Lord Davies of Oldham
Main Page: Lord Davies of Oldham (Labour - Life peer)Department Debates - View all Lord Davies of Oldham's debates with the Department for Transport
(11 years, 10 months ago)
Lords ChamberMy Lords, I thank the Minister for repeating the Statement made earlier in the Commons. I welcome the Statement, of course. The Minister made the presumption that there was agreement between the major parties on this project and indeed there is. He will know that I endorse the main strategy that is proposed in the paper, and I welcome the fact that this announcement is being made today.
Inevitably, however, there are differences between us, and I will seek to identify some of them for the good of the Government in the time in which they have to make judgments on this important project. I emphasise to the House that in the long run this project will bring strength to the British economy and relieve the pressure on rail lines, particularly the west coast main line, which the Minister rightly identified as running at very close to capacity, but it has nothing at all to do with the rhetoric that he brought into the Statement about jobs and improving our economy at the present time. The idea that the proposals contained in the Statement, which, after all, refer to a project that will not be completed for over a decade from now, will bring an enormous stimulus to the economy and create jobs at present is quite erroneous. I rather regret that the noble Earl has rightly emphasised that we welcome this. Of course we will do our best in opposition and in government to see the fulfilment of the project.
There are inflections in this speech which seem to be addressed to our contemporary economic troubles. This project is too far away to actually deliver a great deal of improvement prior to the next general election or even several years after that. However we welcome the project for the reasons put forward by the noble Earl, not least in terms of the pressure upon existing rail provision in the United Kingdom. He makes the important point that no railway line has been created north of London for more than 120 years.
The Government are still not committing themselves to aspects which we would have thought would give a real sense of urgency to this timetable. Why does this Statement make no attempt to bring the legislation necessary for phase 2 into the timetable for phase 1? Surely one Bill—which might necessitate a carryover facility—dealing with the whole project is bound to be a better prospect than the Government going through all their travails over London to Birmingham, and then starting all over again with a fresh Bill for the lines north of Birmingham.
We also regret that the Statement makes no real approach towards another area of future transport on which we have sought to establish consensus, namely the future of aviation in the south-east. Why do the Government not address their mind to the possibility of a direct link to Heathrow? Surely that would improve connections as far as airports are concerned? It would certainly help with short-haul flights bringing people into Heathrow if they could then travel speedily by train. That would reduce the pressure on Heathrow for short-range flights and the slots which they occupy, giving the airport, with its present colossal problem, a chance to breathe. As the public know very well, every time we have two or three inches of snow, as we have had recently, there is a crisis at Heathrow because it is right up against the margins of capacity with no flexibility for dealing with such a situation. I regret that there is no suggestion of looking at a link to Heathrow.
Where northern cities beyond Birmingham are concerned, we welcome the fact that Manchester and Leeds are to be served. It should be recognised that we need to look at the rail infrastructure for link-up with other major cities apart from those two. High-speed trains will of course bring immediate and direct benefits to those, but we also need assurances from the Government that issues will be addressed so that those cities which are not directly on the line—only two are—will benefit significantly.
We are concerned about another dimension of the high-speed rail proposals. The lines from the north will connect with High Speed 1, the link to the continent. The intensity of interest in this possibility goes back decades. Since High Speed 1 has been in place, served by the magnificent station at St Pancras, there has also been great interest. However, what will happen to these trains from the north? When they get to London, they are meant to clank around the back part of the rail service which Transport for London regards as critical to all its services around London. That line, of course, has speed limitations, to put it at its mildest. The Government are still looking at a situation in which those from the north will have a slow perambulation around London if they are bent upon getting to the continent.
Nevertheless, there is a great deal in this Statement that we welcome. We welcome the fact that it is being made; at least that is an indication that the penny has dropped for the Government, and that there is some urgency about these matters. However we still feel that the Statement could have been much more clearly expressed in terms of urgency for getting this line constructed, to both Birmingham and the cities of the north.