Lords ChamberMy Lords, I declare my interests as a director of Peers for the Planet and as a project director in the energy industry, working for Atkins. I really welcome the Bill. It comes at a time of unprecedented challenge for energy, as many other noble Lords have alluded to. Any modern economy requires copious amounts of energy at a price that people, industry and business can afford; that is the economy side of the energy trilemma. But added to this are the other two sides of the trilemma: sustainable supplies that are secure. When considering alternative energy options, it is essential to consider all aspects of the trilemma and it is the resulting complexity of the modern energy system that makes a controlling mind so vital to delivering it. The noble Lord, Lord Moylan, made an articulate case for the issues in balancing the three sides of that trilemma.
Following on from that, most of all I welcome the establishment in the Bill of the future systems operator to be that controlling mind. I have consistently argued in this House over the last three years for an independent architect to oversee and deliver, on a systems level, the net-zero energy system. I was delighted to listen to Sir Patrick Vallance speak at a briefing organised by Peers for the Planet and the Climate Change APPG last week. He strongly made the point at that briefing about the importance of a systems approach to net zero, stating:
“This is a systems-wide problem; it affects virtually every part of every department, and therefore you need a systems approach”.
The future systems operator is exactly what we need to implement that systems approach and deliver the energy system that we need.
However, there is really an elephant in the room regarding the energy system and the Bill: the build rate of new capacity. The noble Lord, Lord Howell, touched upon that in his powerful contribution. We have a world-leading target of decarbonising our electricity system by 2035 but my concern is about delivery. Atkins has undertaken a calculation of the build rate of new capacity required to hit that 2035 target. This is nothing complex; it looked simply at the total capacity required in the BEIS scenarios for 2035 and divided that by 12.5 years, allowing for an estimate of capacity that will need to be decommissioned over that timeframe. The results are eye-opening, to say the least.
From the BEIS scenarios, a minimum of an average of 12 gigawatts of annual installed capacity is needed every year between now and 2035 to hit the target. The next question is: what have we managed in recent years? In 2019, we managed 2.8 gigawatts; in 2020, we managed 1.1 gigawatts; in 2021, it was 1.6 gigawatts. If we go on like this, it is very hard to see how we are going to meet the 2035 target. A real step-change is required because the upshot is that to replace ageing power plants and ensure enough generation is built to meet the peak demand requirements, the UK needs to build a minimum of 159 gigawatts of new generating assets by 2035. That is the equivalent of building the UK’s entire electricity generation system one and a half times over, in under 13 years. That illustrates the real scale of the challenge.
So I ask the Minister: at what point will the Government publish a clear national plan for achieving that 2035 target and move to a large-scale programme of delivery on a fleet approach for proven technologies such as offshore wind and nuclear generation to speed up the build rate and maintain security of supply?
Continuing on the systems thinking theme, another area I have highlighted previously that needs more attention is the role of local authorities in delivering net zero, building on the remarks of the noble Baroness, Lady Hayman, and the right reverend Prelate the Bishop of Carlisle. Local authorities know their areas best and so will play a key role in areas such as the rollout of clean heat and energy efficiency. Searching through this vast Bill, I was somewhat disappointed to see the word “local” used only 10 times. This is very welcome in the context of heat networks, but we need to do much more.
For example, the Bill could be changed to widen the focus of zoning to cover not only heat networks but also heat pumps and urgent retrofit. The Government already accept that local authorities will be central to decarbonising heat and local area energy planning in particular, but until recently councils have had to competitively tender for funding in these areas. This favours those well-organised councils that have the means to bid for funding, and the result is a patchwork which does not address the overall need. If the Bill could also define clean-heat zones, this would start to address on a systems basis one of the biggest challenges we face in decarbonising our economy. So can the Minister state what plans the Government have to take a wider look at defining the role of local authorities and zoning beyond heat networks to cover heat pumps and urgent retrofit?
I would also like to continue discussions with the Minister on the inclusion of nuclear within the energy sources that are eligible for RTFO—renewable transport fuel obligation—support, placing it on an equal footing with other low-carbon sources. There remains an opportunity here to kick-start the UK hydrogen industry in the near term through Sizewell C’s construction. I look forward to exploring these and other issues in more detail when we return from the Recess.