Heavy Commercial Vehicles in Kent (No. 1) (Amendment) Order 2021 Debate
Full Debate: Read Full DebateLord Rosser
Main Page: Lord Rosser (Labour - Life peer)Department Debates - View all Lord Rosser's debates with the Department for Transport
(3 years ago)
Grand CommitteeAgain, I too thank the Minister for her explanation of the purpose and content of the orders we are discussing.
The Department for Transport has said that Operation Brock was originally created to deal with disruption caused by our exit from the European Union and then in response to the Covid-19 pandemic. As I understand it, Operation Brock creates, among other measures, a contraflow road layout on the M20 and the setting up of concrete barriers so that lorries heading for mainland Europe can queue on the coast-bound carriageway if there are disruptions or delays at Dover or the Channel Tunnel. Any decision to put out or remove the concrete barriers involves the Government.
The Government now want to remove the sunset clauses from Operation Brock on the basis of the argument that this will mean the Kent Resilience Forum will be better prepared to respond to any type of traffic disruption in the area not related to our EU exit, including industrial action and severe weather. I do not know whether the industrial action reference is to possible action by heavy goods vehicle drivers, who have sought unsuccessfully to get a better deal following the Prime Minister’s assurance that they should be paid more.
This Government claim to be averse to ratcheting up regulation, yet here we have a regulation that was brought in on a temporary basis to address the chaos of the Prime Minister’s Brexit deal and his inadequate response to the Covid-19 pandemic—as set out in the recent joint report from two Commons Select Committees, both chaired by two of his own MPs—now being made permanent, despite the fact that the Government have removed most Covid restrictions and tell us that the PM’s Brexit deal has only upsides and no significant downsides. Can the Government explain why, if disruption at Dover and the Channel Tunnel from industrial action and severe weather is such a threat that these temporary orders must now be made permanent, it was not considered necessary to bring them in in the nine years from 2010 to 2019?
The striking thing about the two Explanatory Memoranda is that they offer no evidence or explanation why making these orders permanent is necessary or what the consequences, based on past experience, would be if the sunset clauses were applied to Operation Brock. In essence, the Explanatory Memoranda—and thus the Government—are saying that these powers would be nice to have in perpetuity, even though we have no clue how frequently and for how long they would be needed, even based on past experience. In the absence of any proper case being made, this appears to be an example of a government desire to have powers for the sake of it.
The other possible explanation for making these powers permanent is that the Government know that the Prime Minister’s Brexit deal has significant downsides and are expecting significant disruption or delays at Dover and the Channel Tunnel if relationships with the EU in general, and the French in particular, deteriorate still further. In that situation, the Government would attribute the need to make these orders permanent primarily to delays for some other reason—such as industrial action or severe weather—rather than admit that the Prime Minister’s brand of hard Brexit is not all sweetness and light for Britain. The Explanatory Memoranda slip in a reference in paragraph 8 to
“delays from customs checks at the international borders in Kent”,
which may refer to the continuing problems associated with the Prime Minister’s Brexit deal.
I ask the following questions, to which I would like a full government response, either today or subsequently. As far as I can see, although I may be wrong, none of these questions is addressed in the Explanatory Memorandum. First, what happened before Operation Brock when there were delays at Dover and the Channel Tunnel unrelated to our EU exit or Covid? Once again, if those delays were so bad that the Operation Brock powers now need to be made permanent, why did the Government allow that position to continue for nine years from 2010?
Secondly, on how many occasions since 2010 has disruption caused by severe weather been such that Operation Brock would actually have been brought into operation, and for how long, had the now proposed permanent powers been available?
Thirdly, on how many occasions since 2010 has disruption caused by industrial action been such that Operation Brock would actually have been brought into operation, and for how long, had the now-proposed permanent powers been available?
Fourthly—as the noble Baroness, Lady Randerson, asked—on how many separate occasions since the present regulations first came into effect has Operation Brock been brought into operation in full, for what reason, and for how long on each occasion? As has been said, we have not had an evaluation of the effectiveness or otherwise of Operation Brock to date, yet these powers are being made permanent.
Fifthly, what is the cost of building and removing on each occasion the Operation Brock contraflow barriers on the M20? Have there been any occasions when the barriers have been put up and then removed without being used?
Sixthly, how many additional traffic officers have already been required in connection with Operation Brock and it being brought into effect, and how many will be required if the sunset clauses are removed and the order becomes permanent?
My seventh question relates to the Explanatory Memoranda, which refer to a national consultation between 26 May and 20 June this year, and say that key affected stakeholders in Kent were
“made aware of the consultation when it launched”,
whatever that phrase means in practice. We are then told, as has already been pointed out, that the consultation received 14 responses, which the Government admit was “low”, but that it included “members of the public”. Has any other national consultation received just 14 responses? Were the views of local residents actively sought? In some quarters, Operation Brock has proved controversial, with complaints from some local residents affected about disruption caused during work to install the required infrastructure.
I hope that the Government in their response will, not only today but subsequently, provide answers to the questions that I and others have raised, but also provide a rather better argued case than is contained in the Explanatory Memoranda as to why this order must now become permanent, contrary to what we had been told would be the case up to now. Clearly, something of some significance must have happened or come to light, which could not have been known or appreciated before, to justify the Government’s change of mind over bringing into effect the sunset clauses. We are entitled to be told exactly what that something is and the detailed case for the Government’s U-turn over the sunset clauses. I await the Government’s response.
My Lords, I thank all noble Lords for their considered contributions today. I hope to put their minds at rest—but also I shall write, because I do not quite have all the answers to the questions. That always annoys me a bit, but I shall do my best.
Briefly, I would like to take noble Lords back, although I am afraid that my memory is a bit dodgy, to what is probably just over 10 years ago, when I remember spending many hours with my children in a hot car in Kent trying to get across the short straits. It was dire. I sat on a local road in Kent for hours. I think it was due to industrial action—it was a sunny day, so it probably was not bad weather. But we know that, when there is disruption at the short straits, Kent stops. What we are trying to put in place today is something to help the people of Kent. I shall endeavour to set out the rationale behind that and how the interventions that we have put in place to deal with a potential no-deal exit and Covid turned out to be good things—progress, so to speak. That progress should be grasped on this occasion, and not left to rot.
Looking at where we are, the whole point of these regulations is to put in place a permanent framework around a temporary traffic management solution. My noble friend Lord Naseby asked whether it had been successful. I would say that the proof of that is in the pudding. It has been successful; we have not had great big tailbacks in Kent. We also know that it is more effective than the previous intervention, Operation Stack, which really did not go down very well with the local community.
The whole point of Operation Brock is that it allows HCV drivers to be stationed on the M20 and stops them rat-running through local roads and blocking them, as happened on my very unfortunate journey many years ago. It will only ever be used in the event of significant disruption at the short-strait crossings. The noble Lord, Lord Rosser, read an awful lot into that, which I am afraid is simply not there. All sorts of things could cause disruption at the short straits. The whole point of what we are trying to do today is that, if there is any disruption, the county of Kent does not come to a standstill, because that is not good for people trying to cross the short straits and certainly not good for the people of Kent.