High Speed 2

Mark Lazarowicz Excerpts
Thursday 13th October 2011

(13 years, 1 month ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Geoffrey Robinson Portrait Mr Geoffrey Robinson (Coventry North West) (Lab)
- Hansard - - - Excerpts

The purpose of asking yet again for a debate in the Chamber on high-speed rail was that, having had two very successful earlier debates in Westminster Hall, we knew that there was a great deal of interest throughout the House among Members representing virtually all the constituencies that have an interest in it. I am very pleased to see the remarkable attendance we have this afternoon, and to follow the hon. Member for South Northamptonshire (Andrea Leadsom), who has just opened the debate.

Those who attended the demonstration in Old Palace Yard this morning will have seen that there was a good turnout and a lively response from lorry drivers and others in relation to what we still call HS2. I am pleased to say that one lot from your constituency, Mr Speaker, remarked that they were anxious to speak to your good self about it, and I carry their best wishes and thanks to you. I said that you would almost certainly be in the Chair for the debate today, so I am pleased to see that you are indeed there.

The various points that have consistently been made against this project remain, but they have not been answered in debate or by the Government. The hon. Lady covered virtually all those points in her opening remarks. I am limited for time, and I intend to stay well within the 10 minutes because I know that a lot of Members wish to speak, but let me say that although the point about people being local or nimbyish about this issue is fair, I do not think that any MP who sticks up for his constituency should be at all apologetic about it. That is what we are sent here for, and if we do not do it, why are we here?

We have to take into account the national dimension, but I am prepared to say that I, and my Labour colleagues from Stoke and Coventry, certainly will not benefit from this project at all. I can see the arguments for Manchester, York, Leeds and other areas, which are well represented on the Opposition side, but it seems to me that we are doing things the wrong way around. I can see some benefits—although not the regional benefits that the Government claim—for Manchester, Leeds in particular, and York of being connected to a high-speed link to Birmingham and from there to London, but I think we should start the whole “Y” the other way around. We should start the line where it is most needed and most appreciated—from the north to the south. What is very clear, if we are honest about this, is that we do not desperately need the line from London to Birmingham. We are well served with trains every 20 minutes, and we are only going to get 30 minutes off the journey at best.

Geoffrey Robinson Portrait Mr Robinson
- Hansard - - - Excerpts

I will in a moment if my hon. Friend will hang on just a tick. I have only got 10 minutes, and time taken now will shorten someone else’s time.

We really do not need this project. What we need is for the pinch points to be relieved and some of the capacity bottlenecks to be relieved, and we could get the whole capacity increase we need on that line. Centro, which is responsible for the west midlands portion of the line, has said that it desperately needs that to be done now. That is the way to do it, not to wait until—

Geoffrey Robinson Portrait Mr Robinson
- Hansard - - - Excerpts

I will give way in a moment, but I know what my hon. Friend is going to say because he represents a Birmingham constituency. I take those points too, but on the argument about this being a regional policy, let me say that any remotely sensible study that has been done on it says that 75% of the jobs are going to be created in the south-east, so we should forget the idea that it is a regional policy: that does not stack up. It is a convenience for certain metropolitan centres in the north, and the idea is that if ever it gets up to Edinburgh and Glasgow it could be a spinal cord that unites the country despite the tensions we feel at present—so why not start it up there? Why not start it from Leeds or York? That is what needs doing—and urgently—but of course they will not do that, because everyone knows that the subsidy for that area would be enormous and could not be justified. It can be justified only for the small London-Birmingham stretch where the subsidy will be highest, and it will not benefit ordinary travellers in any sense. It will be subsidised to a massive extent by the taxpayer and, by those businessmen, and others—

Mark Lazarowicz Portrait Mark Lazarowicz
- Hansard - -

Will my hon. Friend give way?

Geoffrey Robinson Portrait Mr Robinson
- Hansard - - - Excerpts

I know that my hon. Friend has been trying to get in, so I will give way just this once and then I will make progress.

Mark Lazarowicz Portrait Mark Lazarowicz
- Hansard - -

I am grateful to my hon. Friend for giving way. Some of his points about where the benefits would flow with high-speed rail are important, but surely what he is assuming is that people would just build the line and there would be stations but nothing else would happen. The whole point is that high-speed rail offers opportunity for much more comprehensive economic planning built around a high-speed rail network. It is not just a high-speed railway and stations on their own; it is part of a much wider approach that is required.

