All 1 Debates between Paul Beresford and Geoffrey Clifton-Brown

Restoration and Renewal

Debate between Paul Beresford and Geoffrey Clifton-Brown
Thursday 7th July 2022

(2 years, 5 months ago)

Westminster Hall
Read Full debate Read Hansard Text

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Paul Beresford Portrait Sir Paul Beresford (Mole Valley) (Con)
- Hansard - -

I am delighted that you are guiding us through this, Mr Twigg. I congratulate my hon. Friend the Member for The Cotswolds (Sir Geoffrey Clifton-Brown) on securing this debate. It seems to have had a really good first effect, which is that a motion on the subject will be before the House on Tuesday. I think he can take credit for that, even if it is not quite justified.

As I think everybody in the Chamber would agree, this project must move forward. It is sad that there are not very many of us here. Two colleagues are here from compulsion, and three or four of us are here because we are interested, but out of 650, that is not a very good sign.

We have been looking at this issue for quite some time. The first reference that I could find to the House of Commons looking at it was from 1904, and we have done nothing much since. The need for the works has been set out by the professional here, my hon. Friend the Member for The Cotswolds. I was intrigued when the right hon. Member for Newcastle upon Tyne East (Mr Brown) talked about concreting over. Of course, when we walk into the subterranean areas of this building, we see that we cannot concrete “over” everything, because we are talking about all along the floor, all across the walls and all across the ceiling. I am a little taller than the right hon. Gentleman, and I find it quite difficult to walk down there. If everything were cleaned out, it would be a straight walk, and we would not have to hunch down. That is an indication of the amount of stuff there. As he said, we are talking about sewage, water, electricity and fibre. Nobody knows whether some of the electric wires are working, and whether there is any power in them. The insulation is coming off. There are fire detectors from one end to the other, and somebody walks up and down checking it 24/7, because we do have fires.

The basic structure of the building seems to be in reasonable order, as far as I can tell, although we have learned a few lessons from the Elizabeth Tower, where, when we lifted a brick, we found a frog underneath it; I guess we will find that. I hope that we can explain to the public that if we come up with an assessment of costs, it will undoubtedly be expanded upon, because we do not know what is underneath, or some of the problems that we will find.

The services really need to be sorted. My belief, having walked up and down the basement and above it, is that they have to be taken right out from end to end—a complete removal and replacement. At the end of January 2019, we debated the state of the infrastructure, and we agreed that the work should be done, and that it should get moving, but nothing has really happened. I am delighted that we managed to get work on the Elizabeth Tower moving; mostly that has been done because it was separated out and totally independent. The task is absolutely enormous. However, one does not need to be an expert to realise, even before somebody gets down to the basement and has a look at it, just how enormous the task is. I have taken one or two members of the press down there who were scathing about the costs until they went. Even the most scathing of them, from The Telegraph, came back saying, “You’re right. It’s got to happen. It’s got to be done.” If we do not do it, we are in for real problems.

There are some little things that my hon. Friend the Member for The Cotswolds, who is an expert in the field, did not mention. We have little problems, such as 86 vertical chimneys running right along one passageway. That is where the heated air was supposed to go up. If there is a fire in the basement, it will go through the building as if it was made of timber. The trouble is that those chimneys now carry a mass of the services that run horizontally and are then directed up. There was mention made of the Chamber being built in the ’50s; I was not around and did not see it, but I understand there is an awful lot of stuff behind the panels. The panels of the Chamber will have to be pulled off, and everything will have to be cleared from behind them. Replacements will have to be put in if necessary, and then the panelling needs to be put back. That makes it rather difficult to think we could use part of it alongside that work.

There are gas pipes, air conduits, steam pipes, telephones, and communication fibres, and then there is that ghastly, huge, overloaded sewage system. The infrastructure serves the whole building from end to end, and vertically through the chimneys, and there is a duplication of it in the roof. I do not know if anyone in the Chamber has been in the roof and seen it, but it is a smaller edition of the horrendous mess in the basement.

The dangers of asbestos are well known and talked about. When I went down to the basement, I asked the engineer, “Where is all the asbestos?” He replied, “Well, they didn’t know about asbestos when they put it in, and they went in with buckets of it and big brushes and sloshed it up and down over the walls.” In other words, it is absolutely everywhere.

Geoffrey Clifton-Brown Portrait Sir Geoffrey Clifton-Brown
- Hansard - - - Excerpts

The situation is actually more serious than my hon. Friend suggests. Each one of those ventilation chimneys is surrounded by asbestos. Virtually every Committee Room in this House has asbestos in it. The experts need to tell us whether it needs to be removed.