Heritage Sites: Sustainability Debate

Full Debate: Read Full Debate
Department: Department for Business and Trade
Tuesday 20th June 2023

(11 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Matt Rodda Portrait Matt Rodda (Reading East) (Lab)
- Hansard - -

It is a pleasure to serve under your chairmanship, Mr Dowd. I thank the hon. Member for Caithness, Sutherland and Easter Ross (Jamie Stone) for his excellent opening speech and his commitment to the important matter of heritage and its connection with sustainability and the wider environment.

I would like to address my remarks to the question of the future of Reading gaol, which is a grade II listed building. It is famous for being the place where Oscar Wilde was incarcerated, and it was designed by the famous Victorian architect George Gilbert Scott, who was responsible for a number of well-known Victorian buildings in London, including the Albert memorial and St Pancras station. Sadly, the gaol has been mothballed since 2013 and faces an uncertain future. Locally, we would like to see this historic building reused as an arts and heritage hub and preserved for the community, possibly with some support from outside benefactors. We have had interest from Banksy and, indeed, members of the arts community.

When the Minister responds, I hope he will indicate that he has passed on my concerns to the Ministry of Justice, which owns the site. Sadly, the Ministry mothballed the gaol in 2013. It spent a large amount on maintaining the building’s integrity, but it has not sold it, and has not wished to sell it, to a community-led bid, despite an offer of interest from Reading Borough Council. The council and I are waiting to hear from the Ministry what the future of the gaol might be. We would very much like the Government to reconsider the community interest in the future of the gaol and to look at an arts and heritage hub as a possible future use for the building, so I hope the Minister will be able to address that. I thank you, Mr Dowd, for allowing me to briefly speak about this matter.