Geoffrey Robinson Portrait Mr Robinson
- Hansard - - - Excerpts

I am delighted to hear my hon. Friend talk about economic planning. I think that, sadly, that went out in 1966, when the Labour Government ditched the national plan. Let us be hard-headed and realistic about this. HS2 will have some benefits, and certainly it will help businesses to travel more quickly to London, but that is about all we can say. If I were a Manchester MP I am sure I would be supporting it, but below there it does not make any sense at all.

--- Later in debate ---
Roger Godsiff Portrait Mr Roger Godsiff (Birmingham, Hall Green) (Lab)
- Hansard - - - Excerpts

Many people are using public transport more these days, particularly the railways, despite the extortionate fares that train operating companies extract from customers for the cheap but not very cheerful service they usually get, particularly on commuter lines. I very much welcome the increased use of public transport, because it reduces carbon emissions and is generally better for the environment.

Two acts of monumental folly have affected the railway industry in the past 50 years. The first was the decision in the early 1960s by the Conservative Government of the day to let Dr Beeching butcher Britain’s network of branch lines, which had linked communities across the country. The second was the decision by another Conservative Government to privatise the railways in the early ’90s, a decision that even the arch-privatiser, Mrs Thatcher, had the good sense not to pursue. Of course, this has meant that the taxpayer has been paying vastly more in subsidy to train operating companies and to the network than was ever paid pro rata to British Rail. I hope that the coalition and the Minister will not, over this decision, make it three monumental follies in a row.

The coalition proposes that we spend £32 billion by 2026 on a new rail project from London to Birmingham, which then goes on to Leeds and Manchester by 2032, allegedly saving 30 minutes’ travelling time from Birmingham and 50 minutes from Manchester. The fact that business people invariably travel first class and can use their computers and communications networks while travelling, while others will remain in Birmingham, Leeds and Manchester and hold meetings using video conferencing facilities, is dismissed by the vested interest groups, which see a massive tranche of public money that they would like to access.

At a time when ordinary people are facing massive reductions in their living standards, living under threat of losing their jobs and watching their community services such as libraries, Sure Start centres and centres for elderly people being axed, we are prepared to commit £17 billion, the estimated cost of the line from London to Birmingham, in order to get business people from Birmingham to London 30 minutes sooner—always assuming that there are no high-speed leaves on the line and the high-speed signalling equipment actually works.

Mark Lazarowicz Portrait Mark Lazarowicz
- Hansard - -

Will my hon. Friend give way?

Roger Godsiff Portrait Mr Godsiff
- Hansard - - - Excerpts

Time is limited, so my hon. Friend must forgive me.

No wonder an online survey by the Birmingham Post showed that 75% of respondents were against the project.

What other inflated claims are made for the project? It is said that it will help to diminish regional inequalities and promote growth, but there is no evidence of that. If we look at what has happened in Japan, Spain and France, we find that the high-speed connections there have benefited the hub much more than the outer communities.

What about the effect of the project on towns and cities that High Speed 2 will bypass? The deputy leader of Coventry city council says that the plans for High Speed 2 send a clear message that

“Coventry is not a place to stop.”

Bearing in mind what my hon. Friend the Member for Coventry North West (Mr Robinson) said about Birmingham, I suggest that that might not be a bad idea.

Where high-speed trains do work is in countries with large land mass, but in other, smaller countries they take resources from humbler but more needed schemes, such as the upgrading of existing networks, signalling and infrastructure. Unfortunately, however, we all know as politicians that unveiling a new signal box tends to appeal less than inaugurating a futuristic new service. The project’s other exaggerated claims have already been dealt with.

--- Later in debate ---
Kelvin Hopkins Portrait Kelvin Hopkins
- Hansard - - - Excerpts

I thank the hon. Lady for her support. We have neighbouring constituencies and share the rail route that runs through our towns.

In the end, the problem comes down to the west coast main line, which needs the signalling to be upgraded to the most modern standard, more train paths, and to get the freight off the line. Freight and passengers do not mix. Freight trains move more slowly, and they damage the track more than the lighter passenger trains, so we need to invest in a dedicated freight line running up the backbone of Britain, from the channel tunnel to Glasgow, linking all the major conurbations. I have supported that scheme for a long time, and it would take 5 million lorries a year off the roads, as well as removing all the freight traffic from the east and west coast main lines. The passenger routes need to be separated from the freight routes and upgraded to improve capacity. I believe that that is what we need, and that is why I am sceptical about the HS2 scheme.

