South West Water Debate
Full Debate: Read Full DebateLuke Pollard
Main Page: Luke Pollard (Labour (Co-op) - Plymouth Sutton and Devonport)Department Debates - View all Luke Pollard's debates with the Department for Environment, Food and Rural Affairs
(8 months, 1 week ago)
Westminster HallWestminster Hall is an alternative Chamber for MPs to hold debates, named after the adjoining Westminster Hall.
Each debate is chaired by an MP from the Panel of Chairs, rather than the Speaker or Deputy Speaker. A Government Minister will give the final speech, and no votes may be called on the debate topic.
This information is provided by Parallel Parliament and does not comprise part of the offical record
Thank you, Mr Henderson. It is good to follow my fellow Janner, the hon. Member for East Devon (Simon Jupp), who brought forward this debate. The performance of South West Water is not good enough: that is felt by the constituents both he and I represent. We need renewed cross-party pressure on the company to invest in the services required to cut sewage spills and to return reliable water usage all year round, as well as to address the concerns about drought in our area.
Raw sewage is the perfect metaphor for the last 14 years. For years, South West Water dished out huge dividends to its shareholders while dumping sewage into our rivers and seas. Our region deserves so much better than that. The most recent data from the Environment Agency has not been published for 2023, but the 2022 figures show there were more than 37,000 sewage spills in the south-west. In Plymouth alone, there were more than 2,000—an average of five spills every day, or 12,750 hours of sewage dumping.
According to South West Water’s live, interactive storm overflow map, as of half-past 3 today there are 26 bathing water locations across Devon and Cornwall that may be affected by the operation of overflows, including two in Plymouth. Having more data is a necessary part of being able to respond to the challenges of a lack of investment in infrastructure over a long time. However, that data must lead to enforcement and to a change in investment behaviour by South West Water in order to start shutting down those storm overflows for routine discharge.
All of us in this House recognise that, in the event of extreme weather, our water system cannot hold that much water—but we are not talking about extreme weather on a day-to-day basis; discharge is a routine daily occurrence from a water company that knows it should not be doing it, but is still doing it. I would like the water company to be more honest with customers and parliamentarians about what needs to be done to get to a point where all those storm overflows do not routinely discharge on a daily basis.
The hon. Member talked about how data on sewage spills is gathered. Does he agree that, rather than water companies having complete control over gathering data on sewage spills, that function ought to sit with the regulator, the Environment Agency?
I am not a huge fan of the Environment Agency—I like the people who work there, but there are just not enough of them. Certainly, since 2010, Environment Agency funding has been cut by over 50%, which creates real challenges in the efficiency of prosecutions. Prosecutions that take years do not represent justice delivered quickly, or fines going to the affected communities quickly; they represent justice delayed, and something that can be built into the company’s daily business operations.
I will pick up on a final point before I finish: the investment that South West Water is making at Devil’s Point in Plymouth. As a regular wild swimmer there—I swim all year round, in shorts or wetsuits, depending on the time of year—I am grateful that the Minister and his predecessor authorised the campaign I was running for a new bathing water status at Devil’s Point and Firestone Bay. That is very welcome. The data collection there shows excellent water quality nearly all year round, but the two private raw sewage outlets that pump untreated human effluent into that important part of Plymouth Sound are not acceptable. I am grateful to South West Water for starting the work on closing those and adopting those raw sewers, but that work is taking too long and I would like to see a greater urgency in delivering it. We know raw sewage is going into our sea, and the action taken there should be quicker.
I encourage the Minister to keep pressure on South West Water, because as a water company it is not investing enough in the infrastructure we need. I have long-term concerns about the amount of water in our system to prevent future droughts and water restrictions in the summer. I would be grateful if the Minister could keep that pressure on South West Water, so that the region gets the water and sewage services that we deserve.