the requirement to have an environmental permit. That is to deal with the growth in the ground source heat pump industry. The fact is that they are closed-loop systems—the water is not going into the ground, because it is in a closed loop—so they are considered to be suitable for exemption from requirements unless they are near a protected site or ancient woodland, in which case they would need a permit, just to be super-sure that there is no potential impact from any heat on the flora.
The draft statutory instrument will also help to fix a loophole in the general binding rules for small sewage discharges, which are being exploited, resulting in harm to nearby environmental habitats and local water quality. Thus, the new rules will reduce the risk of groundwater pollution. An example of that is caravan sites, where landowners might be escaping the need for any kind of regulation because each caravan gets rid of its own sewage, instead of it all coming into one area. The measure is considered necessary and was raised in the consultation.
The existing wording of the Environmental Permitting (England and Wales) Regulations 2016 is unclear about the defence that applies to the breach of permit conditions. The draft statutory instrument will help to bring clarity around the liability of sewerage undertakers for breaches of permit conditions that are due to specific circumstances beyond their control. One example of such a breach is an unlawful discharge of waste water into the sewer that breaches the chemical limits of the water company’s permit. The statutory instrument clarifies all that. It does not reduce any protections; in a way, it strengthens them.
The current list of exemptions from the prohibition on direct discharges to groundwater needs to be updated to bring regulations in line with current operational practices and facilitate energy recovery and the latest green technology. The instrument updates that list. There will be a requirement for operators of onshore oil and gas facilities to apply to surrender their groundwater activity permits. They will need to satisfy the regulators that any pollution issues are remediated and that there are no ongoing risks to the groundwater environment at the point of decommissioning or that may arise in future. This measure will ensure that the environment is better protected.
The draft regulations will bring about benefits for groundwater quality, reduce unnecessary costs to businesses and help to ensure that Government resources are being used most effectively to protect and preserve groundwater quality for future generations.