That freight route could be built in four years for as little as £6 billion, and it would cause no environmental difficulty because it could use existing under-utilised routes and old track bed could be brought back into use. That, and a couple of tunnels, would make the whole thing work. I have made this case time and again in the Chamber over the past 14 years, and I have mentioned it to the Minister of State. I have presented a paper on it to the Transport Select Committee. I also know engineers who have worked on the scheme and worked the details out. It just needs to be done. Fifteen of us had a meeting with the Secretary of State for Transport in the previous Government to put our case for the scheme, but the Department was so hostile because a small section of our proposed route overlapped the route it wanted to use for HS2. Even if HS2 is built, the lines could be paralleled at that point. There would not be a problem.

We need a freight route that is capable of taking full-scale lorry trailers on trains. That could never be done on existing routes without incurring the prohibitive cost of raising all the tunnels and bridges throughout the network. We need a track that has the capacity to take double-stack containers. Most of our existing routes cannot even take standard 9 feet 6 inch containers. We also need a track that has the capacity to take continental trains, which currently cannot get through our platforms because they are too wide, the gauge is too big. We need to be able to accommodate trains travelling from, say, Rome to Birmingham carrying San Pellegrino water.

Mark Lazarowicz Portrait Mark Lazarowicz
- Hansard - -

My hon. Friend is making a powerful argument for a major extension of the rail network. Given that one of his reasons for opposing HS2 is its cost, will he give us an estimate of the cost of all the various improvements and new lines that he has just described?

Kelvin Hopkins Portrait Kelvin Hopkins
- Hansard - - - Excerpts

Some two or three years ago, we had lunch with some people from Bechtel, one of the train manufacturing companies. We were talking about a cost of £4 billion or £5 billion at that time. We talked about an outside figure of £6 billion, but the Bechtel representative looked at the scheme and said he could do it for £3 billion. That would be a fraction of the cost even of Crossrail, which I support. This is not about cost, however; it is about whether HS2 is necessary. I think that we could achieve the desired result by doing it differently. We could upgrade existing routes to serve all the intervening towns, and we could provide the necessary capacity by getting all the freight off those lines and on to a new freight route. I ask the Department for Transport to take our scheme seriously, because that is what we need for the future.

--- Later in debate ---
Julian Huppert Portrait Dr Julian Huppert (Cambridge) (LD)
- Hansard - - - Excerpts

We in the Liberal Democrats have long supported high-speed rail, and we are delighted that the Government of whom we are part are going to deliver on that commitment. A sustainable transport system fit for the 21st century was at the heart of our 2008 policy paper, “Fast track Britain”, our 2010 election manifesto and now the coalition agreement. We need increased capacity on our railways. Over the past 50 years, the length of our rail network has roughly halved, but since 1980 the number of passenger journeys has doubled. Quite predictably, that has fuelled overcrowding and led to eye-watering price hikes.

The extra capacity that the HS2 project will provide is not a luxury; it is a cold, hard necessity that we cannot afford to ignore. Network Rail estimates that by 2024 the existing line to Birmingham and the north-west will be full. Serious congestion on commuter services at the southern end of the line is already harming passenger welfare. Unfortunately, the key issue of capacity crisis has been obscured by an obsession with journey times. Yes, speed is important, but capacity and the number of trains is as important, if not more so.

High-speed rail will release huge amounts of capacity on existing lines: demand will no longer outstrip supply on parallel train routes. We need that capacity. The only alternative to building the high-speed railway line would be to build the same line, but for trains to run at slow speed. That would save us a small amount—about 9% of the construction costs—but we would not get the benefits of high speed.

We have heard that there is no need for a new line, that the few shortfalls can be tweaked and that we can cope with the inevitable increase in traffic. That is simply not the case. These proposals do not take proper account of the decades of upgrade work that would be required, with no alternative train line that could be fully used, or of the huge impact on reliability. If every possible train path is used on a line, there will be no capacity to cope if a single train is delayed: it throws everything out of whack. We need that capacity. Having massive infrastructure works on an already overcrowded line is not an option. It is not even a quick fix; it is completely unrealistic.

Mark Lazarowicz Portrait Mark Lazarowicz
- Hansard - -

I am grateful to the hon. Gentleman for giving way on that point. Would not the undoubtedly massive disruption be a major negative economic factor to be included in the business case on the consequences of a high-speed line or of trying to upgrade existing lines?

Julian Huppert Portrait Dr Huppert
- Hansard - - - Excerpts

The hon. Gentleman makes an excellent point; indeed, those consequences should be taken into account.

