All 4 Debates between Luke Pollard and Andrew Jones

Zero-emission Buses

Debate between Luke Pollard and Andrew Jones
Tuesday 5th July 2022

(1 year, 9 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Andrew Jones Portrait Andrew Jones (Harrogate and Knaresborough) (Con)
- Hansard - - - Excerpts

It is a pleasure, as always, to serve under your chairmanship, Mrs Murray. I start by congratulating my right hon. Friend the Member for Scarborough and Whitby (Sir Robert Goodwill) on securing the debate. I, too, am a member of the all-party parliamentary group for the bus and coach industry. It is great to see such enthusiasm for buses. I was the bus Minister for the Bus Services Act 2017, and it was not that easy to generate enthusiasm from colleagues. The situation is much improved.

As has been said already, it is buses that do the heavy lifting of our public transport system. We must remember that carbon emissions from transport are 30% of our total carbon emissions. No progress on getting people to switch modes, on boosting passenger numbers on buses or on removing carbon from our bus networks will mean it is much harder for us to hit our overall net zero objectives. Thus, I strongly support the initiatives to boost the roll-out of zero-emission buses across the country. It has been happening for a little while—as bus Minister I did some of this work, but the work also predated me. The work on that goes back to the last Labour Government, when the technologies became available and the bus Ministers at the time saw the opportunities and grabbed them. It has been happening in stages over a period of time.

I was clear that the technology has presented significant opportunities, and it has been made clear in the debate so far that there are different technologies available. The points on hydrogen made by my hon. Friend the Member for Redcar (Jacob Young), who always speaks with passion and detail on this subject, were spot-on. The hydrogen opportunity is exciting and it is also changing quite fast.

We have many electric buses in Harrogate and Knaresborough already. They have been delivered by The Harrogate Bus Company and we are shortly due to have some more. There is a £20 million project, which includes £7.8 million from the county council, as part of the zero-emission bus regional areas scheme, or ZEBRA—quite a catchy name—and an investment of £12 million by Transdev, which is The Harrogate Bus Company’s parent company. That will deliver 71 new electric buses for North Yorkshire, with 45 based out of the Harrogate depot, and they will be split approximately 50:50 between single and double-decker buses. The first route to enter into service will be the busy Harrogate to Knaresborough route.

It is also worth noting that as the transition develops, with the buses entering service from summer 2023, dependent on the supply chain—that is the advice I have received from the bus company—that will include the popular 36 route, which is quite famous in the bus world. Stepping on to the No. 36 bus is like boarding an aeroplane and turning left, with libraries and charging points—it is a very comfortable experience. I hope that the Minister will visit and experience that one day.

There are a number of lessons that I would like to share with colleagues about the rolling out of electric buses. It is not as straightforward as just purchasing the buses from the manufacturers—though that is not straightforward either, as has been made clear. There are other things in play here. I want to build on some of the points made by my right hon. Friend the Member for Scarborough and Whitby. He, and all colleagues, are clearly right about the environmental merits of the buses. He also mentioned the longevity of service, with buses entering service and staying there for a long period of time, while churn of the fleet is incredibly helpful in meeting our air-quality objectives. A Euro 6 bus that enters service now is probably replacing a bus from Euro 4 standards, but a Euro 6 bus emits only 4% of the pollutants of a Euro 4 bus. That is not zero-emission but, my goodness, it is significant progress, so fleet churn is quite critical.

I want to highlight some of the lessons we learned from the first phase of electric bus roll-outs in Harrogate. There were operational issues that customers did not see. Quite the opposite, in fact, because customers saw a fantastic new fleet of vehicles that are, by definition, well designed and more modern. They loved the environmental benefits and particularly liked the smooth ride, which is a feature of an electric-powered vehicle anyway, so they were popular with passengers. However, it is not that easy for them to enter service because that may require a reconfiguration of a depot and a transformation of engineering skills at the bus company. If someone has spent many decades working on large diesel vehicles, pivoting overnight to suddenly maintaining electric fleets is not possible, so significant training is required.

The biggest challenge was the electricity supply to the bus station and getting all the underlying utility works done. That was not a straightforward matter and it took a considerable time to get it all right. There are different methods of charging, and in this particular case it is like a train, so a pantograph comes out of the top of the bus, charges in the bus station and then the bus can go off and do its route around town. It is about lots of small charges that people do not even know are taking place as they get on and off the buses because there is a pantograph above them. It is very effective.

I share that information because I think it is critical that the back-office and structural work is considered in the roll-out of electric vehicles. In some parts of the country, significant work will be required to the electricity network, just as for the roll-out of electric charging points.

Luke Pollard Portrait Luke Pollard
- Hansard - -

The hon. Member is making a sound point. I am concerned that the lack of power connections, not only to bus depots but to our ports, means that many non-standard equipment—buses, JCBs, cranes and other things—that could be electric in the future will not be because they do not have the power infrastructure. Does he agree that we need not only a bus strategy but a power strategy that works with the Department for Business, Energy and Industrial Strategy to ensure that those places get the resources they need to decarbonise?

Andrew Jones Portrait Andrew Jones
- Hansard - - - Excerpts

Yes, getting power to the right places in the right quantities will clearly be critical. There will be areas where there are greater levels of usage, and we will need to heavily over-invest up front to make that happen. Whether that is best done through BEIS is a different question; I would suggest that a slightly more localised approach might be better. However, the point about power delivery is clearly correct, as is the point made by my right hon. Friend the Member for Scarborough about the up-front investment required. It is an up-front cost, followed by long periods of service. I know that the hon. Member for Plymouth, Sutton and Devonport (Luke Pollard) was talking about the vehicle costs, but that up-front cost must also include the infrastructure.

