Indeed; aspects of the process, including which services are covered and where the investment goes, can be confusing for passengers and for our constituents.
I will come back to train delays and cancellations, which are one of the primary concerns that my constituents contact me about. Claire told me,
“At least I've been able to take my booked trains this year. Last year 50% of the trains on which I'd booked a seat were cancelled.”
LZ said,
“Appalling, over-priced service. For nearly 2 months in October and November 2018 I travelled between Frome and Bristol 4 times a week…and it was ON TIME just 3 times! The carriages are dirty, too cold in the winter and in the summer trains were cancelled for being too hot.”
The House of Commons Library briefing that I mentioned absolutely confirms that performance has seriously deteriorated. It says that in the last four quarters, fewer than 85% of GWR services have arrived at their final destination within five minutes of their scheduled arrival time.
Research by Which?—interestingly, it just opened a support office in my constituency—ranked GWR 20th out of 30 UK train companies for commuter rail services, with an overall customer score of just 47%. It received just two stars for punctuality and value for money, which are both critical aspects of train travel. When ranked for leisure rail services, GWR also ranked 20th out of 30, and achieved a slightly higher—although not very good—customer score of 56%.
The latest statistics from GWR’s own website, for 9 December to 5 January, show that only 90.7% of trains were punctual within their five minutes on-time allowance—below GWR’s own target for punctuality. That is extraordinary. The reasons for those delays—based on my investigations and conversations with different stakeholders—appear to be a series of problems, including delays and overruns of electrification works; staff shortages and aspects of staff training, to which inadequate time is dedicated; failures of new rolling stock, with the DFT introducing new trains without an adequate testing period; and delays in delivery while old stock was transferred early to Scotland, which left no contingency.
There is also another series of issues to do with communication and confusion among the different parts of this convoluted system, between which a blame game has developed. GWR will blame Network Rail and the Department for Transport; Hitachi will blame the Department and GWR; Network Rail will say, “It’s not us, guv, it’s the GWR franchise owners and the Department for Transport.” That is simply not good enough. In a tweet, the Welsh Labour leader of Newport City Council said to me that the high fares, such as a £200 return from Newport to London, are
“outrageous, especially when you have to stand all the way to Swindon on the return journey.”
She also mentioned the delays and cancellations.
I thank the hon. Gentleman for giving way—he is being extremely generous with his time. His point about customers’ and constituents’ frustration about the delays is an important one. In my patch in the west midlands, where GWR also operates, those frustrations are often driven by a lack of staff. That causes frustration to the extent that, when they have a choice, some of my constituents drive up to 45 minutes to use an alternative railway line. Does he agree that that does that not make sense for my constituents and is disturbing for them, and does not make sense for the company either?
Indeed—nor does it make sense for the environment and reducing carbon emission, which we all know is crucial. I feel quite sorry for the GWR staff at times, because they do an incredible job and work very hard. When speaking off the record, they are often just as frustrated about the lack of training and support that they are given. They often have to deal with complex problems, such as failures of the new rolling stock, when they have not been given adequate support to do so.
I will mention some of those particular problems. On the new trains, there have been door failures. We get frequent complaints about the seats, which are supposedly ergonomically designed but are some of the most uncomfortable seats someone could ever sit on. As for catering, we were told that they were going to get rid of the buffet cars on the London to Cardiff services, but that was not what passengers wanted. Often, a trolley with no hot water comes through, and it will only go through half of the train—that is if it can get through the train because, of course, if the train is overcrowded, it cannot. There have been issues with train safety systems failing, with the reservations system simply not working, as well as generator problems caused by the fact that bi-modal diesel and electric trains are running more on diesel because of delays to electrification. As a result, the engines sooted up and failure rates rose.