Hon. Members who oppose High Speed 2 should be aware that they are arguing for increased overcrowding on the west coast main line, increasing the chances of delayed commuter services, committing themselves to a disruptive and ineffective infrastructure programme, and delaying by only a matter of years the inevitable construction of a second line through the country.

--- Later in debate ---
Mark Lazarowicz Portrait Mark Lazarowicz (Edinburgh North and Leith) (Lab/Co-op)
- Hansard - -

I support the extension of high-speed rail north of London, not just because I believe that it is in the best interests of my constituency and of Scotland but because I believe that it will benefit the whole United Kingdom in economic, transport and environmental terms. It makes sense for many reasons, including the need to increase capacity, which other Members have mentioned. Incidentally, the idea that the only people who use long-distance trains are rich businessmen will come as something of a shock to those who regularly use east-coast and west-coast lines. The development will, in fact, benefit many people throughout the country.

The existing network needs to be modernised in various ways, but it is ridiculous to suggest that it is possible to solve the capacity problem throughout Britain simply by modernising and upgrading it. As I said in an intervention, trying to replicate high-speed lines on the routes of existing lines would lead to decades of disruption and economic disbenefits. It is cheaper to build new lines, and, as the hon. Member for Cambridge (Dr Huppert) pointed out, if new lines are to be built anyway, they might as well be high-speed lines if possible.

I do not support high-speed rail just for the sake of it—just because I want trains to travel as fast as they can. I accept that, in some localities, lower speeds may be acceptable for environmental reasons on the wider network. The fact remains, however, that reducing travel time between parts of the United Kingdom will create a number of benefits. Moreover, extending the line not just to Birmingham, Manchester and other parts of what, to me, constitutes southern England, but further north to Edinburgh and Glasgow, will produce the maximum economic and environmental benefits. The longer the journeys involved, the greater the possibility that passengers will travel by rail rather than air, and the more will be saved through high-speed rail. It will be possible to make significant cuts in air travel from Scotland to London if journey times can be reduced to less than three hours, and the same applies to road travel between Scotland and the north of England.

Kelvin Hopkins Portrait Kelvin Hopkins
- Hansard - - - Excerpts

In 1992, having freed up the line, British Rail ran a test train from King’s Cross to Edinburgh at 140 mph, and did it in the same time as HS2 is proposing for its trains.

Mark Lazarowicz Portrait Mark Lazarowicz
- Hansard - -

I think that that makes my point about capacity. Obviously, the line could not operate like that every day, because a fair number of trains would be running at the same time.

Many of the business cases for the extension of the line to the midlands and the north of England do not take account of the economic benefits in business and tourist travel that would result if it were extended to Glasgow and Edinburgh. The increase in passengers would generate economic benefits, and the best business and economic case will be produced if there is agreement that the line should extend to Scotland, ensuring that we are not excluded from the system.

My only worry about the current proposal is that we in Scotland, and indeed those in the north of England, would be at risk if the line extended no further than Birmingham, Leeds or Manchester. Trains cannot start at every part of the country at the same time, but we certainly do not want them to arrive at Birmingham at 2026, at Manchester or Leeds at 2033, and then—if we are lucky—at Edinburgh or Glasgow at 2050. That would be extremely damaging to our relative economic prosperity in the UK.

Tom Greatrex Portrait Tom Greatrex (Rutherglen and Hamilton West) (Lab/Co-op)
- Hansard - - - Excerpts

Would it not be useful if Transport Scotland conducted a feasibility study on a third phase of HS2, working from north to south?

Mark Lazarowicz Portrait Mark Lazarowicz
- Hansard - -

I see no reason for not doing that. The Scottish Government have already expressed their willingness to make some contribution to such work. I think it would be sensible to start the planning now and to include in the development phase the idea that the line should start from Scotland as well as from the south of England. High-speed rail is not a panacea for all our ills, but it does provide opportunities to create economic and environmental boosts. It will also provide jobs, not in the next five or so years, but nevertheless for a long period, and it will provide a major boost to our economy. In the long run, it will help the economies of many parts of the UK.

If this high-speed rail line is built but nothing is done around the stations—if there is no integrated transport or planning development around these rail hubs—we will not get the full benefits from the project. However, if local and central Government, and regions and cities, plan, they can make sure that high-speed rail brings major economic benefits, especially if it extends beyond Birmingham to the north of England and beyond. I support this project, therefore, and hope that we move ahead as quickly as possible, but Scotland must not be left at the end of the line.