That is the critical point that I want to make to the Minister. Will she please consider how the roll-out of these vehicles, whether hydrogen or electric, is done? They are fantastic vehicles, will make a huge difference to the quality of life in the areas they serve, and will help hit our net zero objectives. However, we must ensure that the infrastructure in the background is correct, so the work must take place in parallel. Getting that right will help speed the deployment of the vehicles. I know that that is her objective and that she is very passionate about doing this, so that is why I share this information today.

Oral Answers to Questions

Debate between Luke Pollard and Andrew Jones
Thursday 14th February 2019

(5 years, 2 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Luke Pollard Portrait Luke Pollard (Plymouth, Sutton and Devonport) (Lab/Co-op)
- Hansard - -

As well as announcing funding for the resilience work at Dawlish, will the Government also secure Dawlish-proof trains by moving the HSTs on to the CrossCountry franchise?

Andrew Jones Portrait Andrew Jones
- Hansard - - - Excerpts

We are currently working to add more capacity into the CrossCountry franchise, and Network Rail is looking at how to tackle some of the engineering challenges posed by the impact of salt water on trains. That is work in progress.

GWR and Network Performance

Debate between Luke Pollard and Andrew Jones
Tuesday 5th February 2019

(5 years, 2 months ago)

Westminster Hall
Read Full debate Read Hansard Text Read Debate Ministerial Extracts

Westminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.

Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.

This information is provided by Parallel Parliament and does not comprise part of the offical record

Luke Pollard Portrait Luke Pollard (Plymouth, Sutton and Devonport) (Lab/Co-op)
- Hansard - -

I congratulate my hon. Friend the Member for Cardiff South and Penarth (Stephen Doughty) on securing this debate. Great Western needs to answer questions not just on the Welsh lines, but on the service to the far south-west. It was good to hear from the hon. Member for St Ives (Derek Thomas) about Great Western’s service to the far south-west, but I am afraid I am not drinking the Kool-Aid in the way that he is. We need huge improvements.

Today marks five years since Dawlish was washed away. We all remember the hanging Peruvian rope bridge images. Five years on, there have been soundbites aplenty, and we have had press releases and promises coming out of our ears. If we could lay those press releases next to each other to form a railway, we would have the best train line in the world, but we cannot; we need the money. I really hoped that there would have been a funding announcement to coincide with the five-year anniversary, to show that Ministers get it. Instead, we seem to have half-cancelled visits, planning applications submitted without the funding to go along with them and a lack of understanding about when the money will come.

The far south-west needs and wants its fair share of rail funding. The programme for which Network Rail has submitted a planning application seems to be a good step forward, which would improve not only Great Western services but CrossCountry services that use that piece of track. We need the Minister or the Secretary of State to announce the money. They do not need to come to Devon to do that; they could make their announcement in Whitehall, or the Minister could make it today. All we need is confirmation that the money will come. To date, we have not had that, and the lack of funding for our train line grates on people in the far south-west.

Andrew Jones Portrait The Parliamentary Under-Secretary of State for Transport (Andrew Jones)
- Hansard - - - Excerpts

The hon. Gentleman mentioned half-cancelled visits in reference to me. I know there was a media story about that yesterday. I have never been scheduled to visit Devon; I am afraid that that is just incorrect. I am very happy to ensure he does not inadvertently mislead the House.

Luke Pollard Portrait Luke Pollard
- Hansard - -

I thank the Minister for doing so. If he has not planned to visit, I encourage him to do so, so that he can see the problems we are having at Dawlish.

Andrew Jones Portrait Andrew Jones
- Hansard - - - Excerpts

Did the hon. Gentleman just tell me not to bother visiting, but say in the next sentence that I should visit? I look forward to a visit, but I ask that he be consistent.

Oral Answers to Questions

Debate between Luke Pollard and Andrew Jones
Thursday 10th January 2019

(5 years, 3 months ago)

Commons Chamber
Read Full debate Read Hansard Text Read Debate Ministerial Extracts
Luke Pollard Portrait Luke Pollard (Plymouth, Sutton and Devonport) (Lab/Co-op)
- Hansard - -

5. Whether the next CrossCountry rail franchise will include a requirement to purchase new rolling stock.

Andrew Jones Portrait The Parliamentary Under-Secretary of State for Transport (Andrew Jones)
- Hansard - - - Excerpts

The current CrossCountry franchise runs until October this year, with a possible extension to October next year. The hon. Gentleman should be assured that we are working to look at all options for the new CrossCountry franchise, including rolling stock. We will look at adding much needed capacity to the CrossCountry services as soon as trains become available.

Luke Pollard Portrait Luke Pollard
- Hansard - -

In November, an unbelievable 30% of CrossCountry trains to Plymouth terminated early at Exeter because the Voyager trains could not get through Dawlish in bad weather. As well as placing orders for new rolling stock for the long term, will the Minister look at requiring CrossCountry to use the GWR HST trains that are currently being replaced with newer trains, to give Cross Country extra, interim, Dawlish-proof capacity?

Andrew Jones Portrait Andrew Jones
- Hansard - - - Excerpts

I had a very positive meeting with the hon. Gentleman and his local council leader yesterday. We agree on the importance of the south-west economy, in particular its connectivity, and we recognise entirely the issue with the Voyager trains and how they are affected by the salt water to which they are exposed. CrossCountry is working on an engineering solution to that and we are working on adding capacity to the franchise. Passenger numbers have grown by 25%, so we need to put more rolling stock into it. We will look at where we can get the trains from to expand that capacity.